Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Engineering_Integrated Water Management Plan

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
13/08/2013 4:55:45 PM

 

    

   

 
    
 

DETENTION TANK
CATCHMENT C

APPROX

TEMPORARY GREEN
SPACE REFER
ARCHITECTS DRAWINGS

Z
«STORMWATER TREATMENT

“SBASIN CATCHMENT B (APPROX
; 65m?) IF REQUIRED
SN

REFER TO SHEET SEW1 FOR
SEWER DIVERSION DETAILS

STORMWATER TREATMENT BASIN
CATCHMENT C (APPROX 45m?)

 

(MAINTAIN 1.5m CLEARANCE TO TEMPORARY GREEN
EXIST SEWER) SPACE REFER
ARCHITECTS DRAWINGS
&
ot

-CONNECT TO EXISTING
STORMWATER
TREATMENT B in

CATCHMI

(APPROX 40m?)

 
   
 

 

      
   

100m?

  
     
 

\

LoutLet TO EXISTING 4
SURFACE IN ROAD
RESERVE

OUTLET IN EXISTING
\ ROCK LINED CHANNEL

 

 

 

 

 

 

 

 

 

S/W MANHOLE

 

 

 

 

 

 
     

ENT D

 
 
 

/
/ DETENTION TANK
CATCHMENT D

~~.
\ a APPROX 100m?

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

—
OTOH
pot LL

—
LA
CP)

   

 

   
  
 
 
  

  
   

  

N
LEGEND:

Rg

      
 

 
 

rl

!
A

IP: 0.000°

Lt

   

LLL

L0

\V/ QD

  
  

 

 

 

 

 

 

ON

[FROM SPECIALTY SHOP AREA

\

 

CONNECT TO EXISTING PIPE

TEMPORARY GREEN SPACE

  
   
 
 

 

STORMFILTER TO TREAT RUNOFF
FROM SPECIALTY SHOP AREA.

i
“STORMFILTER TO TREAT RUNOFF

   

pope
os

   
    

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0 5 10 15 20 25m STORMWATER TREATMENT BASIN
Lett
SCALE 1: 500 @A1 : 1000 @ A3 Ea DETENTION TANKS
STORMFILTER TREATMENT CELLS RY
a INDICATIVE PAVEMENT FALL RELIMIN! \
-++-21.30 INDICATIVE PAVEMENT LEVEL
=m FUTURE DEVELOPMENT LINE
COPYRIGHT. Associated Consultants Client: Drawn Verified Project: Drawing Title: Scale [Sheet Size]
econ i, COLES GROUP PROPERTY T D Owe OR NOOSA JUNCTION - NOOSA FAIR SITE - PRELIMINARY AS SHOWN | AJ
be used or reproduced without esigne ere
he wen pero tod DEVELOPMENTS Dwe PROPOSED EXTENSION RE-DEVELOPMENT STORMWATER LAYOUT Drawing No
onsuting Py 7 ;
pecuniary OETA: consulting engineers Approved RPEGQNo 9072 ROP PLAN - PROPOSED 12691
Detis shal be treated as not ABN, 39 128 805 336 y! LOCAL AUTHORITY Sunshine Coast Council
a at Or on hi Sh (07) 54 ay Ph 40.2: MCU APPROVAL TBA HORIZ DATUM rpssazxe | DEVELOPED SITE Sheet REV
see asiuel fo once AHH STORMFILTER CELLS DWH Sunshine Coast Ph (07) 5449 9600 Mackay Ph (07) 4840 2337 CL ASEROUAL ee eta HD coneee swe A
REV|DATE Rev Description Om email : [email protected] web : www.todconsulting.com OPW APPROVAL RL 20.159

 

 

 
Log in to download the original file

Engineering_Integrated Water Management Plan.pdf · 6.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.