Amended Landscape Plans

of 6

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                               T ice eekly during prolonged rain
PROJECT SPECIFICATIONS                                                                  · All stockpiles are to be protected it suitable erosion control devices     graded to                       TREE PROTECTION MEASURES                                                                                OPERATIONS - DISTURBED AREAS
This plan has been developed to comply with the Noosa Shire Council                       ensure control of runoff                                                                                   · T e follo ing tree protection measures must at all times be ad ered to during any                     · Identify eeds If unsure consult A All ot er vegetation to be protected and
Planning Scheme as applicable where practical                                           · Coordinate installation of sediment erosion control devices it civil contractor to                           on site orks generally in accordance it AS49 0 2009 protection of trees on                                retained
ABBREVIATIONS                                                                             ensure compatibility consistency in control measures                                                         development sites A ill advise ere measures are required at Pre start but is                          · Treat all eeds and pasture grasses Refer to eed Removal Sc edule
AS Australian Standard                                ot dipped                         · All e posed surfaces once completed s all be immediately stabili ed to prevent                               generally to standard s of e isting trees t at are s o n as re abilitation areas                      · ecompact ground and cultivate to 5mm deep
EP Establis ment Period                           A andscape Arc itect                    erosion                                                                                                    · Prior to commencement of orks t e contractor to organise a pre construction                           · rade ground surface to create smoot falls a ay from pat s ere necessary
N A Not applicable                               OC On centre                                                                                                                                          meeting to identify trees for protection removal and or pruning                                       · Remove all ant ropogenic rubbis
  P   aintenace Period                           m2 Square metres                       EDGING                                                                                                       · Protective fencing is to be installed around t e tree protection one generally in                     · Obtain a report by a qualified person identifying at tree maintenance measures
m3 Cubic etres                                   T P Typical                            Spade Edge                                                                                                     accordance it AS49 0 2009 prior to site establis ment and remain intact and                               are required and utili e a qualified person to conduct t e orks
NATA National Association of Testing Aut orities S PER Superintendent                   · Install Spade Cut edge as located on plans        as per detail                                              monitored and certified by t e project arborist until completion of orks                              · op dead dying or dangerous limbs or trees as required to remove risk of injury to
uPVC    nplasticised polyvinyl C loride Pipe     NSC Noosa S ire Council                                                                                                                             · Refer to etail for protective fencing specifications                                                    users of t e area Cut up aste material into 1 2 meter lengt s and place flat on
  B     ater by esign                             AO andscape Assessment Officer        REHABILITATION AREAS                                                                                         · Any orks it in t e tree protection one to be supervised by t e project arborist                         ground surface it in regeneration ones at least 5 meters from pat s and ot er
                                                                                        Soil                                                                                                         · Activities it in t e tree protection one are to be aut orised and supervised by t e                     infrastructure
PROJECT PLANNING CONDITIONS - DEMONSTRATION OF COMPLIANCE                               · Civil engineering eart ork operations ill ave arvested stockpiled site topsoils                              project arborist No compaction from ve icles pedestrian movement stockpiling of                       · All felled vegetation is to be retained on site resultant mulc is to be used in
· Apart from declared eeds all e isting vegetation s all be retained as been               andscape contractor to coordinate it civil contractor to ensure topsoil is                                  top soil e cavation no dumping of aste or cutting it in t e root one s is to                            revegetation landscaping or soil stabilisation activities
  identified it retention protection measures for suc are nominated erein                 re installed per t e follo ing specifications in respective landscape areas                                  occur                                                                                                 · Add 100mm ulc to all disturbed areas
· Identified areas are confined to areas of eed management t ose nominated on           · Clear remove all non organic deleterious and large organic matter suc as rocks                             · Any orks carried out beneat t e canopy s of t e tree is to be supervised by t e
  t ese plans it associated orks described erein                                          greater t an 40mm diameter tree roots trunks limbs and stumps from all areas to                              project arborist to ensure t at t e correct arboreal tec niques are utilised                          OPERATIONS - UNDISTURBED AREAS
· Plant sc edules are as per;                                                             be landscaped                                                                                                                                                                                                      · Identify eeds If unsure consult A All ot er vegetation to be protected and
                                                                                        · E cavate and remove off site any remaining fill to turf and garden areas to ensure                         VEGETATION MANAGEMENT PROTECTION PROGRAM
                                                                                                                                                                                                                                                                                                                 retained
                                                                                          correct dept s for topsoils                                                                                                                                                                                        · Treat all eeds and pasture grasses Refer to eed Removal Sc edule
              RE 12 3 4                                                                                                                                                                               Issue                         Vegetation management - clearing & protection
              All required species substitutions are to be confirmed in riting          · andscape contractor to conduct soils analyses tests to stockpiled topsoils and                                                                                                                                     · Remove all ant ropogenic rubbis
              from council s parks branc prior to t e commence of any landscape ork       ameliorate per recommendations prior to re spreading Furnis la it results                                                                                                                                          · op dead dying or dangerous limbs or trees as required to remove risk of injury to
                                                                                           andscape contractor to allo for for p balancing nutrient ameliorations all soil                            Objective                       Identify areas of vegetation individual trees to be
                                                                                                                                                                                                                                      protected retained it in t e development areas t ose                     users of t e area Cut up aste material into 1 2 meter lengt s and place flat on
                                                                                          testing to be conducted by a lab accredited by NATA                                                                                                                                                                  ground surface it in regeneration ones at least 5 meters from pat s and ot er
                                                                                                                                                                                                                                      to be cleared
                                                                                                                                                                                                                                      Ensure t at orkers understand t e requirements of                        infrastructure
                                                                                        Cultivate                                                                                                                                                                                                            · All felled vegetation is to be retained on site mulc is to be used in revegetation
PROJECT DESCRIPTION                                                                     · Cultivate ground in all disturbed areas to a dept         ere possible to 5mm dept for
                                                                                                                                                                                                                                      protection retention install protective devices to
 THIS WORK COMPRISES OF;                                                                                                                                                                                                              ensure no accidental damage occurs                                       landscaping or soil stabilisation activities
                                                                                          inspection before installation of soil re ab                                                                                                Ensure t at clearing met ods are appropriate for areas                 · Identify location for supplement planting for canopy integrity
                                                                                        · Avoiding any root systems                                                                                                                   being cleared especially in t e vicinity of areas to be
    1)        CONSTRUCTION WORKS:                                                                                                                                                                                                                                                                            WEED REMOVAL SCHEDULE
              a Retaining associated drainage                                                                                                                                                                                         protected
                                                                                        Mulch                                                                                                                                         Ensure t at t e ork program is suc as to minimise t e                      Task                       Operation                                     Frequency
              b Installation of slope drainage stabilisation products
                                                                                        · Organic and inorganic mulc es are required to be installed over all garden areas                                                            time bet een en clearing occurs t e cleared ground                                                    Remove entire plant by and Alternatively kill Follo ing
              c Tree protection fencing                                                                                                                                                                                                                                                                          Herbaceous                 plant it erbicide application using ick iper identification of
                                                                                              ere s o n on t e dra ings                                                                                                               is stabilised to reduce t e c ances of silt movement
                                                                                        · All mulc es supplied must be clean free from live eeds eed seeds specifically                                                               Ensure t at cleared material is mulc ed or ood c ipped                     and small                  or ooded spray no le For erbaceous eeds eeds As
              REHABILITATION OF EXISTING VEGETATION WORKS;                                                                                                                                                                            as appropriate or disposed of in an approved manner                        weed control               cut or scrape stem and paint it 1:1 mi of     required to kill
                                                                                          nutsedge pests soil borne viruses and diseases Furt er S PER it certifications
              a Installation of supplementary trees s rubs to improve canopy e tent                                                                                                                                                                                                                                                         glyp osate and ater                             eeds
                                                                                          respectively for approval prior to installations
                bio diversity                                                                                                                                                                                                          Ensure vegetation to be retained is correctly identified                                              rill and fill or frilling erbicide is delivered into Follo ing
                                                                                          ulc types include:                                                                                          Tasks
                                                                                        · Forest Blend ulc 100mm dept to all revegetation areas                                                                                        clearly marked protective devices are installed                                                     sap ood via drilled oles or frill cut pockets          identification of
                                                                                                                                                                                                                                                                                                                 Large and
              REVEGETATION OF DEGRADED LAND;                                                                                                                                                                                           maintained in functional condition
                                                                                        · Supply install to s ale areas a layer of 50 100mm gravel spalls to 150mm dept                                                                                                                                          woody weed                immediately after ound is made If                        eeds As
              a Installation of supplementary trees s rubs to create ne canopy and                                                                                                                                                     Vegetation to be retained protected s all be as                                                     accessibility permits cut stump met od Cut             required to kill
                                                                                                                                                                                                                                                                                                                 control
              increase bio diversity                                                                                                                                                                                                   nominated per plan field adjusted on site by la                                                     tree 30mm above ground and paint stump it                eeds
                                                                                        TUBESTOCK PLANTING, SETOUT & TREE GUARD
                                                                                                                                                                                                                                       Protection fence s all be used to protect vegetation                                                undiluted glyp osate
                                                                                        · Bamboo stake setout of trees and s rubs for approval by S PER                                                                                nominated for retention Fence to be as per detail
    2)        VEGETATION MANAGEMENT & PROTECTION;
                                                                                        · Setout to be staggered and random to account for terrain variation and replicate                                                                                                                                                                 Remove aste material containing flo ers or                 Follo ing
                                                                                                                                                                                                                                                                                                                 Remove or                 seeds or eed species from site t at can s oot
                                                                                          natural c aracter                                                                                                                            Integrity of protection devices                                                                                                                                identification of
    3)        WEED MANAGEMENT - CONSTRUCTION PHASE                                                                                                                                                     Performance                                                                                               manage
                                                                                        · Install tubes per re abilitation sc edules densities specifications         details                                                          Retained vegetation trees retained in good ealt                it
                                                                                                                                                                                                                                                                                                                                           from pieces of plant ispose of at approved                   eeds As
              a eed management under e isting canopy of all oody oods and                                                                                                                              indicators                                                                                                vegetative                facility aste material to be covered en
                                                                                        · Install tree guard in nominated location as per detail                                                                                       no scars from eart orks mac inery                                         waste
                                                                                                                                                                                                                                                                                                                                                                                                      required to kill
              reduction of erbaceous grassy eeds                                                                                                                                                                                                                                                                                           removing from site
                                                                                        · aintain as per sc edule                                                                                                                                                                                                                                                                                       eeds
                                                                                         andscape contractor to ater plantings during construction period                                                                             eekly inspection           log by responsible person
    4)        WEED & LANDSCAPE MANAGEMENT - MAINTENANCE PHASE                                                                                                                                          Frequency
                                                                                        VEGETATION PERFORMANCE OBJECTIVES - Criteria applies to tubestock planting                                                                                                                                           ·      ere furt er detail is required follo industry standards and met odologies or
                                                                                                                                                                                                                                                                                                                 contact S PER
1. CONSTRUCTION WORKS                                                                    Trees:                 At end of 12 month At end of 2 yr                       3 Yr Off                                                    Responsible person for contractor reporting to super
                                                                                                                                                                                                       Responsible
PRELIMINARIES                                                                            Criteria               establishment      establishment                        maintenance
· Refer to plans by ot ers for all services locations footpat orks levels ot er t an
                                                                                                                                                                                                       person                                                                                                WEED MANAGEMENT - MAINTENANCE PHASE
                                                                                                                and maintenance    and maintenance                      Objective                                                                                                                            · T is plan as been developed to specify regeneration operations for t e e isting
  t ose indicated on t ese plans       boundaries All services related infrastructure                                                                                                                                                ont ly for eac separable portion of contract to site
                                                                                                                period             period                                                              Reporting                                                                                                 riparian one
  including street lig ting s o n on t ese plans are indicative only                                                                                                                                                                construction manager
                                                                                         Percentage of          95%                         90%                         85%                                                                                                                                  · NOTE: T e regeneration plan must be read in conjunction it t e operational orks
· Call dial before you dig 11 00 prior to any excavation.
                                                                                         plants alive                                                                                                                                 ake good or replace any damage to trees or vegetation                      landscaping decision notice and site environmental management plan
· Plan dimensions take precedence over scaled dimensions                                                                                                                                               Corrective
                                                                                         and healthy                                                                                                                                t at are marked for protection and retention; reinstate
· Prior to commencing construction orks verify in t e field dimensions levels                                                                                                                          action
                                                                                                                                                                                                                                    protective devices                                                       OBJECTIVES
  location of site services refer engineer s dra ings generally                          Average height         1000mm                      2000mm                      3000mm
                                                                                                                                                                                                                                                                                                             1 To en ance t e ecological value of t e locality
· Contractor to revie all sc edules erein to confirm t eir correlation to t ese plans
                                                                                         Shrubs:                At end of 12 month At end of 12 month                   Off                                                                                                                                  2 To remove eeds and minimise future incursion
      ere discrepancies occur it in landscape documentation refer to A prior to                                                                                                                      WEED MANAGEMENT - CONSTRUCTION PHASE
                                                                                         Criteria               establishment      establishment                        maintenance                                                                                                                          3 Encourage natural recruitment and regeneration
  provision of tender pricing or construction                                                                                                                                                        · T is plan as been developed to specify regeneration operations for t e e isting
                                                                                                                and maintenance    and maintenance                      Objective                                                                                                                            4 Re abilitate degraded areas
· All proposed fence alignments e cept vegetation protection fencing are to be                                                                                                                         riparian one
                                                                                                                period             period                                                                                                                                                                    5 Satisfy t e recreational requirements of residents as ell as t e ecological
  pegged by a licensed surveyor in coordination it project surveyor                                                                                                                                  · NOTE: T e regeneration plan must be read in conjunction it t e operational orks                          requirements of a flora and fauna reserve
                                                                                         Percentage of          95%                         90%                         85%                            landscaping decision notice and site environmental management plan
SEDIMENT & EROSION CONTROL                                                               plants alive
                                                                                                                                                                                                                                                                                                             · From practical completion all maintenance activities as per follo ing sc edule need
·     ere applicable T e landscape contractor to implement maintain for t e              and healthy                                                                                                 OBJECTIVES                                                                                                  to be conducted until project completion
  contract duration best practice erosion sediment control measures in accordance                                                                                                                    1 To en ance t e ecological value of t e locality
    it t e manual for erosion sediment control maroon manual good                        Average height
                                                                                                                400mm                       1000mm                      1200mm                       2 To remove eeds and minimise future incursion
  environmental practice t e consulting civil engineers specification for erosion        or width
                                                                                                                                                                                                     3 Encourage natural recruitment and regeneration
  sediment control Penalties fines for non compliance ill apply                         2. RIPARIAN ZONES A & B                                                                                      4 Re abilitate degraded areas
· Install silt control fencing in accordance it site environmental management plan                                                                                                                   5 Satisfy t e recreational requirements of residents as ell as t e ecological
  local aut ority regulations                                                           VEGETATION MANAGEMENT & PROTECTION
                                                                                                                                                                                                        requirements of a flora and fauna reserve
· Sediment erosion control devices to be installed ere necessary as directed on         · Native vegetation e ists on site In order to ma imise t e retained ecological values
  site by super                                                                           for t e site nominated e isting vegetation requires protection         management
                                                                                        · Natural vegetation regeneration needs to be encouraged                                                     PRELIMINARIES
· All sediment erosion control devices are to be installed in accordance it                                                                                                                          · Before ork commences t e S PER is to organise a pre start meeting it t e
  manufacturer s specifications                                                         · Site eed removal is important to allo regeneration
                                                                                        · Vegetation to be protected is plan nominated predominately native species in a                               landscape arc itect and NSC environment landscape officer to establis scope of
· T e contractor is responsible for ensuring sediment erosion control devices are                                                                                                                        orks management procedures and clarify any issues
  inspected maintained                                                                     ealt y safe condition t at are not located so as to interfere it required
                                                                                          approved site orks                                                                                         ·    ere any discrepancies occur refer to A
                                                                                        · T e follo ing table summari es t e vegetation management program elements;

Client                                                                  Project                                                                                                                                                                             NORTH                            TITLE:                     JOB No.: S21091111
                                                                                                                                                                                                                                                                                                                                                                       anembo consultants
                                                                                                                                                                                                                                                                                                                        FILE:   220119
Rhiana Magee                                                            15 Jirrima Cr, Cooroibah                                                                                                              C    19.01.22    COUNCIL RFI        CK   TH                                                               DWG. No.     LD2
                                                                                                                                                                                                                                                                                                                                                                       Landscape Architects
                                                                                                                                                                                                                                                                                                                                                                       Environmental
                                                                                                                                                                                                                                                                                                                                                                                                           Project Management


This document is the copyright of anembo consultants & shall
                                                                        LANDSCAPE REHABILITATION                                                                                                              B    13.10.21 COUNCIL SUBMISSION    CK   TH                                                            SHEET         2 OF 6                              anembo consultants pty.ltd.
                                                                                                                                                                                                                                                                                                                                                                       Sunshine Coast:   PO Box 24
                                                                                                                                                                                                                                                                                                                                                                                                         A.B.N. 75 089 473 156
                                                                                                                                                                                                                                                                                                                                                                                                     Moffat Beach   QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale
                                                                        & OPERATIONAL WORKS PLAN                                                                                                              A    22.09.21    FOR REVIEW         CK   TH                                                               -                                              Ph: 07 5437 0000
can not be guaranteed when printing from PDF files.                                                                                                                                                                                                                                                                                                                    email: [email protected]                www.anembo.com
                                                                                                                             ISSUE   DATE    DESCRIPTION    DRWN CKD ISSUE   DATE   DESCRIPTION   DRWN CKD ISSUE    DATE      DESCRIPTION        DRWN CKD   APPROVED:   T Hindley ALIA 713   GENERAL NOTES              -
Log in to download the original file

Amended Landscape Plans.pdf · 1.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.