Skip to the record
Noosa’s premier civic archive.

Council archive · source document

Appendix C - Infrastructure Services Report · MCU23/0070

of 51

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 29, section 1. The text section number identifies this passage in the reader.

4.2      OPERATIONAL PHASE STORMWATER QUALITY MANAGEMENT
The development footprint is 486m² which is less than 2,500m². Therefore, the site does not trigger
compliance with the State Planning Policy (2017) for stormwater quality management and meeting the
required Water Quality Objectives (WQOs). The development is also not discharging into ‘High
Ecological Value’ waters. On that basis, no conventional stormwater improvement devices such as
bioretention are proposed and MUSIC modelling has not been undertaken for the site.

While no active stormwater treatment measures such as bioretention is proposed, the site will have
some passive stormwater quality treatment measures. For instance, the majority of the site is covered
by the building footprint and most of the building runoff is directed into a detention tank. Most of the
gross pollutants such as tree leaves and visible rubbish will be captured in the roof gutters. Smaller
gross pollutants and Suspended Solids that travel through the roof drainage system will enter the
detention tank where runoff will pond for a period of time allowing the pollutants to settle in to the
bottom of the bank. Periodic maintenance of the roof drainage system and the detention tank will
ensure most of the gross pollutants and Suspended Solids are captured within the site prior to
discharging into the downstream drainage network.

The landscaping proposed within the site will also provide water quality benefit to runoff that is
directed to them. The vegetation will capture primary pollutants and the soil underneath will provide
some level of nutrient treatment.


4.3      WATERWAY STABILITY MANAGEMENT
The waterway stability management in accordance with the State Planning Policy (2017) is not
applicable for this site, as the site flows are connected to an urban underground drainage network
which then discharges into tidal waters.




SITE BASED STORMWATER MANAGEMENT PLAN – Revision A                       36 & 38 DUKE STREET, SUNSHINE BEACH
                                                     P a g e | 12

Used in these records

About this file

File size
11.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix C - Infrastructure Services Report.pdf · 11.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.