Original source · versioned page text
102255ltr SMP Iss B
Original PDF page 6, section 1. The text section number identifies this passage in the reader.
6 Conclusion This Stormwater Management Plan (SMP) has shown compliance with the stormwater drainage requirements outlined in the Noosa Plan (2020). This site based SMP has demonstrated that efficient management of stormwater runoff for the proposed development is possible by adopting the stormwater strategies set out in this report. Trusting the above is to your satisfaction. Should further information be required please contact this office. Yours faithfully COVEY ASSOCIATES PTY LTD ALLISTER GAFFNEY Civil Engineer BEng(Civil), MEng, RPEQ 24345 References Noosa Council (2020), Noosa Plan 2020. Sunshine Coast Council (2018), On-site Underground Detention Storage Orifice Plate Sizing for Deemed-to-comply Detention: Fact Sheet, Sunshine Coast Council.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.