Council archive · source document
Part 35 of 37 Appendix 26 - QCP DEHP Assessment MCU12/0208
Place Barcode here iil~ f~~~~iffl~E
80602722
THIS IS THE NEXT PART OF A
MULTIPLE PART RECORD
Part 350f"6l
Application number: \\f\C’V\~[ OLO~
C:\DocumenlS and Senings\eje\Desktop\Multi Part Record Cover Sheet NEXT PART
(3).doc
J~
’i-
l... ._
7 0 r~: 7812 {ia;_~~], R
9J
,
,
~
"
,t .
.., I.
..’
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 2 pages
Page 2
~J
~
Queensland
Government
Department of
Environ ment and
Heritage Protection
Ref MCY2663
2 November 2012
Dr Trevor Johnson
Cardno (Qld)Pty Ltd
Locked Bag 4006
Fortitude Valley 4006
on (5101-19-03)
Dear Dr Johnson
I refer to the report, ’Noosa on Weyba QCP Assessment’ provided on 16 October 2012 by
email from Ms. Nadia Guterres of your office.
It is noted that the Noosa on Weyba development covers a number of allotments. However,
the assessment is primarily focused on Lot 11 on SP250714 and the impact of the erosion
prone area and storm tide inundation area on the development of this allotment.
For this site, the coastal hazards mapping prepared to support the Queensland Coastal
Plan (QCP)was based on a highest astronomical tide (HAT)level of O.68m AHD for Munna
Point published by Maritime Safety Queensland (MSQ). Your report indicates that the HAT
level within Lake Weyba is approximately 0.32m AHD based on unpublished data supplied
by MSQ. Following discussion with MSQ (pers. comms. Ray Pedderson 23/10/2012) the
use of the lower level of HAT can be supported.
The shoreline erosion assessment contained in Appendix D of your report has been
reviewed. In relation to the erosion vulnerability of the Lake Weyba foreshore the adoption
of the ’Erosion Prone Area Extent 2100 -
1 OOyrARI’ shown on Figure 3.2 can be supported.
As you are aware the Department of State Development and Infrastructure Planning has
released a draft Coastal Protection State Planning Regulatory Provision which has
suspended the State Planning Policy 3/11: Coastal Protection. As such the department is
unlikely to alter the existing mapping layers pending finalisation of a new SPP for coastal
protection. However, your report and this correspondence can be used to support any
future development application.
Level 8
400 George Street Brisbane
GPO Box 2454 Brisbane
Queensland 4001 Australia
Telephone + 61 7 3339 5824
Website www.ehp.qld.gov.au
Page 1 of 2 ABN 46 640 294 485
Page 3
Please note, in accordance with section 110 of the Coastal Protection and Management Act
1995 a condition requiring surrender of all or part of the lot within the coastal management
district may be considered when assessing an application for reconfiguring a lot. In relation
to Lot 11 on SP250714, land surrender may be considered for the portion of land within the
erosion prone area adjacent to Lake Weyba.
Should you have any further enquiries, please contact the undersigned (Ph: 3339 5824) or
Ben Sale, Manager Sunshine Coast (Ph:5459 6136).
sincerely
/’-
Paul Prenzler
Page 2 of 2
Used in these records
Part 35 of 37 Appendix 26 - QCP DEHP Assessment MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 481 KB (small file)
- File type
No other editions are linked here.