Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

17 BOTTLEBRUSH AVENUE, NOOSA HEADS, QLD, 4567, Australia · MCU26/0001

of 16

Text shows just the words. Original shows the document exactly as it was published.

 SEDIMENT RELEASE GUIDELINES

 1.    ALL RELEASES OF STORMWATER CAPTURED ONSITE, UNLESS OTHERWISE NOTED IN THIS                                                                                                                                                                                                                                                                                                                        WRAP FILTER
                                                                                                                                                         1 METER MAX.                      STAR PICKETS
       STANDARD, MUST NOT EXCEED THE FOLLOWING LIMITS:                                                                                                                                                                                                                                                                                                                                                   CLOTH OVER GRATE
 ·     50mg/L OF TOTAL SUSPENDED SOLIDS (TSS) AS A MAXIMUM CONCENTRATION;                                                                                                                DROP INLET
 ·     TURBIDITY (NTU) VALUE LESS THAN 10% ABOVE BACKGROUND;                                                                                                                             WITH GRATE
 ·     pH VALUE MUST BE IN THE RANGE 6.5 TO 8.5 EXCEPT WHERE, AND TO THE EXTENT THAT, THE
       NATURAL RECEIVING WATERS LIE OUTSIDE THIS RANGE.                                                                                                                                  WIRE OR STEEL MESH
 2.    THE CONCENTRATION OF TSS RELEASED BY DEWATERING MAY ONLY EXCEED 50mg/L WHERE IT                                                                                                   (14 GAUGE x 150mm
       CAN BE DEMONSTRATED AND SUPPORTED THROUGH DOCUMENTATION THAT:                                                                                                                     OPENINGS) WHERE
 ·     FURTHER SIGNIFICANT RAINFALL IS FORECAST TO OCCUR BEFORE THE TSS CONCENTRATION IS                                                                                                 GEOTEXTILE IS NOT
                                                                                                                                                                                         SELF-SUPPORTING
       LIKELY TO BE REDUCED TO 50mg/L;
 ·     RELEASING A HIGHER CONCENTRATION OF TOTAL SUSPENDED SOLIDS WILL RESULT IN A                                                                                                         WOVEN GEOTEXTILE
       BETTER ENVIRONMENTAL OUTCOME BY PROVIDING STORAGE FOR THE CAPTURE AND
       TREATMENT OF RUN-OFF FROM THE IMMINENT RAINFALL AND RUN-OFF.
 ·     ALL REASONABLE AND PRACTICABLE STEPS HAVE BEEN TAKEN TO TREAT THE WATER WITHIN




                                                                                                                                                                                                                                                                                                                                                                                                                                                                    500 - 600mm
       BEST-PRACTICE TIME FRAMES;
 ·     FLOCCULENT HAS BEEN APPROPRIATELY APPLIED AND THE CONCENTRATION OF TSS IN THE                                                                                                 STAR PICKET
                                                                                                                                                                                     FITTED WITH                                                                                                                                                                     WRAP FILTER CLOTH
       CAPTURED WATER HAS ALREADY SIGNIFICANTLY DECREASED.                                                                                                                                                                                                                                                                                     RUNOFF                OVER GRATE
 3.    FOR ALL OTHER STORMWATER RELEASES, FLOWS AND DISCHARGES FROM THE SITE, THE                                                                                                    SAFETY CAP
                                                                                                                                                                                                                                                                                                                                               WATER WITH                                                                                                                                                      1.5m STAR PICKETS AT MAX.
       RELEASE LIMIT PRESCRIBED IN (1A) ABOVE MUST NOT BE EXCEEDED UNLESS THE                                                                                                                                                                                                                                                                  SEDIMENT                                                                                                                                                        2.5m CENTRES
       DEVELOPMENT IS IN FULL COMPLIANCE WITH THIS STANDARD.
                                                                                                                                   SANDBAGS                                 WOVEN GEOTEXTILE
 SEDIMENT CONTROL
 1. ALL SEDIMENT AND EROSION CONTROL MEASURES TO BE IN ACCORDANCE WITH INTERNATIONAL                                                                                                   RUNOFF                                                                                                                                                                                                                                                                                                                  SELF-SUPPORTING




                                                                                                                                                         FLOW
    EROSION CONTROL ASSOCIATION (IECA) AUSTRALIA GUIDELINES AND THE SPECIFICATIONS.                                                                                                    WATER WITH                                                                                                                                                                                     FILTERED                                                                                                                 GEOTEXTILE
 2. SEDIMENT AND EROSION CONTROL DETAILS SHOWN ARE MINIMUM REQUIREMENTS. IT IS THE                                                                                                     SEDIMENT                                                                                                                                                                                        WATER
                                                                                                                                   WATERWAY                                                                                                                                                                                                                                                                                                                                                                              FLOW
    CONTRACTORS RESPONSIBILITY TO INSTALL ADDITIONAL CONTROL MEASURES AS DEEMED                                                                                                                                                                                                                                                                                                                                                                                                                          DIRECTION OF
    NECESSARY THROUGHOUT CONSTRUCTION.
 3. THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL SEDIMENT CONTROL DEVICES IN A                                                                                                                                                                                                                                                                     GEOTEXTILE INLET FILTER TYPE B
    FUNCTIONAL ORDER AND REPLACE ALL BLOCKED SEDIMENT DEVICES AS REQUIRED UNTIL                                                    EXCAVATION                                                                                                                                                                                                                         SCALE N.T.S
    SUCCESSFUL OFF MAINTENANCE OF WORKS.                                                                                                                                                                                                FILTERED                                                                                                                                                                                                                                                               ON SOIL, 150mm x 100mm
 4. CONSTRUCTION OF ALL SEDIMENT MANAGEMENT DEVICES TO THE SATISFACTION OF THE                                                                                                                                                           WATER                                                                                                                                                                                                                                                                 TRENCH WITH COMPACTED
    SUPERINTENDENT. SHALL BE COMPLETED AND EFFECTIVE PRIOR TO:                                                                                                                         GEOTEXTILE                                                                                                                                                                                                                                                                                                              BACKFILL AND ON ROCK, SET
    a. STRIPPING OF TOPSOIL AND GRASS.                                                                                             EARTH BANK                                          EMBEDDED 150mm
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               INTO SURFACE CONCRETE
    b. BULK EARTHWORKS TO THE SITE.                                                                                                                                                    INTO GROUND                                                                                                                                                                    PROVIDE WASH WATER FOR
    c. SERVICES INSTALLATION.                                                                                                                                                                                                                                                                   TIMBER SLEEPER OR METAL                                               TRUCKS EXITING SITE
    d. PAVEMENT CONSTRUCTION                                                                                                                                                FOR DROP INLETS AT NON-SAG POINTS,                                                                                  GRID 100mm HIGH AND




                                                                                                                                                                                                                                                                                                                                                                                                                                                                    600mm MIN.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          SECTION DETAIL
 5. ALL SEDIMENT MANAGEMENT MEASURES ARE TO REMAIN IN PLACE UNTIL INSTRUCTION IS                                                                                            SANDBAGS, EARTH BANK OR EXCAVATION USED                                                                             SPACED AT 300mm CTS                                                    MIN LE
    RECEIVED IN WRITING FROM THE SUPERINTENDENT TO REMOVE ALL OR PART OF THE SILT                                                                                                                                                                                                                                                                                            NGTH
                                                                                                                                                                            TO CREATE ARTIFICIAL SAG POINT                                                                                                                                                                            10m
    CONTROL APPLICATIONS.                                                                                                                                                                                                                                                                                                                                                                                        BERM 300 HIGH MIN
                                                                                                                                                                                                                                                                                             CONSTRUCTION SITE
 6. THE BULK EARTHWORKS AND SEDIMENT CONTROL LAYOUT PLAN SHALL BE READ IN                                                            GEOTEXTILE INLET FILTER CONSTRUCTION NOTES:
    CONJUNCTION WITH THE APPROVED DRAWINGS.




                                                                                                                                                                                                                                                                                                                                                                                                                                                 MIN. 1.5m
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   20m MAX.
 7. PRIOR TO COMMENCEMENT OF CONSTRUCTION APPROVAL IS TO BE OBTAINED FROM THE                                                        1.   FABRICATE A SEDIMENT BARRIER MADE FROM GEOTEXTILE OR STRAW BALES.                                                                                                                                                                                                                EXISTING ROADWAY
    SUPERINTENDENT FOR THE LOCATION OF THE SITE ACCESS POINT AND WASH DOWN AREA                                                                                                                                                                                                                                                                                                                                                                                                                                   FLOW
    WHICH ARE TO BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD.                                                                   2.   PICKET SPACING TO BE A MAXIMUM 1.0m CENTRES.
 8. IF SEDIMENT AND EROSION CONTROL DEVICES HAVE BEEN FOUND TO BE DIFFERENT OR FAILED                                                                                                                                                                                                                                                                                                                                                                                       STAR PICKETS AT
    IN SERVICE, CORRECTIVE ACTION IS TO BE UNDERTAKEN IMMEDIATELY WHICH MAY INCLUDE                                                                                                                                                                                                         GEOTEXTILE FABRIC                                                                                                                                                               MAX. 2.5m SPACINGS
                                                                                                                                     3.   IN WATERWAYS, ARTIFICIAL SAG POINTS CAN BE CREATED WITH SANDBAGS OR EARTH
    AMENDMENTS' ADDITIONS TO THE ORIGINAL APPROVED EROSION CONTROL PLANS. SUCH                                                            BANKS AS SHOWN IN THE DRAWING.                                                                                                                                                                                                                                                                                                    TYPICAL
    AMENDMENTS ARE TO BE APPROVED BY SUPERINTENDENT, IF DEEMED NECESSARY AND                                                                                                                                                                                                                                                                                          50-75mm GRAVEL BED MIN
    RELEVANT.                                                                                                                        4.   DO NOT COVER THE INLET WITH GEOTEXTILES UNLESS THE DESIGN IS ADEQUATE TO                                                                                                                                                    200mm THICK
 9. OVERALL
                                                                                                                                          ALLOW FOR ALL WATERS TO BYPASS IT.
    a. TEMPORARY DRAINAGE CONTROL FLOWS SHOULD BE DIVERTED AROUND THE WORK SITE                                                                                                                                                                                                                                              RUNOFF FROM PAD DIRECTED TO                                                                                                                                              PLAN
        WHERE POSSIBLE.                                                                                                                                                                                                                                                                                                      SEDIMENT TRAP
    b. ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND BE OPERATIONAL
                                                                                                                                                                GEOTEXTILE INLET FILTER A
       BEFORE COMMENCING UP-SLOPE EARTHWORKS.                                                                                                                                SCALE N.T.S
    c. IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, EXPOSED SURFACES TO BE
                                                                                                                                                                                                                                                                                                                 TEMPORARY CONSTRUCTION VEHICLE EXIT
       EITHER MULCHED, COVERED WITH EROSION CONTROL BLANKETS OR TURFED IF                                                                                                                                                                                                                                                                            SCALE: N.T.S.
       EARTHWORKS ARE EXPECTED TO BE DELAYED FOR MORE THAN 14 DAYS.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          DIRECTION
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  DISTURBED                                     1.5m STAR PICKETS AT
 SEDIMENT FENCE                                                                                               TIMBER SPACER TO SUIT                                  KERB-SIDE INLET                                                                                                                                                                                                                                                                                                                      OF FLOW
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  AREA                                          MAX. 2.5m CENTRES
 10. FOR SEDIMENT FENCE STANDARD DETAIL AND SPECIFICATION REFER TO INTERNATIONAL
     EROSION CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWINGS
     SF-01 AND SF-02 SEDIMENT FENCE.
 TEMPORARY CONSTRUCTION ENTRY/EXIT
 11. FOR CONSTRUCTION ENTRY / EXIT STANDARD DETAIL AND SPECIFICATION REFER TO
     INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES
     STANDARD DRAWINGS EXIT-01 AND EXIT-02 CONSTRUCTION EXIT - ROCK PAD (CONSTRUCTION
     SITES ONLY), EXIT-03 - ROCK PADS FOR BUILDING SITES AND EXIT-04 AND EXIT-05
     CONSTRUCTION EXIT - VIBRATION GRID.
 KERB INLET                                                                                                                                                     GRAVEL-FILLED WIRE MESH OR
 12. FOR KERB INLET STANDARD DETAIL AND SPECIFICATION REFER TO INTERNATIONAL EROSION                                                                            GEOTEXTILE "SAUSAGE"
     CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWING ESC-03                                                                                                                                                                                                                                                                                                                                                                                                UNDISTURBED
     KERB INLET SEDIMENT TRAPS
                                                                                                                                    OVERFLOW                                                                                                                                                                                                                                                                                                                                      AREAS
 REVEGETATION                                                                                                                                             TIMBER SPACER
                                                                                                   RUNOFF
 13. FOR REVEGETATION STANDARD SPECIFICATION REFER TO INTERNATIONAL EROSION CONTROL                                                                       TO SUIT
     ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWING R-01 REVEGETATION              WATER WITH
     GENERAL.                                                                                      SEDIMENT
 FIELD INLET                                                                                                                                                                                                      GRADIENT OF
 14. FOR FIELD INLET STANDARD DETAIL AND SPECIFICATION REFER TO INTERNATIONAL EROSION                                                                                                                             DRAIN 1% TO 5%                                        CAN BE CONSTRUCTED                                ALL BATTER GRADES
     CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWING ESC-02                                                                                                                                                                                      WITH OR WITHOUT                                   2(H):1(V) MAX.
     GRATED STORMWATER (FIELD) INLET SEDIMENT TRAP.                                                       SEDIMENT                                                                                                                                                      CHANNEL
 OPERATION AND MAINTENANCE
 15. IN ACCORDANCE WITH IECA GUIDELINES, ALL ESC MEASURES SHALL BE INSPECTED: · AT LEAST                                                                                                                          DIRECTION                                                                                                                                                                                STABILISE STOCKPILE SURFACE
                                                                                                    GRAVEL-FILLED WIRE MESH                                         FILTERED WATER                                                      OF FLOW
                                                                                                                                                                                                                                                                                                                                                                                                                                                 SEDIMENT FENCE CONSTRUCTION NOTES:
     DAILY (WHEN WORK IS OCCURRING ON SITE) OR WEEKLY (WHEN WORK IS NOT OCCURRING ON




                                                                                                                                                                                                                                                                                                                                           .
                                                                                                                                                                                                                                                                                                                                                    EARTH BANK




                                                                                                                                                                                                                                                                                                                                  300mm MIN
                                                                                                    OR GEOTEXTILE "SAUSAGE"                                                                                                                                                                                                                                                                              2:1
     SITE) · WITHIN 24 HOURS OF EXPECTED RAIN; AND · WITHIN 18 HOURS OF A RAINFALL EVENT (I.E.                                                                                                                                                                                                                                                                                                X.)              SL
     AN EVENT OF SUFFICIENT INTENSITY AND DURATION TO MOBILISE SEDIMENT ON SITE).                                                                                                                                                                                                                                                                                                     E   (MA                    OP
                                                                                                                                                                                                                                                                                                                                                                                                                      E(
                                                                                                                                                                                                                                                                                                                                                                                                                                                 1.          CONSTRUCT SEDIMENT FENCES AS CLOSE AS POSSIBLE TO BEING PARALLEL TO
                                                                                                                                                                                                                                                                                                                                                           FLOW                    OP                                   MA                                   THE CONTOURS OF THE SITE, BUT WITH SMALL RETURNS AS SHOWN IN THE
 16. IN ACCORDANCE WITH IECA ESC GUIDELINES, MAINTENANCE OF ESC MEASURES SHALL OCCUR                                                                                                                                                                                                                                                                                             SL                                       X.)
     IN ACCORDANCE WITH THE FOLLOWING TABLE:                                                                                                                                                                                                                                                                                                                               2:1                                                                               DRAWING TO LIMIT THE CATCHMENT AREA OF ANY ONE SECTION. THE
                                                                                                                                                                                                                                                                               2m MIN                                                                                                                                                                        CATCHMENT AREA SHOULD BE SMALL ENOUGH TO LIMIT WATER FLOW IF
 REPORTING                                                                                                     MESH & GRAVEL INLET FILTER CONSTRUCTION NOTES:
                                                                                                                                                                                                                                                                                                                                                                                                                                                             CONCENTRATED AT ONE POINT TO 50 LITRES PER SECOND IN THE DESIGN
                                                                                                                                                                                                                          150mm MIN



 17. CONTRACTOR IS TO PROVIDE AN UPDATED PROGRAM OF ESC MAINTENANCE AND CONTROL OF
     ALL STAGES OF WORK FOR APPROVAL BY THE SUPERINTENDENT.                                                                                                                                                                                                                                                                                                                                                                                                  STORM EVENT, USUALLY THE 10-YEAR EVENT.
                                                                                                               1.    INSTALL FILTERS TO KERB INLETS ONLY AT SAG POINTS.                                                                             NOTE: ONLY TO BE USED AS TEMPORARY BANK                                                                                                            SEDIMENT FENCE
                                                                                                                                                                                                                                                    WHERE MAXIMUM UPSLOPE LENGTH IS 80 METRES.
                                                                                                                                                                                                                                                                                                                                                                                                                                                 2.          CUT A 150mm DEEP TRENCH ALONG THE UPSLOPE LINE OF THE FENCE FOR THE
                                                                                                               2.    FABRICATE A SLEEVE MADE FROM GEOTEXTILE OR WIRE
                                                                                                                                                                                                                                                                                                                                                                                                                                                             BOTTOM OF THE FABRIC TO BE ENTRENCHED.
                                                                                                                     MESH LONGER THAN THE LENGTH OF THE INLET PIT AND
                                                                                                                     FILL IT WITH 25mm TO 50mm GRAVEL.                                                           DIVERSION DRAIN CONSTRUCTION NOTES:                                                                                                  STOCKPILE CONSTRUCTION NOTES:
                                                                                                                                                                                                                                                                                                                                                                                                                                                 3.          DRIVE 1.5m LONG STAR PICKETS INTO GROUND AT 2.5m INTERVALS (MAX.) AT
                                                                                                                                                                                                                 1.     BUILD WITH GRADIENTS BETWEEN 1% AND 5%.                                                                                       1.    PLACE STOCKPILES MORE THAN 2 (PREFERABLY 5) METRES FROM EXISTING                                 THE DOWNSLOPE EDGE OF THE TRENCH. ENSURE ANY STAR PICKETS ARE
                                                                                                               3.    FORM AN ELLIPTICAL CROSS-SECTION ABOUT 150mm HIGH
                                                                                                                                                                                                                                                                                                                                                            VEGETATION, CONCENTRATED WATER FLOW, ROADS AND HAZARD AREAS.                                     FITTED WITH SAFETY CAPS.
                                                                                                                     x 400mm WIDE.
                                                                                                                                                                                                                 2.     AVOID REMOVING TREES AND SHRUBS IF POSSIBLE - WORK AROUND THEM.
                                                                                                                                                                                                                                                                                                                                                      2.    CONSTRUCT ON THE CONTOUR AS LOW, FLAT, ELONGATED MOUNDS.                             4.          FIX SELF-SUPPORTING GEOTEXTILE TO THE UPSLOPE SIDE OF THE POSTS
                                                                                                               4.    PLACE THE FILTER AT THE OPENING LEAVING AT LEAST A
                                                                                                                                                                                                                 3.     ENSURE THE STRUCTURES ARE FREE OF PROJECTIONS OR OTHER                                                                                                                                                                               ENSURING IT GOES TO THE BASE OF THE TRENCH. FIX THE GEOTEXTILE WITH
                                                                                                                     100mm SPACE BETWEEN IT AND THE KERB INLET. MAINTAIN
                                                                                                                                                                                                                        IRREGULARITIES THAT COULD IMPEDE WATER FLOW.                                                                                  3.    WHERE THERE IS SUFFICIENT AREA, TOPSOIL STOCKPILES SHALL BE LESS                                 WIRE TIES OR AS RECOMMENDED BY THE MANUFACTURER. ONLY USE
                                                                                                                     THE OPENING WITH SPACER BLOCKS.
                                                                                                                                                                                                                                                                                                                                                            THAN 2 METRES IN HEIGHT.                                                                         GEOTEXTILE SPECIFICALLY PRODUCED FOR SEDIMENT FENCING. THE USE OF
                                                                                                                                                                                                                  4.    BUILD THE DRAINS WITH CIRCULAR, PARABOLIC OR TRAPEZOIDAL                                                                                                                                                                             SHADE CLOTH FOR THIS PURPOSE IS NOT SATISFACTORY.
                                                                                                               5.    FORM A SEAL WITH THE KERB TO PREVENT SEDIMENT
                                                                                                                     BYPASSING THE FILTER.                                                                              CROSS-SECTIONS, NOT "V" SHAPED.                                                                                               4.    WHERE THEY ARE TO BE PLACE FOR MORE THAN 10 DAYS, STABILISE
                                                                                                                                                                                                                                                                                                                                                            FOLLOWING THE APPROVED ESCP OR SWMP TO REDUCE THE C-FACTOR TO                        5.          JOIN SECTIONS OF FABRIC AT A SUPPORT POST WITH A 150mm OVERLAP.
                                                                                                               6.    SANDBAGS FILLED WITH GRAVEL CAN SUBSTITUTE FOR THE                                          5.     ENSURE BANKS ARE PROPERLY COMPACTED TO PREVENT FAILURE.                                                                             LESS THAN 0.10.
                                                                                                                                                                                                                                                                                                                                                                                                                                                 6.          BACKFILL THE TRENCH OVER THE BASE OF THE FABRIC AND COMPACT IT
                                                                                                                     MESH OR GEOTEXTILE PROVIDING THEY ARE PLACED SO
                                                                                                                                                                                                                 6.     COMPLETE PERMANENT OR TEMPORARY STABILISATION WITHIN 10 DAYS                                                                  5.    CONSTRUCT EARTH BANKS ON THE UPSLOPE SIDE TO DIVERT WATER                                        THOROUGHLY OVER THE GEOTEXTILE.
                                                                                                                     THAT THEY CAN FIRMLY ABUT EACH OTHER AND
                                                                                                                     SEDIMENT-LADEN WATERS CANNOT PASS BETWEEN.                                                         OF CONSTRUCTION.                                                                                                                    AROUND STOCKPILES AND SEDIMENT FENCES 1 TO 2 METRES DOWNSLOPE.

                                                                                                                          MESH & GRAVEL INLET FILTER                                                                                                                                                                                                                                                                                                                                   SEDIMENT FENCE
                                                                                                                                                                                                                                                       DIVERSION DRAIN                                                                                                                       STOCKPILES                                                                                        SCALE: N.T.S.
                                                                                                                                          SCALE N.T.S                                                                                                           SCALE N.T.S                                                                                                                         SCALE N.T.S



NOT FOR CONSTRUCTION
----      ----     ----                                                   ----    ----      North Point      Approved                                                                                                                                                                                                              Project Address                                                                              Title

----      ----     ----                                                   ----    ----
                                                                                                             EOIN WHITMORE
                                                                                                                                                                                                                                                                                                                                    17 BOTTLEBRUSH AVENUE, NOOSA                                                                SEDIMENT AND EROSION CONTROL NOTES AND DETAILS
----      ----     ----                                                   ----    ----                       31423      07/01/26                                                                                                                                                                                                    HEADS, QLD, 4567, Australia
----      ----     ----                                                   ----    ----                       For and on behalf of RECOR Pty Ltd.

----      ----     ----                                                   ----    ----                       Scale                                                                                                                    ENGINEERING & PROJECT SERVICES                                                               Client Details                                                                               Project Name                                                                                                Sheet Size
                                                                                                                                                                                                                                         SUNSHINE COAST | BRISBANE
----      ----     ----                                                   ----    ----                                                             NTS                                                                                  www.recor.au | ABN 89 647 469 707                                                            MADE CAPITAL                                                                               17 BOTTLEBRUSH AVENUE, NOOSA HEADS                                                                             A1
 A      07/01/26   ISSUED FOR OPW APPROVAL                                CS      EW                                                                                                         COPYRIGHT © This drawing is subject to copyright in accordance with the agreement between RECOR Pty Ltd and RECOR's                                                                                                                Project Number                                                Drawing Number                                 Revision
                                                                                                                                                                                             client. This drawing shall only be used for this specific project. This drawing shall not be used for construction until marked as

Rev     Date                   Revision Description                    Drawn Check                                                  DO NOT SCALE, IF IN DOUBT ASK                                                                  'Issued For Construction' in the revision description.                                                                                                                                       P0433-25-001                                                  C125                                             A

Used in these records

About this file

File size
5.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

P0433-25-001_17_Bottlebrush_Avenue_REVA.pdf · 5.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.