Council archive · source document
Appendix C - Infrastructure Services Report · MCU23/0070
Very large file (11.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 8, section 1. The text section number identifies this passage in the reader.
STORMWATER & WATER QUALITY
MANAGEMENT
4.1 STORMWATER MANAGEMENT
Refer to JFP Urban Consultants Site Based Stormwater Management Plan (hydraulic assessment)
attached in Appendix C of this report for details.
Post development flows will be retarded back to pre‐development levels via an internal detention
tank. Stormwater discharge will be via connection to existing / additional kerb adaptors in Duke Street.
Stormwater runoff from the new development will be directed to Council’s existing drainage system to
avoid any adverse impacts on adjoining properties or the Duke Street road reserve.
Stormwater drainage design will be carried out in accordance with Council’s relevant planning scheme
policy and QUDM.
4.2 WATER QUALITY MANAGEMENT
Refer to JFP Urban Consultants Site Based Stormwater Management Plan (water quality advice)
attached in Appendix C of this report for details.
INFRASTRUCTURE REPORT – Revision B (April 2023) 36 – 38 Duke Street, Sunshine Beach P a g e |8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix C - Infrastructure Services Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 11.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.