Original source · versioned page text
Amended Planning Report
replacement vegetation of vegetation;
local origin.
d) creating or enhancing
linkages between
existing habitats;
e) avoiding the use of
undesirable plant species
listed in Table 9.1 of
PSP3 Landscaping
Plants and Guidelines;
and
f) planting riparian zones to
filter stormwater run-off
and provide for wildlife
habitat;
AND
S16.2 Vegetation removed is No proposed vegetation
replaced with— removal
a) plantings of equivalent
area that replicate the
floristic structure of the
vegetation removed; or
b) where this is not possible
due to the characteristics
of the site and the
development, plantings
twice the number of the
removed trees and plants
of local origin.
Fire management Not located within bushfire
O17 Fire management measures No solution provided overlay mapping. No clearing
are adopted based on ecological for firebreak purposes
principles, which— required.
a) maintain and enhance
biodiversity;
b) minimise threat of fire to
the natural environment,
life and property; and
c) provide for effective use and
maintenance of buildings and
structures.
29 | P a g e
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.