Original source · versioned page text
Annexure A - Proposal Plans
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn 13.41
12.75
13.00
13.4
0 12.50 Block Retaining
Wall Sewer MH
Bitumen
13.25 13.00 12.75 Not Located
31.463 Timber Fence
Edge
12.34 11.22
13.33
87°28'
11.2
13.0 13.41 12.22
6 Approximate House Connection Plotted
2
10.89 From Statutory Records
Sewer MH
13.08
10.96 Approx. Invert Level 9.31 m
11.0
7
13.06
.8
Approx. 1.29 deep
0 Not Located
10
13.32
11.0
7
.2
13
6
13
13.23
.25
0
store 10.
88
13
13.21
.33
existing residence
.27
13
10.81
13.23
13.28 13.21
13.22
13.25
1
.9
garage
10
355°0'
19.606
12.98
12.9
10
FL11.01
.77
6
4
.1
177°28'
11
25.369
12.79
7
7
.5
13.03
remove existing
6
11
.0
tree
12
13.01
9
.8
10
10.92
13
.00 9
6
.2
12.72
12
down down
1000mm 100mm
existing tree
5
existing tree
.4
6,800
12
to be removed to be removed
9
12.
FL11.3
.9
10
7
11.14
concrete slab
.8
60
new carport new
11
12.93
FL11.2
driveway
10.97
6,000 FL12.30
11.00
5
.1
12.81
11
Power Pole 12
.4
8
#66839
1,500
3.16
1
340°
.2
12.
12
12
2
84
block base
.7
.7
4
11
5
20'
12
10.96
.22
new work
4
12.
Ve Den
.0
78
11
5,100
3. ge se
4,500
11
16 ta .98
31 4 tio
1° n 11.65 11.22
10.96
0'
3.164 11
12
.07
267°
.63
281°
11.0
12.5 40' 10.82
2
12.50 12.3 24.323
5
0
0
.5
10
11.84 11.43 10.67 10.38
11.08
Power Pole
10.75
12
.34 #66838 Edge
.00
12 Bitumen
25
12.
.50
11.59
25
11.13
10.49 10.19
0 5 10
5
11.
TBM Nail in Bitumen
site plan/
11
.7
11.97
11
Assumed RL / m 10.547
sub floor plan
no. date amendments
Client Location Drawing Drawn Scale
J & H COONEY SITE PLAN/ AM 1:100@A2
3 AVOCET PARADE SUB FLOOR PLAN 1:200@A4
Project PEREGIAN BEACH Drawing no. Date
62 hilton terrace
noosaville (07) 5449 9066
[email protected]
QBSA reg. 65073
PROPOSED DUPLEX
DEVELOPMENT
16.1219-1 DEC 2019 1
[OCR of page images]
See
no.
date
3 ao
3 , |
- 13.49 2 3 12.50 Block Retawing Sewer MH vk
Not Located |
oy 2 _ 13.25 13.09 12.75 wos «3 1.463 Timber Fence 11.20 Pan pa
Bs | — \ are a
LL = pany 12.22 10.89 SB Approximate House Connection Plotted ‘ol oo
ca Tote Tt) ese : ° gor Stato Recorcs Sewer MH
t \ || | | | | Wy 11.09 * oes Not Located
PELE EL 7
2 EE |
° ‘ = O
ewe eo aac
“WS . r store, °
8 o/ & | “ti ‘d |
2 F existing resiaence «
13.23 | Sg
13.28 13.94 \ Lorre TTL ILL I LEI LLILY
y |
wo —
Ol © > 2.
aL ok & e,
é| 3
. 12.79 8 %
3 3 2 Oy R
a RSS lof N
"| N - sy
7 TC
200 9
‘ La
0 . Boo Noe een roogremee -, oxisting free g
te a ae we RY ca a we a a Ne a a a Qa ol
£9 OO | Ba at aaa al ne ar n :
9 | feose FL11.2 P dnbewa
vee wos a, OF y
. 6\0
3 ower Pole Ze L- 3 it
#66839 3S
e 1!
Z. 3 4 _
2 B 6 Q —_—*
S D fo — — Y\— — — — & —|- ~— K—- K—- K—- Kher J os ee |_|
12.25
3 “65s, R g
76, 8 X 3 is
& % 165 11.22 e
87° 9" a ° =
12.50 & Lace 2
Power P i. an g
"23 #66836 9 Edge .
. 58888 S ;
29 <o NY 11.59 9 wo
10 A2- > , ~~ Vv 1119 10.49 10.19
1197 Ss ne ~ TBM Nail in Bitumen it | /
‘ Assumed RL / m 10.547 Sl e Dp an
amendments
=e = Client Location Drawing Drawn Scale
a design J & H COONEY SITE PLAN/ am | 1:100@a2
3 AVOCET PARADE SUB FLOOR PLAN .1:200@A4
an d rew mckellar design Project PEREGIAN BEACH Drawing no. Date
Roosavile (07) 5449 9066 GBSA reg. 65078 PROPOSED DUPLEX 16.1219-1 DEC 2019 1
[email protected] DEVELOPMENT
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 4 pages
Page 2
13.41
1,900 9,890
4,380
13.4
12.50 Block Retaining
12.75
13.00
0
Wall Sewer MH
Bitumen
13.25 13.00 12.75 Not Located
31.463 Timber Fence
Edge
12.34 11.22
13.33
87°28'
11.2
13.0 12.22
2,085
6 13.41 Approximate House Connection Plotted
2
10.89 From Statutory Records
Sewer MH
13.08
10.96 Approx. Invert Level 9.31 m
11.0
7
13.06
.8
Approx. 1.29 deep
0 Not Located
10
13.32
11.0
wc
7
.2
13
6
13
13.23
ba
.25
0
bed bed 10.
88
13
13.21
.33
.27
13
10.81
13.23
13.28 13.21
existing residence
13.22
terr.
13.25
1
terr.
.9
10
family
355°0'
19.606
77sqm
12.98
12.9
10
FL13.27
.77
6
4
.1
177°28'
11
25.369
12.79
7
garden clothes drying
.5
13.03
10.92
6
11
.0
4,250
12
13.01
9
.8
D.P
line of floor over
10
avocet parade
13
D
.P
9 10
.00 9 sh ba
12.72
bath ldry visitor
study
6
.2
3.0 x 3.14
11
1
v lin
6,800
SITE DATA: Current Noosa Plan.
entry
9
12.
.9
Semi-Attached Housing Zone
FL12.3 FL11.3
10
11.14
60
new carport new
12.93
Site Area: 779sqm
D.P
FL11.2
r r driveway Proposal: Duplex Development' Multple Housing Type 2
Application would be 'Code' Assessable;
10.97
6,000 store
11.00
5
Site Cover: 40% ; 311.6 sqm allowed (building footprint)
.1
1.7 x 2.3
12.81
11
Existing dwelling; 102sqm. New Unit: 147sqm
Power Pole 12
.4
8
bed 2 bed 3 Total site cover 249sqm
.P
#66839
D
3.75 x 3.2 3.75 x 3.2 Plot Ratio 0.45 :1 ; 350.55sqm allowed
line of floor over Existing Dwelling; 154sqm
path
3.16
New Unit: 195sqm
340°
12.
garden Total GFA: 349sqm
12
turf
84
D.P
.7
line of floor over Landscaping: 35% site area (60% of which is soft) : 360sqm req'd- 216sqm soft.
4
5
20'
12 377sqm total- 294sqm soft landscaping provided
10.96
.22 path
Parking: Minimum 1 covered space per unit plus
6,600
4
12. 1 visitor space per 4 units (2)
.0
78
1,695 7,820 1,780 6,400 6,000 800
11
5,228
3.
new work
4,500
11
16 .98
31 4 ground floor: 80sqm
1° 11.65 11.22 carport/store: 47.7sqm
10.96
0' entry deck: 2.0sqm
3.164 11
12
.07
sliding gate
267°
.63
LOT 320 281°
11.0
12.5 40' gate 10.82
rp 93113 12.50 2
12.3
5
24.323
0
0
.5
Noosa Shire Council
10
11.84 11.43 10.67 10.38
11.08
Power Pole
10.75
12 new crossover
.34 #66838 Edge
.00 to NSC detail
12 Bitumen
25
12.
.50
11.59
25
11.13
10.49 10.19
0 5 10
5
site plan/
11
11.
TBM Nail in Bitumen
.7
11.97
11
Assumed RL / m 10.547
avocet parade
note: landscaping, property fencing and
gates to landscape designer's detail;
JAMES ROSS LANDSCAPE DESIGN; DA01
ground floor plan
no. date amendments
Client Location Drawing Drawn Scale
J & H COONEY SITE PLAN/ AM 1:100@A2
3 AVOCET PARADE GROUND FLOOR PLAN 1:200@A4
Project PEREGIAN BEACH Drawing no. Date
62 hilton terrace
noosaville (07) 5449 9066
[email protected]
QBSA reg. 65073
PROPOSED DUPLEX
DEVELOPMENT
16.1219-2 DEC 2019 2
Page 3
9,890 1,900
4,380 1,900
31.463
87°28'
2,085
wc
ba
bed bed
7,790
existing residence balc.
balc. dining living
kit
355°0'
19.606
77sqm FL15.93
177°28'
25.369
4,261
D.P
D.P
avocet parade
10
pdr kit dining
v pa 5.1 x 3.9
5,010
s
17
8,000
6,855 FL15.25
gallery balcony
D.P
lin alcove
wr
living
6,000 5.1 x 3.9
4,490
master
D.P
sh en bed
1,500
3.16
4.5 x 3.8
340°
v
4
20'
D.P
3.
new work
16
31 4 1,095 7,820 5,180 3,000 6,800 first floor: 115.0sqm
4,500
1° balcony: 24.0sqm
0'
3.164
267°
281°
40'
198
24.323
0 5 10
site plan/
avocet parade first floor plan
no. date amendments
Client Location Drawing Drawn Scale
J & H COONEY SITE PLAN/ AM 1:100@A2
3 AVOCET PARADE FIRST FLOOR PLAN 1:200@A4
Project PEREGIAN BEACH Drawing no. Date
62 hilton terrace
noosaville (07) 5449 9066
[email protected]
QBSA reg. 65073
PROPOSED DUPLEX
DEVELOPMENT
16.1219-3 DEC 2019 3
Page 4
31.463
87°28'
existing residence
2.8° roof
355°0'
19.606
177°28'
25.369
avocet parade
height:7.9m
fascia line
RL19.90
7.5° roof
3.16
340°
4
20'
3.
16
31 4
1°
0'
3.164
267°
281°
40'
24.323
0 5 10
site plan/
avocet parade roof plan
no. date amendments
Client Location Drawing Drawn Scale
J & H COONEY SITE PLAN/ AM 1:100@A2
3 AVOCET PARADE ROOF PLAN 1:200@A4
Project PEREGIAN BEACH Drawing no. Date
62 hilton terrace
noosaville (07) 5449 9066
[email protected]
QBSA reg. 65073
PROPOSED DUPLEX
DEVELOPMENT
16.1219-4 DEC 2019 4
Page 5
colourbond custom orb roofing
colourbond quad gutter & fascia
existing concrete block building
Hardies 150mm Linea boards
paint finish
alum balustrading
2,700
FL15.25 galv shs posts
2,950
FL12.30
natural ground
FL11.20 line existing building new work
1,100
Hardies EasyLap cladding.
paint finish
south elevation west elevation
colourbond custom orb roofing
colourbond bargeboard
8.0m height line colourbond quad gutter & fascia
alum framed windows & doors
Hardies 150mm Linea boards
paint finish
2,700
alum balustrading
FL15.25
2,700 250
galv shs posts
galv shs posts
FL12.30
nd line
natural grou
FL11.20
1,100
Hardies EasyLap cladding.
paint finish
new work existing building
north elevation east elevation
no. date amendments
Client Location Drawing Drawn Scale
J & H COONEY ELEVATIONS AM 1:100@A2
3 AVOCET PARADE 1:200@A4
Project PEREGIAN BEACH Drawing no. Date
62 hilton terrace
noosaville (07) 5449 9066
[email protected]
QBSA reg. 65073
PROPOSED DUPLEX
DEVELOPMENT
16.1219-5 DEC 2019 5