Council archive · source document
Generally in Accordance Approval OPW12 0095.02 · OPW12/0095.02
Text sections not matched to the original PDF pages. See original document to check page numbers.
Officer: Mark Lewis Direct Telephone: 07 53296290 Our Reference: OPW12/0095.02 Your Reference: . 31 August 2021 JFP Urban Consultants Pty Ltd PO Box 6 MAROOCHYDORE QLD 4558 [email protected] Dear Sir Generally in Accordance I refer to your letter requesting Council to endorse revised plans for the subject site. On 31 August 2021, Council considered the request to be generally in accordance with the Development Approval. Details of the decision are as follows: application details Application No: OPW12/0095.02 Street address: 35 Walter Hay Dr Noosaville Qld 4566 Real property description: Lot 2 SP 162077 Planning Scheme: Noosa Plan 2020 (25 September 2020) Decision details The plans listed in the following table are considered generally in accordance with the approval. Plan No. Rev Plan/Document Name Date M1717E5-L01 A Construction Staging Plan, prepared by JFP Consulting Engineers 28 February 2018 M1717E5-EW01 C Earthworks Layout Plan, prepared by JFP Consulting Engineers 4 May 2018 M1717E5-EW02 B Earthworks Details Plan, prepared by JFP Consulting Engineers 27 April 2018 M1717E5-R01 E Roadworks Layout Plan, prepared by JFP Consulting Engineers 9 August 2021 M1717E5-R02 A Roadworks Details Plan, prepared by JFP Consulting Engineers 28 February 2018 M1717E5-R03 G Roadworks Intersection Details Plan, prepared by JFP Consulting Engineers 9 August 2021 M1717E5-R04 A Roadworks Longitudinal Sections Swallow Street, prepared by JFP Consulting Engineers 28 February 2018 M1717E5-R05 A Roadworks Cross Sections Swallow Street, prepared by JFP Consulting Engineers 28 February 2018 M1717E5-R06 B Roadworks Longitudinal Sections Blue Gum Street, prepared by JFP Consulting Engineers 10 January 2020 M1717E5-R07 A Roadworks Cross Sections Blue Gum Street, prepared by JFP Consulting Engineers 28 February 2018 M1717E5-R08 B Roadworks Sections Silver Gull Boulevard, prepared by JFP Consulting Engineers 27 April 2018 M1717E5-R09 A Roadworks Details, prepared by JFP Consulting Engineers 28 February 2018 M1717E5-D02 D Drainage Layout Plan, prepared by JFP Consulting Engineers 4 June 2018 M1717E5-D03 C Drainage Longitudinal Sections, prepared by JFP Consulting Engineers 4 June 2018 other details If you wish to obtain more information about Council’s decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council offices. Yours faithfully, Mark Lewis Coordinator - Engineering Enc: Approved Plans cc: Unitywater [word/footer1.xml] Page 2 of 2 [word/footer2.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Generally in Accordance - OPW12/0095.02 Page 1 of 2 [word/header1.xml] 3 [Attachment: image2.jpeg (image text)] ee) NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Generally in Accordance Approval OPW12 0095.02Related documentApplication case desk ↗
About this file
- File size
- 214 KB (small file)
- File type
- DOCX
No other editions are linked here.