Detention Tank Deemed To Comply Solution Detention sizing calculation Site Area A 723 m2 Detention volume rate R 90 m3/ha Detention volume required V 6.5 kL 10% AEP pre-development flow (current day) Qo 0.028 m3/s Orifice calculation - 10% AEP and below Total tank height (expected water height) H.t 0.9 m Two thirds of height 2/3 H.t 0.60 m Outlet pipe diameter D 0.225 m Bottom third Target flow rate Q1.req 0.012 m3/s Depth of water above centroid of orifice h 0.56 m (@ D x 1/6) Orifice diameter Dia 0.086 m Office Area Ao 0.006 m2 No. of orifices No. 1 each Max. orifice diameter for multiple Dia 86 mm ANSWER Middle third Target flow rate Q2.req 0.014 m3/s Depth of water above centroid of orifice h 0.49 m (@ D x 1/2) Orifice diameter Dia 0.098 m Office Area Ao 0.008 m2 No. of orifices No. 1 each Max. orifice diameter for multiple Dia 98 mm ANSWER Top third Target flow rate Q3.req 0.002 m3/s Depth of water above centroid of orifice h 0.43 m (@ D x 5/6) Orifice diameter Dia 0.041 m Office Area Ao 0.001 m2 No. of orifices No. 1 each Max. orifice diameter for multiple Dia 41 mm ANSWER
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.