Slope Stability Assessment
Lot boundary
Approx. proposed building locations
Text Figure 8: Extract from NC Landslide Hazard Overlay Mapping
It should be noted that the NC map is a broad-scale indication of the potential landslide susceptibility
and is superseded by site specific investigation and this assessment. Near the proposed residential
buildings there were no signs of global, natural slope instability.
3.2 Stability Assessment
The risk assessment for this project has been carried out following AGS 2007 Practice Note Guidelines for
Landslide Risk Management. Relative levels of risk and their implications are given in Table 1 below, and
the Qualitative Terminology for Use in Assessing Risk to Property which is also attached.
Table 1: Stability Risk Levels
Risk Level Example Implications(1)
VH Very High Unacceptable without treatment. Extensive detailed investigation and research, planning and
Risk implementation of treatment options essential to reduce risk to Low; may be too expensive and
not practical. Work likely to cost more than value of property.
H High Risk Unacceptable without treatment. Detailed investigation, planning and implementation of
treatment options required to reduce risk to Low. Work would cost a substantial sum in relation to
the value of the property.
M Moderate May be tolerated in certain circumstances (subject to regulators’ approval) but requires
Risk investigation, planning and implementation of treatment options to reduce risk to Low. Treatment
options to reduce to Low risk should be implemented as soon as practicable.
L Low Risk Usually acceptable to regulators. Where treatment has been required to reduce the risk to this
level, ongoing maintenance required.
VL Very Low Acceptable. Manage by normal slope maintenance procedures.
Risk
Note: (1) The implications for a particular situation are to be determined by all parties to the risk assessment and may depend
on the nature of the property at risk; these are only given as a general guide.
13 February 2026
26020-001-Rev0 8 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.