Appendix C - Infrastructure Services Report · MCU23/0070
Very large file (11.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 38, section 1. The text section number identifies this passage in the reader.
APPENDIX B – RATIONAL METHOD CALCULATION M3024 36-38 Duke Street, Sunshine Beach Catchment Details EXISTING SITE PROPOSED SITE Area (ha) 0.0486 0.0486 Impervious Area (ha) 0.0277 0.044 Fraction Impervious (%) 57% 91% 1 I60 (mm/hr) 75.2 75.2 C1 0.656 0.70 C2 0.70 0.75 C5 0.78 0.84 C10 0.82 0.88 C20 0.86 0.92 C50 0.94 1.00 C100 0.98 1.00 Time of Concentration (min) Method Tc Catchment EXISTING SITE Standard inlet time, catchment slope ~14% 8 PROPOSED SITE Standard inlet time, mostly paved/impervious areas 5 Rainfall Intensities (mm/hr) Catchment 1yr ARI 2yr ARI 5yr ARI 10yr ARI 20yr ARI 50yr ARI 100yr ARI EXISTING SITE 111 139 168 196 223 257 282 PROPOSED SITE 125 158 193 227 259 301 333 Stormwater Quantities (m3/s) Catchment 1yr ARI 2yr ARI 5yr ARI 10yr ARI 20yr ARI 50yr ARI 100yr ARI EXISTING SITE 0.010 0.013 0.018 0.022 0.026 0.033 0.037 PROPOSED SITE 0.012 0.016 0.022 0.027 0.032 0.041 0.045 SITE BASED STORMWATER MANAGEMENT PLAN – Revision A 36 & 38 DUKE STREET, SUNSHINE BEACH
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix C - Infrastructure Services Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 11.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.