Skip to the record
Every meeting, every word.

Original source · versioned page text

Idas Form 1

Attached to the e-mail Operational Works Application OPW17/0055.

of 7

Page text shows just the words. Original shows the document exactly as it was published.

Email address (non-mandatory requirement)            [email protected]

Applicant’s reference number (non-mandatory          16-003302
requirement)

1.    What is the nature of the development proposed and what type of approval is being sought?

Table A—Aspect 1 of the application (If there are additional aspects to the application please list in Table B—Aspect 2.)
a)   What is the nature of the development? (Please only tick one box.)
         Material change of use          Reconfiguring a lot            Building work               Operational work

b)   What is the approval type? (Please only tick one box.)
         Preliminary approval            Preliminary approval           Development permit
          under s241 of SPA               under s241 and s242
                                          of SPA
c)   Provide a brief description of the proposal, including use definition and number of buildings or structures where
     applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)
     220 SITE RETIREMENT COMMUNITY, ROADWORKS AND DRAINAGE



d)   What is the level of assessment? (Please only tick one box.)
         Impact assessment               Code assessment


Table B—Aspect 2 of the application (If there are additional aspects to the application please list in Table C—
Additional aspects of the application.)
a)   What is the nature of development? (Please only tick one box.)
         Material change of use          Reconfiguring a lot            Building work               Operational work

b)   What is the approval type? (Please only tick one box.)
         Preliminary approval            Preliminary approval           Development
          under s241 of SPA               under s241 and s242            permit
                                          of SPA
c)   Provide a brief description of the proposal, including use definition and number of buildings or structures where
     applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)




d)   What is the level of assessment?
         Impact assessment               Code assessment


Table C—Additional aspects of the application (If there are additional aspects to the application please list in a
separate table on an extra page and attach to this form.)
         Refer attached schedule         Not required



                                                                                              IDAS form 1—Application details
                                                                                                     Version 4.1—4 July 2014
Log in to download the original file

IDAS FORM 1.pdf · 441 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.