Log in to see the plans as drawnA comparison of peak Rational Method flow rates compared with peak WBNM
model flow rates are provide in Table 16 below.
Table 16: Rational Method Peak Flows Versus WBNM Peak Flows
ARI Rational Method WBNM Difference
(Years) m3/s m3/s (%)
2 0.64 0.73 12.3
10 1.02 1.01 0.1
100 1.76 1.40 -25.6
The above results show that a reasonable peak flow calibration has been achieved
for the 2 and 10 year events of the WBNM model when compared to a Rational
Method calculation. The WBNM model produces a lower peak in the 100 year event
however, this would be considered conservative when assessing non-worsening of
flows.
16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.