Council archive · source document
Appendix C - Infrastructure Services Report · MCU23/0070
Very large file (11.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
INFRASTRUCTURE
REPORT
Proposed Development at
36 – 38 Duke Street, Sunshine Beach
for
Cambooya Pty Ltd
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of sections 2 to 34 (of 51)
Section 2
INFRASTRUCTURE REPORT Approval for an MCU for a Multi‐Storey 5 Multiple Dwellings and Food and Drink Outlet Development at 36 – 38 Duke Street, Sunshine Beach for Cambooya Pty Ltd M3024 – Revision B (April 2023) JFP Urban Consultants Pty Ltd Prepared by: Andrew Fraser Approved by: Andrew Fraser INFRASTRUCTURE REPORT – Revision B (April 2023) 36 – 38 Duke Street, Sunshine Beach P a g e |2
Section 3
TABLE OF CONTENTS
INTRODUCTION ............................................................................................................................ 4
1.1 PURPOSE ........................................................................................................................... 4
1.2 PROJECT INFORMATION ................................................................................................... 4
DEVELOPMENT SITE ..................................................................................................................... 5
2.1 SITE .................................................................................................................................... 5
2.2 EXISTING INFRASTRUCTURE ............................................................................................. 5
2.3 PROPOSED INFRASTRUCTURE .......................................................................................... 5
2.4 TOPOGRAPHY & SITEWORKS ............................................................................................ 5
SITE ACCESSIBILITY ....................................................................................................................... 7
3.1 ROAD SYSTEM / ACCESS.................................................................................................... 7
3.2 PEDESTRIAN ACCESSIBILITY .............................................................................................. 7
3.3 CAR PARKING FACILITIES ................................................................................................... 7
STORMWATER & WATER QUALITY MANAGEMENT ..................................................................... 8
4.1 STORMWATER MANAGEMENT......................................................................................... 8
4.2 WATER QUALITY MANAGEMENT...................................................................................... 8
AUTHORITY SERVICES .................................................................................................................. 9
5.1 SERVICES WITHIN THE DEVELOPMENT ............................................................................ 9
5.2 SEWERAGE RETICULATION ............................................................................................... 9
5.3 WATER RETICULATION ...................................................................................................... 9
5.4 ELECTRICITY & TELECOMMUNICATIONS .......................................................................... 9
APPENDIX A................................................................................................................................ 10
APPENDIX B ................................................................................................................................ 11
APPENDIX C ................................................................................................................................ 12
APPENDIX D ............................................................................................................................... 13
10 APPENDIX E ................................................................................................................................ 14
INFRASTRUCTURE REPORT – Revision B (April 2023) 36 – 38 Duke Street, Sunshine Beach P a g e |3
Section 4
INTRODUCTION
1.1 PURPOSE
JFP Urban Consultants Pty Ltd has been commissioned by Cambooya Pty Ltd to prepare an
infrastructure report to demonstrate how the proposed development at 36 – 38 Duke Street, Sunshine
Beach will be satisfactorily serviced to meet Council’s requirements.
This report accompanies the application to Council by JFP Urban Consultants Pty Ltd for approval for a
Material Change of Use (MCU) for multi‐story 5 multiple dwellings and a food and drink outlet
development at grade, with vehicle access via Douglas Lane.
Additional supplementary drawings and reports have been prepared to accompany this application as
follows:
Appendix A – Max Watterson + Associates: Detail and Contour Plan
Appendix B – Blackburne Jackson: Architectural Floor Plans
Appendix C – JFP Urban Consultants: Site Based Stormwater Management Plan
Appendix D – Council Stormwater & Unitywater Existing Services Plans
Appendix E – TTM Traffic Report
1.2 PROJECT INFORMATION
Pre‐lodgement Meeting PLM22/0047
Application Number
Applicant Cambooya Pty Ltd
C/‐ JFP Urban Consultants Pty Ltd
Kon‐Tiki Business Centre – Tower 1, Level 2, Suite T1.209
55 Plaza Parade, Maroochydore QLD 4558
Street Address 36 – 38 Duke Street, Sunshine Beach
RP description Lots 370 & 371 on RP48111
Local Government Noosa Council
INFRASTRUCTURE REPORT – Revision B (April 2023) 36 – 38 Duke Street, Sunshine Beach P a g e |4
Section 5
DEVELOPMENT SITE
2.1 SITE
The site comprises a single portion of land on two lots bounded by commercial / residential
development to the east and west, Duke Street to the south and Douglas Lane to the north. The site is
described as Lots 370 & 371 on RP48111 Sunshine Beach. Total site area is approximately 486m2.
Vehicle access will be provided via Douglas Lane at the rear of the site.
It is proposed to develop the site in accordance with the accompanying architectural plans – refer to
Blackburne Jackson Drawing No. 7252‐DA05, attached in Appendix B of this report for details.
2.2 EXISTING INFRASTRUCTURE
The proposed development will be designed to integrate, where possible with existing services within
the area. Existing civil infrastructure located in the vicinity of the site identified during preparation of
this report include:
Existing Unitywater water mains located in Duke Street abutting the southern side of the site; and
Existing Unitywater sewerage (wastewater) pipeline located in Duke Street abutting the southern
side of the site
All works will be carried out in accordance with Council’s relevant planning scheme policy and
Unitywater guidelines / approvals.
2.3 PROPOSED INFRASTRUCTURE
Civil infrastructure that will be provided in conjunction with the development include:
Bulk earthworks;
Stormwater connection to existing / additional kerb adaptors in Duke Street;
Sewerage (wastewater) connection to existing Unitywater HCB in Duke Street;
Water supply connection to existing / new Unitywater meter assembly in Duke Street; and
Electrical and telecommunication connection in conjunction with Energex / NBN
Design will be carried out in accordance with Council’s relevant planning scheme policy and Australian
Standards. Internal building hydraulics will be undertaken by a specialist Hydraulic Consultant.
2.4 TOPOGRAPHY & SITEWORKS
Existing buildings on the site will be demolished and disposed off site.
Earthworks will be profiled to finished surface levels detailed on the architectural drawings. The rear of
the site has steep topography which will require implementation of appropriate stability and erosion
and control measures during construction works.
INFRASTRUCTURE REPORT – Revision B (April 2023) 36 – 38 Duke Street, Sunshine Beach P a g e |5
Section 6
Refer to the site specific Geotechnical Report prepared by Core Consulting for assessment of site stability and recommendations for construction and protection of adjoining properties during the development. A copy of the Core Consulting Geotechnical Report is included in the development application documentation. All construction activities including earthworks will be managed under the control of the superintendent. All earthworks will be contained within the site. INFRASTRUCTURE REPORT – Revision B (April 2023) 36 – 38 Duke Street, Sunshine Beach P a g e |6
Section 7
SITE ACCESSIBILITY 3.1 ROAD SYSTEM / ACCESS Vehicle access will be provided via Douglas Lane at the rear of the site. Driveways and crossovers (where provided) will be suitable and safe for their intended use and vehicle access will not adversely impact on safety, capacity and operation of the existing road network in Douglas Lane. Driveway access grades have been based on Section 2.5 and Section 2.6 of AS/NZS 2890.1:2004 “Parking facilities Part 1: Off‐street car parking” and allow access for a B99 vehicle without scraping or bottoming. 3.2 PEDESTRIAN ACCESSIBILITY Food and drink outlet patrons will be provided with at grade pedestrian access off Duke Street. Residential tenants will be provided with at grade pedestrian access via Duke Street and Douglas Lane driveway entrance at the rear of the site. 3.3 CAR PARKING FACILITIES Sufficient off street car parking will be provided for residential tenants in accordance with Council guidelines. Food and drink outlet patrons will utilise the existing car parking facilities in Duke Street. Internal car parking facilities will be provided with reference to AS/NZS 2890.1:2004. Refer to TTM Traffic Report attached in Appendix E of this report for details. INFRASTRUCTURE REPORT – Revision B (April 2023) 36 – 38 Duke Street, Sunshine Beach P a g e |7
Section 8
STORMWATER & WATER QUALITY
MANAGEMENT
4.1 STORMWATER MANAGEMENT
Refer to JFP Urban Consultants Site Based Stormwater Management Plan (hydraulic assessment)
attached in Appendix C of this report for details.
Post development flows will be retarded back to pre‐development levels via an internal detention
tank. Stormwater discharge will be via connection to existing / additional kerb adaptors in Duke Street.
Stormwater runoff from the new development will be directed to Council’s existing drainage system to
avoid any adverse impacts on adjoining properties or the Duke Street road reserve.
Stormwater drainage design will be carried out in accordance with Council’s relevant planning scheme
policy and QUDM.
4.2 WATER QUALITY MANAGEMENT
Refer to JFP Urban Consultants Site Based Stormwater Management Plan (water quality advice)
attached in Appendix C of this report for details.
INFRASTRUCTURE REPORT – Revision B (April 2023) 36 – 38 Duke Street, Sunshine Beach P a g e |8
Section 9
AUTHORITY SERVICES 5.1 SERVICES WITHIN THE DEVELOPMENT Underground electrical supply and telecommunications connections (by Energex / NBN) will be provided within the site. The hydraulic consultant will document internal building hydraulics and sewerage (wastewater) connection to the existing Unitywater HCB (house connection branch) in Duke Street. The hydraulic consultant will document internal building hydraulics and water supply connection to the existing / new Unitywater meter assembly in Duke Street. 5.2 SEWERAGE RETICULATION The hydraulic consultant will document internal building hydraulics and sewerage (wastewater) connection to the existing Unitywater HCB in Duke Street The sewerage (wastewater) system will be designed in accordance with Noosa Council plumbing code requirements. 5.3 WATER RETICULATION The hydraulic consultant will document internal building hydraulics and water supply connection to the existing / new Unitywater meter assembly in Duke Street. The water reticulation and fire fighting system will be designed in accordance with Noosa Council plumbing code requirements. 5.4 ELECTRICITY & TELECOMMUNICATIONS It is anticipated that with appropriate modification/upgrade works the existing Energex and NBN distribution systems will have adequate capacity to cater for the proposed development. INFRASTRUCTURE REPORT – Revision B (April 2023) 36 – 38 Duke Street, Sunshine Beach P a g e |9
Section 10
APPENDIX A MAX WATTERSON + ASSOCIATES: DETAIL AND CONTOUR PLAN INFRASTRUCTURE REPORT – Revision B (April 2023) 36 – 38 Duke Street, Sunshine Beach P a g e | 10
Section 11
6
.0
STORMWATER GRATE 17 Scale 1:200 - Lengths are in Metres
8
.0
SW STORMWATER MANHOLE 17
7
5
.0
.0 8
17
S SEWER MANHOLE 1717.1 2 0 2 4 6 8 10 12 14 16 18 20 22
EJ ELECTRICITY JUNCTION BOX
8
TELSTRA PIT .4
17 MAX WATTERSON
DENOTES GRAVEL
E
WM WATER METER 9
.4
17
N
H HYDRANT 8
.4 8 DENOTES CONCRETE
+ASSOCIATES
17 7.4 .61
A
1 17
STOP VALVE 04
7.
117
L
POWER POLE .6
9 DENOTES BUILDING CONSULTING SURVEYORS
9
.7
LIGHT POLE 17 7 & PLANNERS
7 .6
BENCH MARK .9 17 4 DENOTES BITUMEN
17 4 17 .9
S
.8 4
18
8 .6 16T 12 Maple Street
4
.9 17 7.8 .96 2 op
17 1 17 5 5 1. W
.7 PO Box 639
A
17 7 .6 6 99 al
l DENOTES PAVING
1 .6
4 17 Cooroy Qld 4563
.8
L
4 17
17
.1 Ph. (07) 54426121
18 8 DENOTES DAM/POOL
.8 Fax. (07) 54425125
3 7 16
.2 .0 5
18 9 .7 Email. [email protected]
8
18 .6 16
.3
7
UG
.8 17
18
7 0 DENOTES TREE
6
.2 17 .7
.2
2 8 17 7
.0
18
18 .39
.4 18 .9 16
18 18 1 9 45 2
.7 166.81
.4 6. 28 .9
17 1
2
1
2
16 116. .45 15
DO
.5
Stairs
.8
Client:
17
16 .99
3 1 5 32 33°
.5
88
9 Wattle 19
2 16
6
.6 . CP
.8
7
.3
17 16 .51 .1 00
.4
.0 00'
18
16
18
16 9 CAMBOOYA
4
16
1 .9 SP176872
5
2
.5
rs
15
i
87 '
.7
6
19
1 3°
8 2 16
ta
.2 7
18
3
S
.0 7 0 .5 .6 17 0 .3
.7 0 2 18 17 .0 15
PTY LTD
5
19 8.8.87 16
.4
1 8 18 8.7 .82 8.7
1
16
1 18 1 8 6
18 4 .7 .6 5 35
.6 15 15 .3 5.
.8
9 18 6 15 1 0 15
5 .7 5 .0 Project:
.7
6
17 .4
.7
18 9 6 90 15 9 3
18
.4 5 1 5. .79
Stairs
6 .9 4.9 .82
s
166.4 1 15 .7 14 1 14 2
1
7
air
18
4 15 .8
.7
3 .3
St
1 .5 5 0 8 3 21 DETAIL AND
15
.6 1
17 .4 .9 9 .3 4 .15 .2
199.5 52 15 5.315 15
1 9. 17 16 15 5.8
7 2 1
1 .8 4 1 .7 .5
19
2 2
18
.0 CONTOUR PLAN OF
5
15 0 .2 2
Dr
S 16 7 .5
15 .96
7
MH: 4 .7 14 4.2
.4
15
ive
1
9 .2 9 15 16 Single Storey 1 0
15
.2 3 .2
3
5
wa
LL:19.44 .54 16 6.0 3 9 .3
y
ps
.3 9.2
19 3 19 1 Building . LOTS 370 & 371 ON
e
14 4.20
.3 3 16
19
.6 15
15.75 1
St
15 .3
0
19 0 29 8
.9
.5 4 5 . .7 FFL 16 16.51
.7 .4 6 FFL
15
19 16 1 15 .80
16 16 6.2 .9 RP48111.
r
1 15
7
1 15
ve
.7 62
.8 16. 4
O
19 19.
16 38 .8 14
6
of
15
16
17
.9
15 .22
37
Ro
7
6. 8
.7
17
4 .7 4
.8
15
.0 1 .28
6
6
l
6 .8 15 .28 13 83
.3.52
al
16 .8 15 3. 9
0 16
1212
W
E 15 G 82 .0St 4 1 3.6
.8 1
op
25 av 3 5.
g
as 15 eps 13
.3 e 1
in
3T
1 15.59 .63
.8
nd
FFL 13
20
La
13 2.1
8
.7 69 St 4
.7
3° 87 15 15. ai
rs 12
2 0
00
.8 5 7
rs
' .5 .9
.863
15
ai
13
370 & 371 8 1122.
16
12
St
g
16 8 .2 4 6
in
13
.6 .6 13 3.2 14. .8
nd
4 15 Total 486m² 1 01 9 12
La
0 1 .0
.3 5 .3 13
15 5.2 13
1
e
13.04
dg
Two Storey LOCAL GOVT: NOOSA S.C.
2
Ri
7
.8
13.32 .9
of 0
15 7
1
Commercial Building
12
.2 .8 FFL 12
Ro9.9
5 14 1 LOCALITY: SUNSHINE BEACH
.3
15 13 Bin BM: Nail in Conc
3
.0 RL: 12.90
0'
13 92
. 1
2 12 gn .7
°0
15 .2 Si 12
3
CP 13.50 7 13 Plan 1 of 1
FFL .4 3 Scale: 1:200
.8 85
13
22 .088
LINETYPE LEGEND SP120994 12.87 12.
0
g
7 12 .7
in
.0 9 Date: 27-06-22
.4 3 8 12
nd
BANK BOTTOM 14 13 .2 .7 Datum: Assumed
La
8 13 .08 12
BANK TOP .0
14 St 13
BATTER ai Origin:
rs
8
CROWN .3
g
14 3 Ref:
in
GUTTER .4
14
nd
56 13 Cont.Int: 0.25m
5 3.
La
ET
GRAVEL .6 Section 12
1
8
13 1
.3
BITUMEN .2
22-5703AA
13
E
1 13
.7
KERB 13 1
.4
R
CONCRETE 14 13 NOTE:
.0
8 6
ELECTRICAL
T
E 14 .2 Sign 0
.0
6 8 13 .1
WATER .5 This plan has been prepared for building
13
13
13
S
1
DAM/POOL .2 5 design purposes only.
5
13 3 .2 2
.2
SEWER 3 Sign 1 .1
.5
13
4 13
.6 13 .37
DRAINAGE 13 3 Underground services not located except
13 4
.1 3.1
TREELINE 13 1 where evident on surface.
GARDEN
KE
TELSTRA
BUILDING 5
.6 9
PAVING 133.4 49
1 3.
1
DU
RETAINING WALL Sign
WALL
GUARDRAIL
FENCE
BDY
MAJOR CONTOUR MH: 3
.3
MINOR CONTOUR LL:13.73 13
S
[OCR of page images]
STORMWATER GRATE
STORMWATER MANHOLE
a©
SEWER MANHOLE
ELECTRICITY JUNCTION BOX
TELSTRA PIT
HYDRANT,
exag
LIGHT POLE
@ BENCH MARK
STOP VALVE
POWER POLE
WATER METER,
LINETYPE LEGEND.
BATTER
CROWN
GUTTER
GRAVEL
arTuMEN
KERB
ELECTRICAL
waTER
DAWPOOL
DRAINAGE
TREELINE
GARDEN
@ULDING
PAVING.
RETANNGWALL
WALL
GUARDRAIL
Fence
aoy
MINOR CONTOUR,
cP
SP120994
Scale 1:200 - Lengths are in Metres b
2 0 2 4 6 8 10 12 14 16 18 20 22
bey DENOTES GRAVEL
DENOTES CONCRETE
DENOTES BULONG N
DENOTES eITUMEN
DENOTES PAVING
DENOTES DAWPOOL
DENOTES TREE
1s PRBS RRS RE I RR SARA RID oe
IRPES RSE SS is
a Die ago e a oo ae sg
CS ss BSS ane a oe
BIO 979 *
Sesacessseeee AD Ce Sh o
KS ‘ QP AQ s cs
AEE OE Dea yO IK Os se J
EERO ITS RRS XY r ~ 4
SLES A DE ED MTV SSE OO Bo, oS ? >
RON NRE COS Ss CS
SSRIS SES RNA A
SSS oO wk “
iG Kis S Lee
RHR
OR HOH HOCH ROO IY
SEER ORR So
SRS Oe
nee
SASSI
Le
Be ESSER ARS SSE
ORES
: CO PSRSS Ss . 4
SO ESS RS
NSERC L
aN NRE
OR Ne e /
MAX WATTERSON
+ASSOCIATES
CONSULTING SURVEYORS
& PLANNERS
12 Maple Street
PO Box 639
Cooroy Qld 4563
Ph. (07) 54426121
54425125
Email [email protected]
Client:
CAMBOOYA
PTY LTD
Project:
DETAIL AND
CONTOUR PLAN OF
LOTS 370 & 371 ON
RP48111.
LOCAL GOVT: NOOSA S.C.
LOCALITY: SUNSHINE BEACH
Plan 1 of 1
Scale: 1:200
Datum: Assumed Date: 27-06-22
Origin
Ref:
22-5703AA
Contint: 0.25m
NOTE:
This plan has been prepared for building
design purposes only.
Underground services not located except
where evident on surface.
Section 13
APPENDIX B BLACKBURNE JACKSON: ARCHITECTURAL FLOOR PLANS INFRASTRUCTURE REPORT – Revision B (April 2023) 36 – 38 Duke Street, Sunshine Beach P a g e | 11
Section 14
" # $ % & " # $ % &
%" %" %" %" %" %" %" %" %" %"
6
6
% 0 6 ( - " 4 - " / &
% 0 6 ( - " 4 - " / &
3&%)"5$)*/%*$"5&41-"/5*/(
;0/&50#&-&445)"/N #0045&3
)*()/040-*%0#4536$5*0/4
61
3&'64&
7
#*,&Y
(3"5&%%3"*/
61
61
5"/,
065'-08
45"*3 45"*3
3
-*'5 -*'5
6
1
&95&/50'&/53:3".1
4)08/%"4)&%
3
#*,&
3
.&$)&9)"645%6$5
#*,&
3
#"$,*/(
-*'5$033*%03 ;0/&
#*,&
4*55*/(
16.1
&/53: 3
$0-% %3: '*-5&3
61
6"5
#*,&
.# .#
'*3&45"*3
#*,&
61
4503&:4
#*,&
13&1 4)3
".&/*5*&4 16.1 &/4 8$
'*-5&3
"15 "15
100-
"15
100-
30#&
4503&:4
13&1 $0-% #&% -%:
#*,&
4*55*/(
104
#"5)
5&/"/$: 5&33"$&
('"N
P
104
"3&"&9$-6%*/(,*5$)&/
"/%'00%4503"(&
N
1-"/5&3 "3&"&9$-6%&%'30.4*5&$07&3
"4"46/4)"%&
065%003%*/*/(
065%003#64*/&44"3&" 065%003#64*/&44"3&"
N N
"8/*/(#&-08
6
" # $ % & " # $ % &
%" %" %" %" %" %" %" %" %" %"
'-0031-"/%6,&453&&5 '-0031-"/-&7&-%06(-"4-"/&
%&7&-01.&/5"11307"- OPSUI
$".#00:"15:-5%
130104&%.*9&%64&%&7&-01.&/5 TDBMF !" !"
JTTVF EBUF
%6,&453&&5%06(-"4-"/& " 3 $ ) * 5 & $ 5 6 3 & ] - " / % 4 $ " 1 & ] * / 5 & 3 * 0 3 ] 1 3 0 + & $ 5 . " / " ( & . & / 5
%6,&453&&5 46/4)*/&#&"$) '-0031-"/4 %"
%VLF4U0QUJPOQMO5VFTEBZ .BSDIBN 5IFEFTJHOT ESBXJOHTBOETQFDJGJDBUJPOBSFDPQZSJHIUBOEBMXBZTSFNBJOUIFQSPQFSUZPG#MBDLCVSOF+BDLTPO%FTJHO1UZ-UE
(41VCMJTIFS7FSTJPO
[OCR of page images]
BOOSTER]
REFUSE]
~~
Bacrino
; BT ]MB2
tik. J “TIE
PREP. C = 3 ~
ats rf
saidfes HN
POS, aT
ra
rm
14 inn
re
_e"*| TENANCY MHA
etsieen" Po.
acer py it
esis rm
iin
Rvs rR PLANTER sees unc ronsnece
' ‘QUTDOOR DINING Trae 2
\ 1 aT
| ) a ase ATT
i I 1
a poet INN BELOW
+
& S| OS
01 FLOOR PLAN DUKE STREET
02 FLOOR PLAN LEVEL 1/ DOUGLAS LANE
12100 SSS ST08
scale: 1:100@A1 1.200 @A3
36 - 38 DUKE STREET, SUNSHINE BEACH DUKE STREET & DOUGLAS LANE cory mane.
FLOOR PLANS 7252-DA05
BLICKBUINEJ/CK(SON
ARCHITECTURE | LANDSCAPE | INTERIOR | PROJECT MANAGEMENT
PROPOSED MIXED USE DEVELOPMENT, CAMBOOYA PTY LTD DEVELOPMENT APPROVAL
Section 15
APPENDIX C JFP URBAN CONSULTANTS: SITE BASED STORMWATER MANAGEMENT PLAN INFRASTRUCTURE REPORT – Revision B (April 2023) 36 – 38 Duke Street, Sunshine Beach P a g e | 12
Section 16
SITE BASED STORMWATER
MANAGEMENT PLAN
Revision A
Proposed Development at
36 & 38 DUKE STREET, SUNSHINE BEACH
for
Cambooya Pty Ltd
Section 17
SITE BASED STORMWATER MANAGEMENT PLAN
Proposed Development at
36 & 38 DUKE STREET, SUNSHINE BEACH
for
Cambooya Pty Ltd
M3024E_DA1_SBSMP –Revision A
April 2023
JFP Urban Consultants Pty Ltd
Prepared by: C. Blair
Approved by: A. Fraser
Revision Date Details Prepared By Approved By
A 20/04/2023 For Authority Submission CB (RPEQ 19190) AF (RPEQ 5691)
SITE BASED STORMWATER MANAGEMENT PLAN – Revision A 36 & 38 DUKE STREET, SUNSHINE BEACH
Section 18
TABLE OF CONTENTS
INTRODUCTION ............................................................................................................................ 1
1.1 OBJECTIVE & SCOPE .......................................................................................................... 1
SITE CHARACTERISTICS ................................................................................................................ 2
2.1 LOCATION .......................................................................................................................... 2
2.2 TOPOGRAPHY & DRAINAGE .............................................................................................. 2
STORMWATER QUANTITY ............................................................................................................ 5
3.1 LAWFUL POINT OF DISCHARGE ........................................................................................ 5
3.2 STORMWATER DISCHARGE STRATEGY ............................................................................. 5
3.3 RATIONAL METHOD CALCULATION .................................................................................. 5
3.4 EXISTING SITE XP-STORM .................................................................................................. 6
3.4.1 CATCHMENT DATA ......................................................................................... 6
3.4.2 RAINFALL DATA ............................................................................................... 6
3.4.3 HYDROLOGICAL LOSSES .................................................................................. 6
3.4.4 BX FACTOR ...................................................................................................... 6
3.4.5 EXISTING PEAK DISCHARGE ............................................................................ 6
3.5 POST-DEVELOPMENT SITE XP-STORM .............................................................................. 7
3.5.1 CATCHMENT DATA ......................................................................................... 7
3.5.2 RAINFALL DATA, HYDROLOGICAL LOSSES & BX FACTOR ............................... 8
3.5.3 DETENTION TANK ........................................................................................... 8
3.5.4 POST-DEVELOPMENT PEAK DISCHARGE ........................................................ 8
3.5.5 DETENTION TANK RESULTS ............................................................................ 9
STORMWATER QUALITY............................................................................................................. 10
4.1 CONSTRUCTION PHASE STORMWATER QUALITY MANAGEMENT ................................ 10
4.1.1 INTRODUCTION............................................................................................. 10
4.1.2 POLLUTANTS ................................................................................................. 10
4.1.3 WATER QUALITY OBJECTIVES ....................................................................... 10
4.1.4 STORMWATER QUALITY MANAGEMENT STRATEGY ................................... 11
4.1.5 MONITORING & MAINTENANCE .................................................................. 11
4.1.6 RESPONSIBILITY & REPORTING ..................................................................... 11
4.2 OPERATIONAL PHASE STORMWATER QUALITY MANAGEMENT ................................... 12
4.3 WATERWAY STABILITY MANAGEMENT .......................................................................... 12
CONCLUSION & RECOMMENDATIONS ...................................................................................... 13
DISCLAIMER ............................................................................................................................... 14
APPENDICES ............................................................................................................................... 15
▪ Appendix A – Existing Site Survey & Proposed Site Plans
▪ Appendix B – Rational Method Calculation
▪ Appendix C – XP-STORM Summary
▪ Appendix D – Concept Stormwater Plans
SITE BASED STORMWATER MANAGEMENT PLAN – Revision A 36 & 38 DUKE STREET, SUNSHINE BEACH
Section 19
INTRODUCTION
JFP Urban Consultants Pty Ltd has been commissioned by Cambooya Pty Ltd to compile this Site Based
Stormwater Management Plan (SBSMP) for the proposed development at 36 & 38 Duke Street,
Sunshine Beach (‘the site’).
The site currently contains a restaurant located fronting Duke Street. It is understood that the proposal
is for a mixed-use development comprising the existing tenancy fronting Duke Street and five
residential apartments developed above. Refer to Appendix A for the survey of the existing site and for
the proposed development plans.
1.1 OBJECTIVE & SCOPE
The design objectives for this report are:
▪ Nominate the lawful point of discharge.
▪ Ensure post-development peak flow rates are mitigated back to the pre-development peak flow
rates via onsite detention.
▪ Confirm if the Water Quality Objectives (WQOs) in accordance with the State Planning Policy
(2017) is applicable for the site.
The scope of investigations undertaken for this report is as follows:
▪ Nominate lawful point of discharge.
▪ Undertake hydrological and hydraulic analysis for the site using the XP-STORM 1D. This analysis
includes the sizing of onsite detention to achieve peak flow mitigation.
▪ Provide commentary regarding possible performance-based stormwater quality management
strategies for the operational phase of the development.
Based on the outcomes of the above investigations, this report provides recommendations, including
concept drawings for stormwater management. These recommendations should be incorporated into
future detailed design and subsequent construction documentation.
SITE BASED STORMWATER MANAGEMENT PLAN – Revision A 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e |1
Section 20
SITE CHARACTERISTICS
2.1 LOCATION
The site is located in the Noosa Shire Council local government area. The site has real property
descriptions Lot 370 & 371 on RP48111 – more commonly known as 36 & 38 Duke Street, Sunshine
Beach.
The site has frontage to both Duke Street to the south and Douglas Lane to the north. The site currently
contains a restaurant located adjacent to Duke Street. Refer to Figure 1 for aerial view of the site.
The site is not identified to be affected by flooding or tidal influence.
Site
Figure 1 – Site Location (Source: Nearmap, August 2022)
2.2 TOPOGRAPHY & DRAINAGE
The site falls down toward Duke Street at approximately 10% - 15%. A site visit was undertaken on 26th
July 2022, and the following drainage patterns were observed.
▪ The existing site appears to discharge roofwater to Duke Street via two kerb adapters located on
left-hand side (LHS) and right-hand side (RHS) of the site. Refer to Figure 2 and Figure 3.
▪ No stormwater infrastructure was observed in the rear of the site, resulting in a majority of the
surface flows from the rear of the site running down the pathway at side of the existing building to
Duke Street. Refer to Figure 4.
SITE BASED STORMWATER MANAGEMENT PLAN – Revision A 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e |2
Section 21
Existing
restaurant
on site
Existing kerb
adapter, LHS
Figure 2 – Existing LHS Kerb Adapter
Existing kerb
adapter, RHS
Figure 3 – Existing RHS Kerb Adapter
SITE BASED STORMWATER MANAGEMENT PLAN – Revision A 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e |3
Section 22
Existing
building
Existing
pathway
Figure 4 – Rear of the Site, viewed from Douglas Lane
SITE BASED STORMWATER MANAGEMENT PLAN – Revision A 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e |4
Section 23
STORMWATER QUANTITY
3.1 LAWFUL POINT OF DISCHARGE
The lawful point of discharge for the site shall remain the existing kerb adapters discharging to Duke
Street – one on the LHS and one on the RHS of the site.
3.2 STORMWATER DISCHARGE STRATEGY
The fraction imperviousness increases due to the proposed development. The total peak discharge
rates from the site shall be maintained at or below the existing peak discharge rates for standard
storm events up to and including a 1% AEP. This is to be achieved via an aboveground tank, located on
Duke Street Ground Level. Refer to concept plans in Appendix D.
It is proposed to collect and convey a majority of the roofwater (5% AEP as per the QUDM 2016) to a
detention tank. Runoff from the driveway area adjacent to Douglas Lane is proposed to be collected
via pits and pipes sized for 1% AEP, and also conveyed to the detention tank. Mitigated outflows from
the detention tank are to be discharged on to Duke Street via the RHS kerb adapter.
A small catchment comprising of the planter area on Level 1 is proposed to discharge its stormwater
runoff directly to Duke Street via the LHS kerb adapter.
3.3 RATIONAL METHOD CALCULATION
The Rational Method Calculation has been undertaken for the existing site. Table 1 presents the
Rational Method catchment parameters. Refer to Drawings No. M3024E_DA1_SK01 in Appendix D for
the catchment plan. The fraction imperviousness has been estimated from the detailed survey
(included in Appendix A). The C10 has then been determined in accordance with Table 4.5.3 of the
QUDM (2016) and the time of concentration (Tc) based on the Standard Inlet Time in accordance with
Table 4.6.2 of the QUDM (2016).
Table 1 – Pre-Development Scenario Rational Method Calculation Parameters
Fraction
Catchment Area (ha) C10 Tc (mins)
Impervious
EX 0.0486 57% 0.82 8
The Rational Method peak flows have been estimated based on the parameters above and the site
specific 2016 rainfall intensities obtained from Bureau of Meteorology (BOM) website. Table 2
presents the Rational Method peak flow rates for the for the existing site.
Table 2 – Existing Site Total Peak Discharge – Rational Method Calculation
Existing Site Total Peak Discharge – Rational Method Calculation (m³/s)
63% AEP 39% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP
Existing
0.010 0.013 0.018 0.022 0.026 0.033 0.037
Site
SITE BASED STORMWATER MANAGEMENT PLAN – Revision A 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e |5
Section 24
3.4 EXISTING SITE XP-STORM
The peak flow analysis has been undertaken using the XP-STORM version 2021.3. The existing site was
represented by a single node. The existing site XP-STORM peak flow rates have been verified against
the Rational Method Calculation.
3.4.1 CATCHMENT DATA
Table 3 presents the catchment modelled in XP-STORM. Refer to Drawings No. M3024E_DA1_SK01 in
Appendix D for the catchment plan.
Table 3 – Existing Site Catchment Data
Fraction Vectored Slope
Catchment Area (ha)
Impervious (%)
EX 0.0486 57% 10%
3.4.2 RAINFALL DATA
The site specific 2016 rainfall intensities obtained from BOM coupled Australian Rainfall & Runoff (AR&R)
1987 temporal patterns for zone 3 have been used to generate peak flow hydrographs in XP-STORM.
3.4.3 HYDROLOGICAL LOSSES
The following initial loss, continuous loss and Manning’s n values have been adopted for the
hydrological modelling. The loss values adopted are within the ranges recommended in AR&R (1987)
for the South East Queensland.
Table 4 – Hydrological Losses
Continuing Loss
AEP Area Type Initial Loss (mm) Manning’s n
(mm/hr)
Impervious Area 0 0 0.014
63% to 1%
Pervious Area 15 2 0.07
3.4.4 BX FACTOR
A Bx factor of 1.8 has been used across all AEPs modelled.
3.4.5 EXISTING PEAK DISCHARGE
The XP-STORM hydrology was run for 63% AEP to 1% AEP storms with 15 to 180-minute standard
storm durations. The critical duration is determined to be the 25-minute storm for all AEPs modelled.
Table 5 presents the existing site total peak discharge rates and their comparison to the Rational
Method Calculation.
Table 5 – Existing Site Total Peak Discharge – XP-STORM
Existing Site Total Peak Discharge (m³/s)
63% AEP 39% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP
Rational
0.010 0.013 0.018 0.022 0.026 0.033 0.037
Method
XP-STORM 0.012 0.017 0.021 0.027 0.032 0.034 0.038
Variance +0.002 +0.004 +0.003 +0.005 +0.006 +0.001 +0.001
SITE BASED STORMWATER MANAGEMENT PLAN – Revision A 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e |6
Section 25
The results demonstrate that the XP-STORM peak flows are generally similar to the Rational Method
Calculation, particularly for the larger 1% and 2% AEP storms. On that basis, the XP-STORM peak flow
rates have been used for the peak flow and detention tank analysis for this site.
3.5 POST-DEVELOPMENT SITE XP-STORM
3.5.1 CATCHMENT DATA
Table 6 presents the post-development catchment details. Drawing No. M3024E_DA1_SK02 in
Appendix D presents the catchment delineation.
Table 6 – Post-Development Site Catchment Data
Fraction Vectored Slope
Catchment Area (ha)
Impervious (%)
D1 0.0304 100% 10%
D2 0.0119 63% 10%
D3 0.0019 100% 10%
D4 0.0044 100% 10%
Total 0.0486 91% 10%
The following catchment flow conditions are proposed:
▪ Peak flows up to and including 5% AEP to be collected from catchment D1 and conveyed to the
detention tank. Larger flows will overflow the roof gutters and travel down to Duke Street as
surface runoff, bypassing detention.
▪ Peak flows up to and including 1% AEP to be collected from catchment D2 and conveyed to the
detention tank.
▪ Catchment D3 bypasses detention. Peak flows up to and including 5% AEP are to be collected and
conveyed directly to RHS kerb adapter. Larger flows will overflow the roof gutters and travel down
to Duke Street as surface runoff.
▪ Catchment D4 also bypasses detention. Peak flows up to and including 5% AEP to be collected and
conveyed directly to LHS kerb adapter. Larger flows will overflow the roof gutters and travel down
to Duke Street as surface runoff.
Figure 5 presents the XP-STORM links and nodes set up for the post-development site.
Figure 5 – Post-Development XP-STORM Layout
SITE BASED STORMWATER MANAGEMENT PLAN – Revision A 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e |7
Section 26
3.5.2 RAINFALL DATA, HYDROLOGICAL LOSSES & BX FACTOR
As per the pre-development scenario.
3.5.3 DETENTION TANK
Table 7 presents the detention tank parameters modelled. Refer to Appendix C for the stage-area
relationship modelled. Re-analysis will be required if the stage-area relationship is significantly altered.
Table 7 – Detention Tank Details
Parameter Value
Detention Tank Dimensions (m) 1m wide x 2.1m long x 2.4m deep (min)
1% AEP Detention Volume (m³) 5.1
1% AEP Detention Depth (m) 2.4
Detention Tank IL (m AHD) 13.50
Orifice Outlet 100mm dia at IL 13.5m AHD
Weir Outlet 250mm weir at RL 15.80m AHD
3.5.4 POST-DEVELOPMENT PEAK DISCHARGE
The XP-STORM was run for 63% AEP to 1% AEP storms with 15 to 180-minute standard storm
durations. Table 8 presents the peak discharge rates from the site.
Table 8 – Post-Development Site Total Discharge – XP-STORM
Site Peak Discharge (m³/s)
63% AEP 39% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP
XP-STORM Post
Dev Discharge to 0.001 0.002 0.002 0.003 0.003 0.003 0.003
LHS Kerb Adapter
XP-STORM Post
Dev Discharge to 0.010 0.013 0.014 0.015 0.025 0.030 0.034
RHS Kerb Adapter
XP-STORM
Post-Dev. Site 0.012 0.014 0.016 0.017 0.027 0.033 0.038
Total
XP-STORM
Existing Site 0.012 0.017 0.021 0.027 0.032 0.034 0.038
Total
Variance 0 -0.003 -0.005 -0.010 -0.005 -0.001 0
The results show that peak flow mitigation is achieved for all AEP storm events.
SITE BASED STORMWATER MANAGEMENT PLAN – Revision A 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e |8
Section 27
3.5.5 DETENTION TANK RESULTS
Table 9 presents the detention tank performance.
Table 9 – Detention Tank Results
Detention Tank Results
63% AEP 39% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP
Tank Inflow
0.016 0.019 0.027 0.030 0.029 0.034 0.037
(m³/s)
Tank Outflow
0.010 0.012 0.013 0.013 0.015 0.015 0.015
(m³/s)
Detention
3.1 4.3 4.7 4.9 5.0 5.0 5.1
Volume (m³)
Depth of
1.4 2.1 2.2 2.3 2.4 2.4 2.4
Water (m)
SITE BASED STORMWATER MANAGEMENT PLAN – Revision A 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e |9
Section 28
STORMWATER QUALITY
4.1 CONSTRUCTION PHASE STORMWATER QUALITY MANAGEMENT
4.1.1 INTRODUCTION
This section provides conceptual stormwater quality management strategies for construction phase.
These strategies are applicable for all stages of the development. No modelling has been undertaken
for the construction phase stormwater quality management. Detailed Erosion and Sediment Control
Plans will be prepared during detailed design phase and implemented during construction.
4.1.2 POLLUTANTS
Typical pollutants generated during the construction phase of an urban development are shown in
Table 10. These based on Table C4.1 BCC’s Subdivision & Development Guidelines Part C Section 4.1.1
(2008).
Table 10 – Construction Phase Pollutants
Pollutant Potential Source
Litter Paper, construction packaging, food packaging, cement bags, off-cuts.
Sediment Unprotected exposed soils and stockpiles during earthworks and building works.
Hydrocarbons Fuel/oil spills, leaks from construction equipment, and temporary car park areas.
Toxic
Cement Slurry, asphalt primer, solvents, cleaning agents, and washwaters etc.
Materials
pH altering
Cement slurry, acid sulfate soils, and washwaters
substances
4.1.3 WATER QUALITY OBJECTIVES
It is recommended that the amount of runoff crossing and leaving the site is kept to a minimum during
the construction phase to restrict soil erosion and mobilisation of sediments and pollutants through
and off the site. Table 11 presents an extract from Table A, Appendix 2 of the State Planning Policy
(2017) objectives for construction phase stormwater quality management
Table 11 – Construction Phase Performance Criteria
Issue Desired Outcomes
1. Stage clearing and construction works to minimise the area of exposed soil
at any one time.
2. Effectively cover or stabilise exposed soils prior to predicted rainfall.
Erosion control
3. Prior to completion of works for the development, and prior to removal of
sediment controls, all site surfaces must be effectively stabilised using
methods which will achieve effective short-term stabilisation.
1. Direct runoff from exposed site soils to sediment controls that are
appropriate to the extent of disturbance and level of erosion risk.
2. All exposed areas greater than 2500m² must be provided with sediment
Sediment
controls which are designed, implemented and maintained to a standard
Control
which would achieve at least 80% of the average annual runoff volume of
the contributing catchment treated (i.e. 80% hydrological effectiveness) to
50mg/L Total Suspended Solids (TSS) or less, and pH in the range (6.5–8.5).
SITE BASED STORMWATER MANAGEMENT PLAN – Revision A 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e | 10
Section 29
4.1.4 STORMWATER QUALITY MANAGEMENT STRATEGY
An erosion and sediment control management plan that is endorsed by an CPESC or RPEQ will be
prepared and implemented during construction phase. Erosion and sediment control measures may
include, but not limited to, devices such as:
▪ catch drains,
▪ diversion drains,
▪ silt fences, and
▪ construction entry/exit pads.
4.1.5 MONITORING & MAINTENANCE
The general requirement of monitoring during the construction phase will be:
▪ Work activities to be restricted to designated construction areas.
▪ Earthworks and site clearing to be undertaken in accordance with the Erosion and Sediment
Control Plans prepared during detailed design phase.
▪ Erosion and sediment control devices to be constructed in accordance with the Erosion and
Sediment Control Plans prepared during detailed design phase.
▪ Inspect sediment fences and erosion and sediment control structures/devices on a weekly basis as
well as after any rain event exceeding 25mm in 24hrs.
▪ Stormwater discharges from the site are not to have any adverse effect on the downstream
environment.
▪ Monitor and record of the performance of the drainage control devices including water quality
testing where required.
▪ Any failure in the stormwater system to be immediately rectified to prevent uncontrolled
discharge from the site.
▪ Any failure to the stormwater system causing damage to surroundings should implement
immediate remedial work to the damaged area.
4.1.6 RESPONSIBILITY & REPORTING
▪ The contractor shall be responsible for monitoring the performance of all drainage control and
erosion and sediment control devices.
▪ Records of any failures to devices should be kept and reported to the Construction Manager.
▪ Regular inspections of the devices shall be reported to the Construction Manager.
▪ Inspections of the devices after heavy rainfall shall be reported to the Construction Manager.
SITE BASED STORMWATER MANAGEMENT PLAN – Revision A 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e | 11
Section 30
4.2 OPERATIONAL PHASE STORMWATER QUALITY MANAGEMENT
The development footprint is 486m² which is less than 2,500m². Therefore, the site does not trigger
compliance with the State Planning Policy (2017) for stormwater quality management and meeting the
required Water Quality Objectives (WQOs). The development is also not discharging into ‘High
Ecological Value’ waters. On that basis, no conventional stormwater improvement devices such as
bioretention are proposed and MUSIC modelling has not been undertaken for the site.
While no active stormwater treatment measures such as bioretention is proposed, the site will have
some passive stormwater quality treatment measures. For instance, the majority of the site is covered
by the building footprint and most of the building runoff is directed into a detention tank. Most of the
gross pollutants such as tree leaves and visible rubbish will be captured in the roof gutters. Smaller
gross pollutants and Suspended Solids that travel through the roof drainage system will enter the
detention tank where runoff will pond for a period of time allowing the pollutants to settle in to the
bottom of the bank. Periodic maintenance of the roof drainage system and the detention tank will
ensure most of the gross pollutants and Suspended Solids are captured within the site prior to
discharging into the downstream drainage network.
The landscaping proposed within the site will also provide water quality benefit to runoff that is
directed to them. The vegetation will capture primary pollutants and the soil underneath will provide
some level of nutrient treatment.
4.3 WATERWAY STABILITY MANAGEMENT
The waterway stability management in accordance with the State Planning Policy (2017) is not
applicable for this site, as the site flows are connected to an urban underground drainage network
which then discharges into tidal waters.
SITE BASED STORMWATER MANAGEMENT PLAN – Revision A 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e | 12
Section 31
CONCLUSION & RECOMMENDATIONS
JFP Urban Consultants Pty Ltd has prepared this Site Based Stormwater Management Plan for the
proposed development at 36 & 38 Duke Street, Sunshine Beach. The analyses presented in this report
achieve the following outcomes:
The outcomes of the stormwater analyses are:
▪ The proposed lawful point of discharge is the existing kerb adapters on Duke Street.
▪ On-site detention is proposed so that site’s post-development peak discharge rates do not exceed
the existing site’s peak discharge rates for standard storm events 63% AEP to 1% AEP. The 1% AEP
detention volume is 5.1m³ (1m wide x 2.1m long x 2.4m deep min. tank).
▪ Erosion & sediment control measures are to be finalised during detailed design and incorporated
in the construction phase.
▪ As the site area is less than 2500m² the development does not trigger the State Planning Policy
(2017) for operational phase stormwater quality management and therefore stormwater quality
treatment devices such as bioretention is not required. However, the site’s internal drainage
system and the landscaping areas will provide some level of stormwater quality treatment,
particularly for the gross pollutants and Suspended Solids.
It is recommended that the management strategies presented in this report are incorporated into
future detailed design and subsequent construction. While variations to the concepts are allowed, the
design objectives are to be maintained.
SITE BASED STORMWATER MANAGEMENT PLAN – Revision A 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e | 13
Section 32
DISCLAIMER
This report has been prepared for the purpose and exclusive use of Cambooya Pty Ltd as an
investigation into the stormwater management issues related for the proposed development of the
land described in the report. The information presented in this report is not to be used for any other
purpose or by any other person or corporation.
JFP Urban Consultants Pty Ltd accepts no responsibility for any loss or damage suffered howsoever
arising to any person or corporation who may use or rely on this report without further input and/or
advice from JFP Urban Consultants Pty Ltd.
The investigations, calculations, analysis and recommendations presented in this report rely on
information sourced from third-parties. JFP Urban Consultants Pty Ltd accepts no responsibility for the
accuracy of the information sourced from third-parties.
SITE BASED STORMWATER MANAGEMENT PLAN – Revision A 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e | 14
Section 33
APPENDICES
▪ Appendix A – Existing Site Survey & Proposed Site Plans
▪ Appendix B – Rational Method Calculation
▪ Appendix C – XP-STORM Summary
▪ Appendix D – Concept Stormwater Plans
SITE BASED STORMWATER MANAGEMENT PLAN – Revision A 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e | 15
Section 34
APPENDIX A – EXISTING SITE SURVEY & PROPOSED SITE PLANS SITE BASED STORMWATER MANAGEMENT PLAN – Revision A 36 & 38 DUKE STREET, SUNSHINE BEACH
The text continues on section 35.
Used in these records
About this file
- File size
- 11.8 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.