Skip to the record
For the highest quality transcripts.

Council archive · source document

Town Planning Assessment Report · 132001.210239.2

of 21

Text shows just the words. Original shows the document exactly as it was published.

Figure 5 – Erosion Prone Area Mapping


An assessment against the applicable benchmarks contained within the SPP are provided below:

 Applicable Benchmark                                 Comment
 Bushfire, flood, landslide, storm tide inundation, and erosion prone areas outside the coastal
 management district:
 (3)    Development other than that assessed            Complies.
        against (1) above, avoids natural hazard
        areas, or where it is not possible to avoid the The entire site is located within a mapped erosion
        natural hazard area, development mitigates prone area and it is not possible to avoid the hazard
        the risks to people and property to an          area.
        acceptable or tolerable level.
                                                      The proposal involves additions and alterations to
                                                      an existing dwelling which are contained within the
                                                      curtilage of the existing dwelling. The proposed
                                                      building works do not result in any additional
                                                      groundwork taking place within the erosion prone
                                                      area and will not introduce any new risks to people
                                                      and property from potential beach erosion.
 All natural hazard areas:
 (4) Development supports and does not hinder         Complies.
 disaster management response or recovery
 capacity and capabilities.                           The proposed building works additions and
                                                      alterations to an existing dwelling and will not
                                                      hinder disaster management. response or
                                                      recovery capacity and capabilities.


                                                                                                  Page 9 of 21

Used in these records

About this file

File size
5.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Town Planning Assessment Report.pdf · 5.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.