Skip to the record
Beware of cheap imitations.

Council archive · source document

14896 TC - Change to development approval [As Published] · 51985.3785.04

of 38

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

10.

Page 4 of 6

Noosa Quays CTS 5468 - Minutes of AGM 31 May 2010

ALTERATIONS TO LOT 12 - Ordinary Resolution

That the Body Corporate consent to Quamby Resort Management Pty Ltd ACN 125 811 029
as Trustee for the Quamby Resort Management Trust:-

(a)

(b)

(c)

(d)

Erecting on Lot 12, being the on-site Manager's Lot, :-

{i) a roof over the courtyard area as approximately shown on the attached plans
(also being the area comprised in Exclusive Use Area 12A as shown on the
Plan of Exclusive Use circulated with this motion); and

(ii) a scullery adjacent to the kitchen as approximately shown on the attached
plans (also being the area comprised in Exclusive Use Area 12B as shown on
the Plan of Exclusive Use circulated with this motion); and

Carrying out the other alterations described on the attached plans,

With such work to be carried out using new materials which shall be in keeping with
the style, colour-scheme and general amenity of the scheme, and otherwise in a
tradesman like manner (“the works”), it being acknowledged and consented to by the
Body Corporate that:-

Marianna Langdon Bakosova (and her husband Mark Langdon) will be the Controlling
Person required to occupy Lot 12 pursuant to the Caretaking and Letting Agreements
identified in motion 1 pending the commencement of the Works; and

Lot 12 may be temporarily vacated while the Works are carried out; ,

on the proviso that David Andrew Langdon and Karen Elaine Cook Langdon:-

(e) Will use their best endeavours to cause the Works to be completed as soon as
reasonably practicable; and

(f) Wilt upon the completion of the Works be the Controlling Person required to occupy
Lot 12 pursuant to the Caretaking and Letting Agreements identified in Motion 1.

MOTION CARRIED. Yes - 22 No-0O Abstain - 0

GENERAL BUSINESS:

Proposed Upgrading to the TV Reception and Communications System

Dr Waite queried the process the committee had taken in regards to it’s decision to engage a
Consultant rather than a Technical Contractor to consider the proposal to upgrade the
telecommunications systems.

The Chairman advised the meeting that due to the age and complexity of the building structure it was
resolved that a consultant be engaged to survey the existing telecommunication and cabling
_ infrastructure and further to provide options to future proof any upgrades undertaken. The committee
were of the opinion that in view of the costs and complex nature of the work it should be appropriately
project managed to ensure the best outcome for the body corporate.

Used in these records

About this file

File size
2.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

14896 TC - Change to development approval [As Published].pdf · 2.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.