Council archive · source document
3089 D2 · 151999.982601.3
ZN
WNW
17
SP152355
18
SP152355
16
SP152355
$P152355
275°53
21
SP152355
20
SP152355
10 50 100
Client Project ;
Horizontal Co-Ord System - Contour Interval 0.25m | Level Datum AHD Hen -Contour and Detail Survey-
Site Plan
Horizontal Co-Ord Origin Level Origin PM116049 | Value 7.84m TEVEI Oly Homes
3 s y 24 Eucalypt Way
Easting Northing - Surveyed SMK Date 22/07/2028 SURVEYING Over Lot 19 on SP152355
‘Computer Fill ‘Scale (A3) | Job No. Locality Drawing Number | Rev | Sheet
Azimuth SP152355| Field Book TSC5 Drawn SMK Date 24/07/2026 | wwwwceveLUPsURVEYING COMAU C:APROJECTS\3089 1800 | "3089 | Coothafaba | “3088 D2 | A | 1of2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 1 page
Page 2
00°01
00°90
Lawn
TE BM Concrete P,
‘ool
IRON PIN ~ Surround
RL:10.05 49 -
A
- °
Proposed ea > [R
Secondary x] 7, 0¥ RN fics
Dwelling 2 S
Nv
Lawn
Existing Single St
‘ore \
Brick Dwelling ¥ | \
| . N
I Lawn \
( ii
UC UIG Septic Tank
7 Conerete Dwelling | g
/ Ks
' @
y" 2 | ki
Water” S SJ $
@
2
iy
60 Lb
%,
2,
Seg,
&
%
Uy.
2.
%%
ey,
be 3}
Oo
oY
3 6 9 12.15 30
ISION NOTES : - i Project
sevisronnors Horizontal Co-Ord System - Contour Interval 0.25m_ |Level Datum AHD Client rojec’ -Contour and Detail Survey-
Horizontal Co-Ord Origin - Level Origin PM116049 | value 7.84m LEVE L Oly Homes ove re edt aoe
Easting - Northing - Surveyed SMK Date 22/07/2026 SURVEYING : :
Computer File Scale (A3) [Job No. |Locality Drawing Number [Rev | Sheet
Azimuth SP152355 | Field Book TSC5 Drawn SMK Date 24/07/2026 W.WWWLEVELUPSURVEYING COMAU_ CAPROJECTS\3089 1:300 3089 | Cootharaba | 3089_D2 A 2 0f2
Used in these records
3089 D2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 226 KB (small file)
- File type
No other editions are linked here.