Tidal works and coastal man gementLdistricts
IDAS form 23 Nambour
(SustainablePlanningAct 2009 version 1.0 effective 18 December 2009)
This form must be completed for development applications for operational work that is tidal works (otherthan prescribed
tidal works) or work in a coastal management district.
You MUST complete All questions unless the form indicates otherwise. Incomplete forms or forms without all necessary
information and documentation will result in your application not being a properly made application.
For all development applications you must:
. complete Application details-IDAS form t
. complete any other forms relevant to your application
. provide any mandatory supporting information identified on the forms as being required to accompany your
appli~ation.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable PlanningAct 2009or the Sustainable Planning
Regulation 2009.
This form can also be completed online using Smart eDA at www.smarteda.qld.gov.au
1. What is the nature of the work proposed by this application? (tick applicable box/es)
tidal work (e.g.artificial waterways to be connected to tidal water, basins, breakwaters, bridges, boat ramps, decks
~ and boardwalks, docks, dockyards, embankments, groynes, jetties, marinas, pipelines, pontoons, powerlines,
seawalls, slips, small craft facilities, training walls, wharves etc.)
o interfering with quarry material as defined under the Coastal Protection and ManagementAct 1995on State coastal
land above high-water mark
D disposing of dredge spoil or other solid waste material in tidal water
D draining or allowing drainage or flow of water or other matter across State coastal land above high water mark
D constructing or installing works in a watercourse that are not assessable under the Sustainable PlanningRegulation 2009,
schedule 3, part 1, table 4,item 3or 4
D reclaiming land under tidal water
D constructing an artificial waterway associated with reconfiguring a lot
an artificial waterway not associated with reconfiguring a lot on land, other than State coastal land,
o constructing
above high-water mark if the maximum surface area of water on the waterway is at least sooom2;
D constructing a bank or bund wall to establish a ponded pasture on land, other than State coastal land above high
water mark
D removing or interfering with coastal dunes on land, other than State coastal land, that is in an erosion prone area as
defined in the Coastal Protection and ManagementAct 1995and above high water mark
_ ... . ~ _
’L ~_ _. _..__ _ ... _._ ....-..c ~_ _0.___ ._._._ . .~. _ _ . _ __ _ _ __ _____...___ __......._____
_
"
~
Departmentof Infrastructure and
" \ .
I
Planni~_g,
" .
.
.’
,’,’,
.
.<
."Qplan,
~
"
,
’
:
’"
.
.
:\~~’-~~~;~n5~~1’~;"!l
~.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application forms 1, 23 & 28, Covering LetterRelated documentApplication case desk ↗
About this file
- File size
- 10.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.