Original source · versioned page text
LMDIP - Wimmers Carpark Site Planning Assessment
EMR / CLR Search Results
Figure 1: Riparian buffer overlay in the NSC planning scheme
It was found that the site is listed on the EMR for PETROLEUM PRODUCT OR OIL STORAGE. However this is not relevant to the
current operations on the property by the Wimmers factory and they do not currently operate any petroleum or oil storage.
The site was not included on the CLR.
3. Site Plan
This Site Planning Assessment presents the following information:
Project location with riparian buffer zoning (Figure 1)
Project location with lot & plan boundaries (Figure 2)
Proposed parking layout (Figure 3)
ESC & drainage (ESCP)
nearest waterway (ESCP)
REX# D26/127335 Wimmers Carpark Planning Assessment, 20 July 2026 Page 3 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.