Skip to the record
Accept no imitations.

Original source · versioned page text

2015-04-28 Infrastructure & Services Committee Agenda

of 100

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                                                                               28 APRIL 2015



SECTION               RECENT ACHIEVEMENTS                               CURRENT PRIORITIES                             LOOKING AHEAD
Asset Planning           Further     implementation      of   the        Asset management plan development            Further development of work order
                           Technology One (T1) mobility system.            Further implementation of the mobility         management system to improve asset
                         Development of the capital works                  across other asset classes                     management outcomes
                           database within the T1 system.                  Development of reporting capabilities        The development of a stormwater asset
                         Finalisation of the capital works budget          within the T1 asset system                     renewal program
                           development for 2015/16                         Development of 5 and 10 year capital
                         Tender awarded for the asset condition            programs
                           assessment of the sealed road network           Development of a 5 year reseal and
                                                                             rehabilitation program for sealed road
                                                                             network.

Infrastructure           Tenders awarded for 15 bus stop                 Ongoing delivery of designs for the          Designing and planning for        the
Planning & Design          designs for Capital Works program.                Capital Works Program.                         2015/2016 Capital Works Program
                         Munna       Point     Bridge    tender          Noosa Waters lock cards audit                Transport Strategy
                           documentation completed                         Design Principles project nearing            Electric bus live trial
                         Easter free holiday buses                         completion
                                                                           Traffic Study
                                                                           Electric Bus trial preparations

Civil Operations         Parks service review completed                  Delivery of Resurfacing &                    Development of Noosa Tree Policy
                         Tree Policy adopted by Council                    Gravel Road Re-sheeting Programmes             guidelines
                         Testing of potential rehabilitation             Finalising a Fire Management Plan for        Appointment of Parks and Natural
                           candidates for Road Reseal &                      Noosa Shire.                                   Areas Co-ordinator
                           Rehabilitation Programme completed.             2015/16 budget development


Building & Plumbing      Met legislative time frames for Plumbing        Second round of Building          final      Development of more detailed trading
Services                   approvals.                                        approvals commenced                            activity reports for Council
                         Met response timeframe for plumbing
                           information       request.    (legislative
                           requirement 10 days)
                         Met response timeframe Referral
                           Agency         Building.      (legislative
                           requirement 10 days)
                         Electrician appointed



                                                                                                                                                  Page 5 of 100
Log in to download the original file

2015-04-28 Infrastructure & Services Committee Agenda(PDF, 10MB).pdf · 10.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.