4
Using the above parameters, the stormwater discharge in the pre-development and post-
development scenarios to Noosa Drive were calculated as shown in Appendix B and
summarised in Table 1 and Table 2. The results demonstrate that the peak flow discharge from
the site is increased in the post-development case. Therefore, detention of the peak
stormwater discharges is required.
Table 1 – Site peak flow discharging to Noosa Drive (current climate)
Peak Flow (l/s)
AEP
Pre-development Post-Development Difference
10% 37 38 +1
1% 60 62 +2
Table 2 – Site peak flow discharging to Noosa Drive (2021 climate)
Peak Flow (l/s)
AEP
Pre-development Post-Development Difference
10% 44 46 +2
1% 72 74 +2
Table 3 – Infiltration trench bypass peak flow discharging to Noosa Drive (current climate)
Peak Flow (l/s)
AEP
Trench Bypass only
10% 7
1% 12
The detention tank and outlets were designed in accordance with the following guideline:
• “On-site Underground Detention Storage Orifice Plate Sizing for Deemed-to-comply
Detention: Fact Sheet” by Sunshine Coast Council (2018)
The detention tank storage volume was calculated as shown below:
𝐷𝑒𝑡𝑒𝑛𝑡𝑖𝑜𝑛 𝑣𝑜𝑙𝑢𝑚𝑒 = 90 𝑚3 ⁄𝐻𝑎 × 0.0723 𝐻𝑎 = 6.5 𝑚3
Therefore, the required detention tank volume is 6.5 m3. A detention tank, in the form of an
infiltration trench, with 6.5 m3 has been proposed for each lot.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.