Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Engineering_Integrated Water Management Plan

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
2.4 Treatment Measures

The various treatment measures proposed to be implemented within this
development are outlined below. They are made up of rainwater tanks, EnviroPods,
StormFilters and bioretention systems. The localities of the measures are detailed in
Figure 6.

2.4.1 Rainwater Tanks




Through appropriate design of rainwater tanks it has been found that significant
reductions in run-off can be achieved. Rainwater tanks not only provide temporary
detention of stormwater run-off, but also provide a significant alternative for water
supply uses. Collected roof water is suitable for garden irrigation or toilet flushing
with no additional treatment.
Rainwater tanks have been modeled as a lumped tank to represent the entire
development. Sizing of each tank volume has been modeled in MUSIC using
estimated demands for each use to achieve a minimum 80% reliability. The
demands of each use on the site are highlighted in below in Table 7. Irrigation of the
site landscape will be sourced from the Tavern tank. Landscaping area has been
estimated as 10% of the carpark area, irrigating at a rate of 548mm/yr. The annual
irrigation demand scaled by daily PET was calculated as 270KL/yr.

Table 7: MUSIC Rainwater Tank Demands

                                  Units      Average         Demand         Daily
      Use           Usage                    Persons         (L/P/D)       Demand
 A1-Residential      Toilet         6            1.2            26          187.2
                    Laundry         6            1.2            35           252
  Commercial         Toilet         10            2             25           500
 A2-Residential      Toilet         18           1.2            26          561.6
                    Laundry         18           1.2            35           756
    C-Tavern         Toilet         1              -             -          1,800
    E-Shops          Toilet         3             2             25           150
    F-Shops          Toilet         5             2             25           250

Based on the roof catchment areas and the demands estimated for each use, the
rainwater tank modeling parameters are detailed in Table 8.




                                                                                         9
Log in to download the original file

Engineering_Integrated Water Management Plan.pdf · 6.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.