Original source · versioned page text
Application Report
RECONFIGURATION OF A LOT (1 INTO 5 LOTS) 83 BUTLER STREET, TEWANTIN PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSAL COMPLIANCE c) not located within a riparian buffer area mapped on a Biodiversity, Waterways and Wetlands Overlay Map; and d) setback 400 metres minimum from the full supply level of Lake Macdonald. 2.8 Waterways Works Code 2.8.1 Purpose PURPOSE & OVERALL OUTCOMES PROPOSAL COMPLIANCE 1) The purpose of the Waterways works code is to ensure the suitability of development within tidal areas and the waterways of the Noosa Waters Estate. 2) The overall outcomes sought for of the Waterways works code are: a) Development is compatible with the character and amenity of The proposed development will be suitably designed and its surrounding area. constructed to not impact tidal areas or waterways. ☒Compliant b) Development ensures there is no increase to the scale and ☐N/A intensity of commercial operations on the Noosa River and ☐Performance Solution additional commercial leases are avoided. c) Development is designed and constructed in a way to ensure it is structurally sound. d) Development is safe for use. e) Development does not adversely affect— (i) the amenity of the surrounding area including by noise, lighting, odour and air pollutants; (ii) existing public access to any foreshore areas or tidal waters; (iii) safety and navigation of any waterways; BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169 NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481 E: [email protected] W: www.tpalliance.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.