STAGE 6 PROCEDURE :
EXCAVATE BEYOND THE LEVEL 1 WORKING
20mm PLATE WALINGS WITH 3 x 150 UB
PLATFORM TO FORM THE RAMP DOWN TO A STRONG BACKS WELDED TO PILES AS SHOWN.
LOWER TURNAROUND PLATFORM AT RL 41.00.
EXCAVATE TO FORM ANOTHER RAMP DOWN
TO THE POOL LEVEL WORKING PLATFORM
SCREW PILE
CUT/FILL PLATFORM AREA AND USE
TEMPORARY SANDBAG RETAINING
.
STRUCTURES TO RETAIN FILL. NG
STABILISE CUT BANKS WITH URETEK OR DRIVEWAY RESTRAINING SLAB m LO
APPROVED SIMILAR AS REQUIRED.
E 6.0
OB
E ST
PIL
S.
CR
SCREW PILE
LEVEL 1 BEAM AT RL 45.00
TEMPORARY RETAINING
STRUCTURE. VARIES BETWEEN CK
1.0m AND 2.0m HIGH. G BA
E
R ON
OP25 ST
UB
150
CK
LEVEL 1 SLAB AT RL 45.00 G BA
R ON
ST
UB AC
K
150 B
600
EARTHWORKS - STAGE 6 NG
T RO
1:200 UNREDUCED AT A3 S
1:100 UNREDUCED AT A1 UB G
150
RL 43.00
KIN
RL 44.50
OR 37.00
400
W
0
L
VE AT RL
RL 41.0
LE
OL ORM
200
P O F
AT
PL
LEVEL 1 WORKING
PLATFORM AT RL 44.50
00
41.
RL
.50
RL 44
4.00
RL 4 0
RL 43.0
0
TEMPORARY RETAINING
ESHAP
E RL 42.0
AND R STRUCTURE DETAIL
O S T A BILISE LA T F ORMS
ETE T KING P .0 0 1:50 UNREDUCED AT A3
HOTCR Y WOR RL 41 1:25 UNREDUCED AT A1
75mm S R TEMPORAR
F O
BANK
0.00
RL 4
PROVIDE 4 x RV2 SCREW PILES
UNDER RAINWATER TANK
G
AININ
Y RET HIGH.
ORAR
TEMP TURE. 2.0m
C
STRU
0
7.0
PROVIDE 4 x RV2 SCREW PILES
20mm PLATE WALINGS WITH 3 x 150 UB
3
UNDER STORMWATER TANK
RL
STRONG BACKS WELDED TO PILES AS
SHOWN ON THE ADJACENT DETAIL.
75mm SHOTCRETE TO STABILISE AND
RESHAPE BANK FOR TEMPORARY
WORKING PLATFORMS
CRS. PILES TO BE 6.0m LONG.
1
BOUNDARY
1
POOL LEVEL WORKING
PLATFORM AT RL 37.00
TEMPORARY RETAINING
STRUCTURE. VARIES BETWEEN E
FAC
1.0m AND 2.0m HIGH. SUR
RAL
2.0m MAX.
U
LIN
E NAT
T POOL LEVEL WORKING TEMPORARY RETAINING
CU
PLATFORM AT RL 37.00 STRUCTURE. VARIES
BETWEEN 1.0m AND
1 2.0m HIGH.
4.0m MIN.
10
-
F
- NOOSA COUNCIL
APPROVED PLAN SECTION F
TEMPORARY RETAINING
STRUCTURE. VARIES BETWEEN
OPW16/0021 11 JUL 2016 1:200 UNREDUCED AT A3
1:100 UNREDUCED AT A1
-
1.0m AND 2.0m HIGH.
COPYRIGHT Associated Consultants Client Drawn Verified Project Drawing Title Scale Sheet Size
This drawing is subject to A. VENESS S. PRYSTUPA
copyright in accordance with the Brisbane address
GROUND LEVEL
UNIVERSAL PROPERTY Designed Verified
PROPOSED NEW RESIDENCE AT EARTHWORKS PLAN AS SHOWN A1
agreement between Tod 283 ELIZABETH ST
Consulting pty ltd (tc) and tc's
client. This drawing shall only be
BRISBANE 4000
AUSTRALIA
COMPANY H. GRAY S. PRYSTUPA 71 SEAVIEW TCE, SUNSHINE BEACH STAGE 6 Drawing Number
architects postal address
used for this specific project.
C 4.5.16 AMENDED AS CLOUDED A.V.
planners
interiors
GPO BOX 353
BRISBANE
QUEENSLAND 4001
AUSTRALIA
ESTABLISHMENT Approved
S. PRYSTUPA
RPEQ No
1137
RDP RP197117 14517-OP26
This drawing shall not be used
Noosa: 07 5449 9600 LOCAL AUTHORITY NOOSA
B 30.3.16 ISSUED FOR CONSTRUCTION A.V. tel +61(0)7 3229 5266 Sunshine Coast: 07 5329 3190 Mackay: 07 4840 2337
Signed Date 0 10 20 30 40 50 60 Sheet Revision
for construction until marked as Noel Robinson Architects Pty Ltd fax +61(0)7 3221 0796
[email protected] PO Box 61, Noosaville, QLD 4566 MCU APPROVAL 14/0084 HORIZ DATUM
ABN 62 323 175 502
A 27.1.16 OPERATIONAL WORKS APPROVAL A.V. www.nrarc.com
'issued for construction' in the
revision description. Rev Date Revision Description Drawn
ACN 010 011 720 [email protected] www.todconsulting.com
ABN 39 128 805 336 DECEMBER 2015 ROL APPROVAL
OPW APPROVAL
VERT DATUM AHD
RL 41.410 MEASUREMENT BAR - INCREMENTS IN mm
5 of 12 C
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW16/0021 - Approved Plans Civil Engineering 1of 2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.