Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

102255ltr SMP Iss B

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 17, section 1. The text section number identifies this passage in the reader.

                  Rational Method Stormwater Calculations


        Table B1 - Discharge to Noosa Drive pre-development calculations




       Table B2 - Discharge to Noosa Drive post-development calculations




Note: The results are slightly different compared to those reported in the tables in the report due to
rounding.


Table B3 – Infiltration trench bypass discharge to Noosa Drive post-development
Log in to download the original file

102255ltr SMP Iss B.pdf · 8.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.