3. The jetty should have a minimum level-walking surface that is level with the top of the
revetment wall.
0. A rigid handrail shall be fitted on one side of the walkway.
0. No posts or vertical supports of the proposed jetty are to extend vertically from the structure
unless they provide support for the handrail.
0. No boatlifting devices are to be attached or moored at the jetty structure for the purpose of
elevating a vessel above the water without Council approval.
0. There shall be no electrical reticulation system carrying electricity in excess of 24 volts beyond
the revetment wall.
0. Lighting associated with the use shall be designed, installed, operated, and maintained in
accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
0. The jetty is to be used for private purposes only with no commercial operations to be
undertaken.
0. Rock scour protection, wrapped in geotextile, extends 3000 mm from the face of the revetment
wall in this locality. Prior to driving piles, the rocks are to be removed to expose the geotextile
and the geotextile cut neatly to allow it to be turned back. During pile driving, care is to be
taken to ensure the geotextile is not damaged. At the completion of pile driving, the fabric is to
be turned down around the pile and the rocks replaced around the piles.
0. Boat repair activities will not be permitted on site.
0. Wastewater and sullage shall only be disposed of at approved pumpout facilities.
0. The mooring facility shall not be utilised for live-aboard purposes.
0. Any construction and post construction activity is not to impact on the condition of the
waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA
(1994) and the Environmental Protection (Water) Policy 1997.
0. The approval or conditions do not constitute a ruling on structural safety and the applicant
must make their own arrangement to ensure adequacy of design and work. Any approval
granted does not warrant that such plans and specifications have been checked in detail, nor
does it absolve the owner of the land from complying with all the conditions of this approval
and/or relevant Council By-Laws and Policies and/or relevant statues and/or statutory
regulations in the execution and/or performance of said works. The Council does not accept
any responsibility for the accuracy of such plans and specifications as approved.
0. Certification by a Registered Professional Engineer of Queensland that states that the jetty is
constructed in accordance with best practice methods and is structurally sound shall be
submitted to Council prior to the return of any bond monies held by Council. A final inspection
and approval of the structure by Council’s Inspector is also required prior to the return of any
bond monies held by Council. Please contact Council’s Planning Assessment Section to
arrange the inspection.
0. The Development Permit for Operational Works (Prescribed Tidal Works – Jetty) lapses if the
works have not been completed by 7 December 2011, unless an application to extend the
relevant period is approved by Council.
0. The jetty shall be licensed with the Council upon completion of the structural work and shall be
licensed annually thereafter.
Page 2 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2009.00001583.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 55 KB (small file)
- File type
No other editions are linked here.