Council archive · source document
Decision Notice OPW13-1028 · OPW13/1028
Officer: Mark Lewis Direct Telephone: 07 5329 6290 Fax: 07 5329 6501 Our Reference: OPW13/1028 Your Reference: n/a 30 January 2014 Javaka Pty Ltd PO Box 1551 NOOSA HEADS QLD 4567 Dear Sir/Madam Decision Notice Sustainable Planning Act 2009 I refer to your application and advise that on 28 January 2014, Council decided to approve the application in full subject to conditions. Details of the decision are as follows: application details Application No: OPW13/1028 Street Address: 43 Elizabeth St NOOSAVILLE QLD 4566 Real Property Description: Lot 40 SP 233478 Planning Scheme: The Noosa Plan (16 September 2013) Decision details The following type of approval has been issued: Development Permit for Operational Work (Engineering Works - Roadworks, Stormwater, Drainage Works, Earthworks & Landscaping) Relevant period of approval The relevant period for this development approval is 2 years starting the day that this development approval takes effect. assessment manager conditions Prior to Commencement of Works A prestart meeting must be organised with council’s delegate by calling 5329 6547 (giving at least five business days notice). The prestart meeting must be attended by the responsible persons for: Civil engineering works Erosion and sediment control works Landscape Works A condition report including photographs of the frontage of the site must be completed and submitted to council at the prestart meeting. A Construction Management Plan must be submitted to council prior to the prestart meeting and must specifically address the following: Traffic management during all aspects of the construct phase including: A Traffic Management Control Plan in accordance with Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction. Maintenance of safe pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased. Proposed fencing to the site during the construction phase of the development. Maintenance and protection of water quality and existing drainage lines through the construction site through the implementation of appropriate erosion and sediment control measures. Details on the location of external fill sites/sources, the haulage route, type of vehicle to be utilised during filling operations and frequency of usage. NOTE: any damage to the existing road system as a result of haulage operations must be fully repaired at the applicant’s expense. Any changes to the details associated with the supervising RPEQ or Principal Contractor during construction, must be notified to council in writing within five business days of the change occurring. Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works. During Construction Where damage occurs to any council asset as a result of the development works, it must be repaired immediately where it creates a hazard that presents risk to person or property. Other damage must be repaired prior to completion of works. All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ) who is independent of the Developer and Principal Contractor, and they must certify that all works conform to the Operational Works approval. Where municipal works are involved, such confirmation must be submitted for the respective hold points prior to any site inspection by council officers. All works must be constructed and work procedure undertaken in accordance with: (a) The approved plans/documents and conditions detailed in this Decision Notice. (b) The relevant conditions of the higher order Material Change of Use approval viz. MCU13/0199 to which this approval relates. (c) All relevant council Planning Scheme Policies, standard drawings, standard specifications and guidelines. (d) The latest version of Water Sensitive Urban Design Technical Design Guidelines for South East Queensland (Healthy Waterways) for all water quality devices to be constructed on site. Pavement Design and Construction Pavement design for privately owned works must be undertaken in accordance with the relevant standards. Structural integrity of the driveway and car park areas will remain the responsibility of the property owner/developer and must be certified by an RPEQ. Works within Road Reserve Safe pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with. All frontage works must match neatly with existing road and verge/footpath features. Additional works beyond the frontage may be required to provide an acceptable transition to existing road and verge/footpath profiles. Electrical conduits or other services proposed to be installed under existing sealed carriageways, concrete pathways or concrete/sealed driveways must be installed by boring. Trenching is not permitted, unless specifically approved by council. Pathways and Access Points All pathways must be constructed in accordance with the following requirements: (a) All footpath/cycleway must comply with council’s Standard Drawing SEQ R-065 (b) All paths must have a slip resistant surface. (c) Expansion and contraction joints must provide a flush finish. Installation of joints by saw cutting is preferred to ensure a smooth ride for cyclists. (d) The required work includes any modifications to ensure the footpath finishes flush with all existing service covers and the like, or alternatively these services are raised or altered, so as not to create a pedestrian safety hazard. Pathways must: (a) Terminate in a manner that ensures smooth transition to existing surfaces for public safety. (b) Be designed and constructed to comply with the Disability Discrimination Act (DDA), Access to Premises Standard, Austroads and relevant sections of AS 1428, Design for access and mobility. Site Access and Driveways Driveway crossovers must be constructed in accordance with council’s Standard Drawing SEQ R-051 Any existing unnecessary or redundant property access must be removed, and the kerb, footpath and verge area reinstated to match the existing footpath and/or verge treatments. Grassed verge areas to be reinstated must be provided with 100mm topsoil and grass seed or turf, and must be maintained by the developer until established. Stormwater Drainage Construction of all internal stormwater drainage works must comply with the relevant section/s of Australian Standard AS/NZS 3500.3.2:1998. Earthworks and Retaining Walls All earthworks shall be undertaken in accordance with the provisions of AS 3798, Guidelines on earthworks for commercial and residential development, with geotechnical testing undertaken in accordance with Section 8 of the Standard, and to a minimum of ‘Level 1’ as defined in Appendix B. Test results as required by AS 3798, and a certificate of quality and uniformity of fill, shall be provided by a RPEQ and submitted to council prior to the commencement of the use Landscaping Works Prior to felling or pruning, all trees are to be inspected for wildlife (i.e. koalas, possums, birds nests etc). If wildlife is present, the tree must not be felled or pruned until the wildlife has left the tree or has been removed by a qualified fauna spotter/catcher Vegetation removal or pruning must be undertaken in a manner that avoids damaging surrounding vegetation and habitat Landscape works must be supervised by suitably qualified persons. All works must be completed in accordance with this Decision Notice and the approved landscaping plan, except where amended by conditions herein Landscape works must: (a) Delineate all planting to grassed area interfaces with timber edge. (b) Ensure amenity or sales signage and ancillary infrastructure is not being installed within the road reserve. (c) Ensure permanent irrigation is not installed within the road reserve. (d) Ensure mulch is aged, comprised of leaf and limb material of varying sizes, free of foreign matter including anthropogenic waste, rock, soil/sediment contamination and is applied to all planting areas to ensure a minimum 100mm depth once settled Street trees must be: (a) Compliant with Specifying Trees – a guide to assessment of tree quality (NATSPEC). (b) Located in accordance with engineering requirements for safe vehicle and pedestrian sight lines. (c) Located from services and infrastructure a minimum of: (i) 6m from electricity poles and pillars. (ii) 4m from street lighting. (iii) 2m from stormwater catchment pits (iv) 2m from any adjoining driveway Turfed areas must be must be free of pest, diseases and weeds and level with adjoining surfaces All landscape works must be established and maintained in accordance with horticultural best practice with construction techniques and irrigation that allow for healthy, sustained and vigorous plant growth. All plant material must be allowed to grow to full form and be refurbished when its life expectancy is reached All landscape works must be maintained generally in accordance with the approved design for the life of the development A minimum of 2 x 45 litre native street trees must be established along the frontage within the road reserve (recommend edible fruit tree variety) in accordance with MCU conditions Any front boundary fencing must not exceed 1.8 m in height in accordance with MCU conditions Erosion and Sediment Control Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination. Erosion and sediment control measures must be installed and maintained to minimise erosion on the site and to minimise the export of sediment and associated pollutants from the site. The erosion and sediment control measures must be designed, installed and maintained in accordance with current best practice standards Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: (a) where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or (b) where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. As Constructed Plans Prior to acceptance of civil works to become Council assets “On Maintenance”, the lodgement of satisfactory “As Constructed” records must be submitted to Council. The “As Constructed” information must include: (a) Drawings and data certified by a qualified experienced Civil Engineer (RPEQ) for design intent, and certified by a Licensed Surveyor in regard to the cadastre and the location, level and type of all services and structures. (b) The data must be in accordance with Council’s (Noosa Plan) – Planning Scheme Policy 5 – Engineering Design Standards – Roads, Drainage and Earthworks, and Planning Scheme Policy 6 Engineering Design Standards – Water and Sewerage and fully detail levels for all engineering works including but not limited to drainage structures, finished ground levels and pavement surface levels. (c) The data must be submitted in hardcopy form and digital format (Asset Design and As Constructed (ADAC)) in GDA94 Zone 56 coordinate values. Guidelines on the use of ADAC are available at www.adac.com.au Off Maintenance Prior to requesting an Off Maintenance inspection the developer must provide a written request for the Off Maintenance inspection. A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged where: (a) a Council inspection reveals works do not comply with approval requirements (b) submitted certification falsely states works comply with approval requirements. referral agencies Not Applicable. approved plans The following plans are Approved Plans for the development: Approved Plans Plan No. Rev. Plan Name Date 23299-OW2 A Operational Works, prepared by SCG Consulting Engineers December 2013 23299-OW3 Operational Works Details, prepared by SCG Consulting Engineers November 2013 23299-OW4 Roof Stormwater Plan, prepared by SCG Consulting Engineers November 2013 23299-OW5 Driveway Longitudinal Section, prepared by SCG Consulting Engineers November 2013 1376WD20 Landscape Plan, prepared by Thomas Walsh Yardart Pty Ltd November 2013 referenced documents Not Applicable. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: General Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Sustainable Planning Act 2009 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. Prestart, On and Off Maintenance Inspections Request Contact Council on 5329 6244 to arrange a prestart or an inspection giving a minimum of 5 business days notice of preferred inspection time. If Council officers are required to undertake additional inspections of the same works, a reinspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time. A minimum maintenance period of 12 months will apply to all municipal works and thereafter until such time as the works are performing in accordance with the approved design unless notifies otherwise Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003. The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage.” It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Co-ordination Unit on 07 3239 3647 to discuss any obligations under the ACH Act. property notes Not Applicable preliminary approval overriding planning scheme Not Applicable further development permits required Not Applicable. self assessable codes Not Applicable submissions Not Applicable reasons/grounds for approval Not Applicable RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice” may be given. Taking this step will defer your appeal period, which will commence again from the start the day after you receive a “negotiated decision notice”. (Refer to Part 8 “Dealing with decision notices and approvals” - Division 1 “Changing decision notices and approvals during applicant’s appeal period” of the Sustainable Planning Act 2009.) OTHER DETAILS If you wish to obtain more information about Council’s decision, electronic copies are available on line at www.noosa.qld.gov.au, or at Council Offices. Yours faithfully mark lewis senior engineering officer Enc: Approved Plans/Documents Appeal Rights cc Unitywater Appeal Rights SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING REGULATION 2009 The following is an extract from the Sustainable Planning Act 2009 (Chapter 7). MATERIAL CHANGE OF USE, RECONFIGURING A LOT & OPERATIONAL WORKS Division 8 Appeals to court relating to development applications and approvals 461 Appeals by applicants (1) An applicant for a development application may appeal to the court against any of the following— (a) the refusal, or the refusal in part, of the development application; (b) any condition of a development approval, another matter stated in a development approval and the identification or inclusion of a code under section 242; (c) the decision to give a preliminary approval when a development permit was applied for; (d) the length of a period mentioned in section 341; (e) a deemed refusal of the development application. (2) An appeal under subsection (1)(a), (b), (c) or (d) must be started within 20 business days (the applicant’s appeal period) after— (a) if a decision notice or negotiated decision notice is given—the day the decision notice or negotiated decision notice is given to the applicant; or (b) otherwise—the day a decision notice was required to be given to the applicant. (3) An appeal under subsection (1)(e) may be started at any time after the last day a decision on the matter should have been made. 462 Appeals by submitters—general (1) A submitter for a development application may appeal to the court only against— (a) the part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) the part of the approval relating to the assessment manager’s decision under section 327. (2) To the extent an appeal may be made under subsection (1), the appeal may be against 1 or more of the following— (a) the giving of a development approval; (b) any provision of the approval including— (i) a condition of, or lack of condition for, the approval; or (ii) the length of a period mentioned in section 341 for the approval. (3) However, a submitter may not appeal if the submitter— (a) withdraws the submission before the application is decided; or (b) has given the assessment manager a notice under section 339(1)(b)(ii). (4) The appeal must be started within 20 business days (the submitter’s appeal period) after the decision notice or negotiated decision notice is given to the submitter. 463 Additional and extended appeal rights for submitters for particular development applications (1) This section applies to a development application to which chapter 9, part 7 applies. (2) A submitter of a properly made submission for the application may appeal to the court about a referral agency’s response made by a prescribed concurrence agency for the application. (3) However, the submitter may only appeal against a referral agency’s response to the extent it relates to— (a) if the prescribed concurrence agency is the chief executive (environment)—development for an aquacultural ERA; or (b) if the prescribed concurrence agency is the chief executive (fisheries)—development that is— (i) a material change of use of premises for aquaculture; or (ii) operational work that is the removal, damage or destruction of a marine plant. (4) Despite section 462(1), the submitter may appeal against the following matters for the application even if the matters relate to code assessment— (a) a decision about a matter mentioned in section 462(2) if it is a decision of the chief executive (fisheries); (b) a referral agency’s response mentioned in subsection (2). 464 Appeals by advice agency submitters (1) Subsection (2) applies if an advice agency, in its response for an application, told the assessment manager to treat the response as a properly made submission. (2) The advice agency may, within the limits of its jurisdiction, appeal to the court about— (a) any part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) any part of the approval relating to the assessment manager’s decision under section 327. (3) The appeal must be started within 20 business days after the day the decision notice or negotiated decision notice is given to the advice agency as a submitter. (4) However, if the advice agency has given the assessment manager a notice under section 339(1)(b)(ii), the advice agency may not appeal the decision. 465 Appeals about decisions relating to extensions for approvals (1) For a development approval given for a development application, a person to whom a notice is given under section 389, other than a notice for a decision under section 386(2), may appeal to the court against the decision in the notice. (2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person. (3) Also, a person who has made a request under section 383 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. 466 Appeals about decisions relating to permissible changes (1) For a development approval given for a development application, the following persons may appeal to the court against a decision on a request to make a permissible change to the approval— (a) if the responsible entity for making the change is the assessment manager for the application— (i) the person who made the request; or (ii) an entity that gave a notice under section 373 or a pre-request response notice about the request; (b) if the responsible entity for making the change is a concurrence agency for the application—the person who made the request. (2) The appeal must be started within 20 business days after the day the person is given notice of the decision on the request under section 376. (3) Also, a person who has made a request under section 369 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. 467 Appeals about changing or cancelling conditions imposed by assessment manager or concurrence agency (1) A person to whom a notice under section 378(9)(b) giving a decision to change or cancel a condition of a development approval has been given may appeal to the court against the decision in the notice. (2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person. [word/footer1.xml] Page 10 of 10 [word/footer2.xml] Page 1 of 10 [word/header1.xml] OPW13/1028 [Attachment: image2.png (image text)] a mm NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice OPW13-1028.docxRelated documentApplication case desk ↗
About this file
- File size
- 73 KB (small file)
- File type
- DOCX
No other editions are linked here.