Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Appendix C - Infrastructure Services Report · MCU23/0070

of 51

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 40, section 1. The text section number identifies this passage in the reader.

DETENTION TANK STAGE-AREA-VOLUME

     RL (m AHD)         Height (m)          Area (m²)   Area (ha)   Incremental Vol (m³)   Accum. Vol (m³)
        13.50              0.00               2.10       0.00021             0                  0.0
        13.60              0.10               2.10       0.00021           0.210                0.2
        13.70              0.20               2.10       0.00021           0.210                0.4
        13.80              0.30               2.10       0.00021           0.210                0.6
        13.90              0.40               2.10       0.00021           0.210                0.8
        14.00              0.50               2.10       0.00021           0.210                1.1
        14.10              0.60               2.10       0.00021           0.210                1.3
        14.20              0.70               2.10       0.00021           0.210                1.5
        14.30              0.80               2.10       0.00021           0.210                1.7
        14.40              0.90               2.10       0.00021           0.210                1.9
        14.50              1.00               2.10       0.00021           0.210                2.1
        14.60              1.10               2.10       0.00021           0.210                2.3
        14.70              1.20               2.10       0.00021           0.210                2.5
        14.80              1.30               2.10       0.00021           0.210                2.7
        14.90              1.40               2.10       0.00021           0.210                2.9
        15.00              1.50               2.10       0.00021           0.210                3.1
        15.10              1.60               2.10       0.00021           0.210                3.4
        15.20              1.70               2.10       0.00021           0.210                3.6
        15.30              1.80               2.10       0.00021           0.210                3.8
        15.40              1.90               2.10       0.00021           0.210                4.0
        15.50              2.00               2.10       0.00021           0.210                4.2
        15.60              2.10               2.10       0.00021           0.210                4.4
        15.70              2.20               2.10       0.00021           0.210                4.6
        15.80              2.30               2.10       0.00021           0.210                4.8
        15.90              2.40               2.10       0.00021           0.210                5.0
        16.00              2.50               2.10       0.00021           0.210                5.2
        16.10              2.60               2.10       0.00021           0.210                5.5
        16.20              2.70               2.10       0.00021           0.210                5.7
        16.30              2.80               2.10       0.00021           0.210                5.9
        16.40              2.90               2.10       0.00021           0.210                6.1
        16.50              3.00               2.10       0.00021           0.210                6.3




SITE BASED STORMWATER MANAGEMENT PLAN – Revision A                     36 & 38 DUKE STREET, SUNSHINE BEACH


[OCR of page images]
JFP_ URBAN CONSULTANTS

 

 

= JFOP

ANCONSULTANTS

   

DETENTION TANK STAGE-AREA-VOLUME

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RL (m AHD) Height (m) Area (m?) Area (ha) Incremental Vol (m?) Pca MAY) A ie)
2.10 0.00021 0 0.0
2.10 0.00021 0.210 0.2
2.10 0.00021 0.210 0.4
2.10 0.00021 0.210 0.6
2.10 0.00021 0.210 0.8
2.10 0.00021 0.210 piel
2.10 0.00021 0.210 133
2.10 0.00021 0.210 ses
2.10 0.00021 0.210 iL?
2.10 0.00021 0.210 eS)
2.10 0.00021 0.210 eal
2.10 0.00021 0.210 283
2.10 0.00021 0.210 25)
2.10 0.00021 0.210 2a,
2.10 0.00021 0.210 28)
2.10 0.00021 0.210 3.1
2.10 0.00021 0.210 3.4
2.10 0.00021 0.210 3.6
2.10 0.00021 0.210 3.8
2.10 0.00021 0.210 4.0
2.10 0.00021 0.210 4.2
2.10 0.00021 0.210 44
2.10 0.00021 0.210 4.6
2.10 0.00021 0.210 48
2.10 0.00021 0.210 5.0
2.10 0.00021 0.210 5.2
2.10 0.00021 0.210 5.5
2.10 0.00021 0.210 5.7
2.10 0.00021 0.210 5.9
2.10 0.00021 0.210 6.1
2.10 0.00021 0.210 6.3

 

 

SITE BASED STORMWATER MANAGEMENT PLAN ~ Revision A 36 & 38 DUKE STREET, SUNSHINE BEACH

Used in these records

About this file

File size
11.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix C - Infrastructure Services Report.pdf · 11.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.