Council archive · source document
Geo-environmental Investigation · MCU25/0020
Very large file (12.4 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Executive Summary This report presents the findings of a geotechnical and acid sulfate soils (ASS) investigation for a proposed residential development at 11 Ravenwood Drive, Noosa Heads. The investigation, conducted by Tectonic for Sunshine Beach Noosa Developments Pty Ltd, involved drilling boreholes at two locations, in situ soil strength testing, and laboratory testing for ASS. This report outlines the investigation results and provides recommendations on earthworks, footings, retention systems, groundwater management, and the extent and severity of ASS. The proposed development consists of a two-storey house over a single level basement and includes an arc-shaped pool in the north-eastern corner, near the existing canal revetment wall. Excavations for the basement will range between 3 m and 4 m deep, with deeper excavations for a car lift pit. Contiguous piles are planned around the perimeter of the basement. Subsurface conditions were found to consist of loose to medium dense, silty sand fill, containing gravel and deleterious materials (e.g. cobbles, building debris etc.) to depths of 2.3 m to 3 m below ground level (BGL). Below this, mostly medium dense to very dense sands were present, overlying stiff clays at depth. A firm sandy/silty clay layer was encountered between 4.8 m and 5.5 m BGL in both boreholes, with some loose sands above. Groundwater seepage was encountered at depths of 1.8 m to 2 m BGL, with a standing groundwater level of 1.8 m BGL recorded at the completion of the investigation. Groundwater levels are expected to fluctuate with weather and tidal variations. After excavation to the design basement level, the subgrade is expected to comprise loose to medium dense sand, possible with some firm clays in deeper excavation areas. A geotechnical RPEQ must inspect the foundation subgrade to determine whether any over-excavation is required to form a stable working platform and foundation for the building. An internal dewatering system, such as sand spears or wells, will be required to manage seepage and prevent ‘boiling’ of the subgrade. It should be possible to manage the groundwater extraction system such that the impact on the surrounding, external groundwater table is negligible. The design of basement walls (temporary and permanent) and floor must account for hydrostatic pressures. Settlement analysis has been carried out using Settle 3D and considered a flexible footing system founded on loose to medium dense sand at around RL – 1.4 m AHD. Our analysis indicates that elastic and consolidation settlements would be in the order of 30 mm to 45 mm. It is anticipated that a well stiffened raft slab footing system could be designed to support the proposed building provided that the estimated total and differential settlements can be accommodated. Should the anticipated settlements preclude the use of a high-level raft footing solution, a piled footing system would be required. Considering the likely order of column loads to be supported, steel screw piles (or similar) would need to be socketed into the dense to very dense sands at about 8 m BGL (existing ground level). Laboratory test results indicate that the soils above 4 m BGL have minimal acid generating capacity given that the recorded Acid Neutralising Capacity exceeded the net acidity, presumably due to previous lime treatment. As such, these soils do not require specific ASS management and n ASS management plan is not required. Should significant excavations (i.e. >50 m3) extend below 4 m BGL, Tectonic should be notified to assess the implications associated with ASS. Groundwater extracted would be expected to require quality adjustment prior to off-site release to stormwater. Effective treatment of groundwater to achieve suitable release criteria requires reasonable spatial and temporal consideration. An experienced dewatering sub-contractor should be consulted to ensure appropriate outcomes can be achieved. Geo-environmental Investigation Proposed Residence 11 March 2025 | 25040-001-Rev0 ii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Geo-environmental Investigation.pdfRelated documentApplication case desk ↗
About this file
- File size
- 12.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.