Original source · versioned page text
Amended Planning Report
the bank of a watercourse and
10m from the top of the bank of a
drainage line;
OR
S5.5 For Forestry uses the
cultivated area is separated
from watercourses by a distance
not less than the distances
identified below, measured from
high water mark or the top of the
bank, whichever is the greater
distance—
Feature
Distance
Stream order 1 or 2
5m
Stream order 3 or 4
10 m
Stream order greater than 4
20 m
AND
S5.6 Where Forestry is carried
out on that
part of premises indicated as
Riparian Buffer Area and
outside the separation
distances
24 | P a g e
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.