Application Report
RECONFIGURATION OF A LOT (1 INTO 5 LOTS) 83 BUTLER STREET, TEWANTIN PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSAL COMPLIANCE a) clearly marking vegetation to be retained with flagging tape; b) installing protective fencing around the dripline of vegetation; and c) ensuring stock piling, storage and vehicle parking occur outside the areas of vegetation to be retained. AO12.6 AO12.6 ☐Compliant Where clearance of habitat is unavoidable, No new roads are proposed. ☒N/A once the area disturbed by the works is ☐Performance Solution re-established, replacement habitat is planted in proximity of the works to create native fauna habitat suitable for the area and maintained for the life of the works. PO13 AO13 AO13 ☐Compliant Road infrastructure is constructed to Road infrastructure is constructed in No new roads are proposed. ☒N/A minimise adverse environmental accordance with Council’s Planning Scheme ☐Performance Solution impacts, including from run-off and Policy PSP6 Engineering Design Standards– erosion. Roads, drainage and earthworks PO14 AO14 AO14 ☐Compliant Development is provided with external Where not already existing, the following No new roads are proposed. ☒N/A works— infrastructure components are provided at ☐Performance Solution a) along the full extent of the the frontage of the site— frontage of the site to an a) full width sealed road; appropriate standard having b) concrete kerb and channel where appropriate; BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169 NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481 E: [email protected] W: www.tpalliance.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.