RFI - Sediment basin calculations

of 3

Page text shows just the words. Original shows the document exactly as it was published.

SWMP Commentary, Detailed Calculations

Note: These "Detailed Calculation" spreadsheets relate only to high erosion hazard lands as identified in
figure 4.6 or where the designer chooses to use the RUSLE to size sediment basins. The "Standard
Calculation" spreadsheets should be used on low erosion hazard lands as identified by figure 4.6 and
where the designer chooses not to run the RUSLE in calculations.

1. Site Data Sheet
                                 Site Name: Lot 1 Taylor Court, Cooroy

                          Site Location: Lot 1 Taylor Court, Cooroy

                                  Precinct:

                  Description of Site: Industrial Lot Reconfiguration (4 Lots)


                                                                Sub-catchments
                  Site area                                                                                  Remarks
                                                  1
Total catchment area (ha)                        1.136
Disturbed catchment area (ha)                    1.09


Soil analysis (enter sediment type if known, or laboratory particle size data)
Sediment Type (C, F or D) if known:               D
           % sand (fraction 0.02 to 2.00 mm)
            % silt (fraction 0.002 to 0.02 mm)
       % clay (fraction finer than 0.002 mm)
                        Dispersion percentage
                 % of whole soil dispersible
Soil Texture Group                                D

Rainfall data
Design rainfall depth (days)                       5
Design rainfall depth (percentile)                80
x-day, y-percentile rainfall event               34.6
Rainfall R-factor (if known)
IFD: 2-year, 6-hour storm (if known)              15

RUSLE Factors
Rainfall erosivity (R -factor)                   5010    5010     5010   5010    5010   5010   Auto-filled from above
Soil erodibility (K -factor)                     0.047
Slope length (m)                                  50
Slope gradient (%)                                5.5
Length/gradient (LS -factor)                     1.01
Erosion control practice (P -factor)              1.3    1.3       1.3   1.3     1.3    1.3
Ground cover (C -factor)                           1      1        1      1       1      1

Calculations
Soil loss (t/ha/yr)                               308
Soil Loss Class                                    3                                           See Section 4.3 and Table 4-2.
             3
Soil loss (m /ha/yr)                              237
Sediment basin storage volume, m3                 44                                           See Sections 6.5.3 and 6.6.3




QLD - Sediment Basins- V2.xls                                                                                                   1
Log in to download the original file

RFI - Sediment basin calculations.pdf · 21 KB (small file)

Full text of the other 2 pages

Page 2

SWMP Commentary, Detailed Calculations

2. Storm Flow Calculations
Peak flow is given by the Rational Formula:

                             Qy = 0.00278 x C10 x FY x Iy, tc x A

                where:     Qy       is peak flow rate (m 3/sec) of average recurrence interval (ARI) of "Y" years
                           C10      is the runoff coefficient (dimensionless) for ARI of 10 years. Rural runoff
                                    coefficients are given in Volume 2, figure 5 of Pilgrim (1998), while urban
                                    runoff coefficients are given in Volume 1, Book VIII, figure 1.13 of Pilgrim
                                    (1998) and construction runoff coefficients are given in Appendix F
                            Fy      is a frequency factor for "Y" years. Rural values are given in Volume 1,
                                    Book IV, Table 1.1 of Pilgrim (1998) while urban coefficients are given in
                                    Volume 1, Book VIII, Table 1.6 of Pilgrim (1998)
                            A       is the catchment area in hectares (ha)
                           Iy, tc   is the average rainfall intensity (mm/hr) for an ARI of "Y" years
                                    and a design duration of "tc" (minutes or hours)

    Time of concentration (tc) = (107 n L0.333) / S0.2, in minutes - Friends Equation
                                 or use table of standard inlet times (QUDM Table 4.06.1)
                     where:      n is Hortons roughness value for the surface (similar to Mannings value)
                                 L is length of flow path in metres
                                 S is slope in %

                 n= 0.0275                   L=    50    m                          S=      5.5       %
    Time of concentration (tc) =              8     mins
Peak flow calculations, 1
                 A          tc                              Rainfall intensity, I, mm/hr
    Site                                                                                                                  C10
                (ha)      (mins)       1 yr,tc    5 yr,tc       10 yr,tc      20 yr,tc     50 yr,tc       100 yr,tc
     1          1.136       10         97.5        148           172           196          225             247           0.9




Peak flow calculations, 2
                                                       Peak flows
              Frequency
    ARI
                factor      1                                                                                   Comment
   (yrs)
                 (Fy)
                          (m3/s)      (m3/s)      (m3/s)        (m3/s)       (m3/s)        (m3/s)
   1 yr,tc       0.8      0.222
   5 yr,tc      0.95      0.400
   10 yr,tc       1       0.489
   20 yr,tc     1.05      0.585
   50 yr,tc     1.15      0.735
  100 yr,tc      1.2      0.842




QLD - Sediment Basins- V2.xls                                                                                                   2

Page 3

SWMP Commentary, Detailed Calculations

4. Volume of Sediment Basins, Type D and Type F Soils
               Basin volume = settling zone volume + sediment storage zone volume

Settling Zone Volume
The settling zone volume for Type F and Type D soils is calculated to provide capacity to contain all
runoff expected from up to the y-percentile rainfall event. The volume of the basin's settling zone (V)
can be determined as a function of the basin's surface area and depth to allow for particles to settle and
can be determined by the following equation:

                                V = 10 x Cv x A x Rx-day, y-%ile (m 3)

                         where:

                               10 = a unit conversion factor

                               Cv = the volumetric runoff coefficient defined
                                    as that portion of rainfall that runs off as
                                    stormwater over the x-day period

                     Rx-day, y-%ile = is the x-day total rainfall depth (mm) that
                                      is not exceeded in y percent of rainfall
                                      events. (See Sections 6.3.4(d), (e), (f),
                                      (g) and (h)).

                                 A = total catchment area (ha)

Sediment Storage Zone Volume
In the detailed calculation on Soil Loss Classes 1 to 4 lands, the sediment storage zone can be taken as
50 percent of the settling zone capacity. Alternately designers can design the zone to store the 2-
month soil loss as calculated by the RUSLE (Chapter 6.5.3(d). However, on Soil Loss Classes 5, 6 and
7 lands, the zone must contain the 2-month soil loss as calculated by the RUSLE (Chapter 6.5.3(d).


Place an "X" in the box below to show the sediment storage zone design parameters used here:
               x     50% of settling zone capacity,
                     2 months soil loss calculated by RUSLE


.                                                                   Average Depth of basin =     1      metres

                                            Total    Settling   Sediment    Total            Basin shape
                                         catchment    zone       storage    basin
    Site       Cv       Rx-day, y-%ile
                                            area     volume      volume    volume    L:W       Length      Width
                                            (ha)      (m3)         (m3)        3
                                                                             (m )    Ratio      (m)         (m)

     1        0.58          34.6           1.136       228        114       342        3        32.0       10.7
              0.58                                                                     3
              0.58                                                                     3
                                                                                       3
                                                                                       3
                                                                                       3




QLD - Sediment Basins- V2.xls                                                                                      5

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.