Council archive · source document
14896 TC - Change to development approval [As Published] · 51985.3785.04
q
GENERAL NOTES EXCAVATIONS WATER SUPPLY | WATER PROOFING WET i
Water Supply: Connect to council mains in ARE AS .
Toilet doors are to open outwards or be fitted with All boundary works, including temp. works not to accordance with development approval and local .
lift off hinges in accordance with part 3.8.3.3 of encroach over property boundary. authority requirements { perdine a we areas iw coy
BCA Housing Provisions. . A certificate including ,
Builder to make allowance to prop, shore and lf mains water pressure exceeds ortcould exceed WC and laundry fram an approved waterproofing
All glazing in buildings to comply with the retain the sides of all excavations required for © 500kPa, a water pressure limiting device shall be applicator will be required before a final certificate
requirements of part 3.6 of BCA Housing Provision building construction. The builder shall satisfy installed to ensure that the maximum operating can be issued.
and AS1288/2006. A glazing certificate from the himself as to the extent of retention required prior pressure at any outlet within the boundaries of the
manufacturer for compliance with AS1288 must be to excavation and employ such retention methods _ property does not exceed 500 kPa. TANKING OF HABITABLE |
provided on completion. deemed necessary. Any slippage or damage \
caused as a result of excavation shall be made TERMITE PROTECTION AREAS AND
Where existing crossover is modified the builder good by builder. Adequate retention methods are . FIN G q
shall construct Kerb & Channel to match adjacent the full responsibility of the builder. WATERPROO
and to local authority requirements, TERMITE PROTECTION ‘
Any required sheet piling is to be designed and The building shall be protected from subterranean DECKS ROOFS
All Balustrading to Decks shall be engineer certified certified by RPEQ so as to support likely imposed termites by approved physical and/ or chemical , .
by installer / fabricator and to comply with BCA —_ loads and not cause or allow damage to adjacent barriers in accordance with AS38004 All steps in floors where retaining walls have been
3.9.2 building works or land. installed or where retaining walls are used as
The precise method of protection shall be extemal walls of habitable sanking are to be }
Builder to allow for disposal from site all waste determined by the owner! s and/ or builder only waterproofed by an approved tanking system an
materials during demolition and construction WORKPLACE HEALTH after consultation with a licensed: pest control installed by an accredited installer.
period. operator.
AND SAFETY The precise method of protection shall be :
Smoke alarms must comply with AS 3786 and be sa a This information then shall be advised to the Local determined by the owner! s and/ or builder only i
connected to the consumer mains power. Smoke The building has been designed in accordance == Goverment or Licensed Certiier prior to, or at the after consultation with a licensed waterproofing
alarms must be located in accordance with part with the Building Code of Australia so that time of lodgement of the Building Permit applicator.
3.7.2.3 of the building code of Australia. corventonal eung marials , and tw na Application.
. . methods can be employed during Its constructon. This information then shall be advised to and
puider say ae to make good * areas adjacent A Suitably qualified builder working within the Thereafter, the owners shall ensure that any approved by the Local Government or Licensed
fo demolished elements as required. requraments of me workplace heat and safely physical barriers are kept clear of garden beds Certifier prior to carrying out the works.
acts ‘in cons fe ¢ rk it 9 for thos ° n and/ or soil build up, that any chemical barriers . . \
SEWERAGE involved-in the constuction of the structive, The remain undisturbed and that annual inspections ‘The approved system is to be certified for
builder n ‘be re ¢ nsible 0 stucure. the (plus eradication as necessary ) are carried out compliance upon completion.
, . . ulcer e Fesponsibie to ensure ine thoughout the fife of the building by a licensed pest
Connection of house drains to sewer main to be Construction program is carried out from beginning control operator in accordance with AS3660.1
carried out in accordance with local authority to end whilst complying with the requirements of _
requirements the Workplace Health and Safety Act. On the completion of the building prior to the final
BUILDING WORKS inspection by the licensed Building Certifier, a
SURFACE WATER licensed Pest Controller is to inspect and confirm
SETOUT that the termite system installed has not been
DRAI NAGE bridged or breached and the required visual barrier
Building Works tobe setoutbyLioensed Surveyor, The, Sound Dental suspense ng has been maintained. |
Identification and height verifcation survey to be above the adjacent extemal finished ground level All timber framing shall be ‘Hine T2 Blue’ or similar
carried out once fascia/gutter and ridge to roof has : : d in strict accordance with manufacturers’
been erected to confirm no works encroach and surface water is prevented from ponding under . ite In sic d ior a a
allowed set backs, other than those for which Pe bullding. Refer figure 3.1.2.3 of BCA Housing waillen recommendations. |
relaxation / dispensation has been granted, and the rovisions. APPROVALS '
building has been constructed in accordance with . . }
approved plans and height does not exceed the Nes sng must be ge So tsa dope not Ieee tan
Hanne . 4
pent limit as per the local planning scheme and 50mm over the first 1.0m from the building in rise himself / herself with
. accordance with Figure 3.1.2.2 of BCA Housing c 9 approval and ensure
STORMW ATER Provisions. allowance is made to comply with, all conditions ;
relevant to the construction component of the c 1
Roof & surface stormwater to be disposed of in The finished ground level is to be a minimum of works. ' PROPOSED A LIE RATIONS AND ADDITION S
accordance with local authority requirements 450mm below ground floor level. TO MA N: AGERS APARTM ENT
i
\ NOOSA QUAYS RESORT - QUAMBY PLACE
V
MOJO DESIGN i in carunotin vit Engi i conenudon | DESIGNER . Project t Cfent Sedo {Date Orawn By
1-98 Sunshino Beach Road comp uhd oa Suvire uns ScAontabaitgAs SEBSEy | noDedgn BSAUnes No. 16582 ALTERATIONS TO MANAGERS APARTMENT QUAMBY RESORT MANAGEMENT.TRUST.P/L___as. shown, JAN.2010 IAG AE
Fess eens ___ Sear untae nntesccieca | seems J i — po a
= BUILDING DESIGN « LOW RISE Locaion ‘Drawing -_ -
Po7sae7 5304 | Beemicmemantemay stead ae ~—\\-- NOOSA QUAYS--QUAMBY-PALCE—""NOOSA SOUND “COVER SHEET WD.101
fe)
MOQJODESIGN
f
‘40014
I
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
14896 TC - Change to development approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.