Annexure A - Proposal Plans
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn colourbond custom orb roofing
colourbond quad gutter & fascia
existing concrete block building
Hardies 150mm Linea boards
paint finish
alum balustrading
2,700
FL15.25 galv shs posts
2,950
FL12.30
natural ground
FL11.20 line existing building new work
1,100
Hardies EasyLap cladding.
paint finish
south elevation west elevation
colourbond custom orb roofing
colourbond bargeboard
8.0m height line colourbond quad gutter & fascia
alum framed windows & doors
Hardies 150mm Linea boards
paint finish
2,700
alum balustrading
FL15.25
2,700 250
galv shs posts
galv shs posts
FL12.30
nd line
natural grou
FL11.20
1,100
Hardies EasyLap cladding.
paint finish
new work existing building
north elevation east elevation
no. date amendments
Client Location Drawing Drawn Scale
J & H COONEY ELEVATIONS AM 1:100@A2
3 AVOCET PARADE 1:200@A4
Project PEREGIAN BEACH Drawing no. Date
62 hilton terrace
noosaville (07) 5449 9066
[email protected]
QBSA reg. 65073
PROPOSED DUPLEX
DEVELOPMENT
16.1219-5 DEC 2019 5