Council archive · source document
LATEST - RECEIVED 23.10.26 - Attachment 1A - Other Change Decision Notice · 132005.638.06
Page 29 of 72 Document Set ID: 24377726 Version: 13, Version Date: 23/12/2025 [OCR of page images] Queensland Government Natural Resources and Mines ~~“ ncerfainty iti thé €steblishiiient Of thé Offset, and’so that the outcome is ho net loss of — biodiversity, 5. The offset area must be able to be mapped as remnant vegetation within twenty years, Therefore the: - a) extent of the offset area must be at least 2 hectares. “nnn napplication-must inelude-a detailed revegetation-or restoration plan-which specifies: i. risks to the revegetation or restoration project, such as weed infestations and fire, and actions that will be undertaken to minimise those risks; ii. goals and measures which quantify the realistic stages by which the offset area will reach remnant status within the 20 year period; iii. the establishment of a monitoring program, including photo monitoring points and the recording of species composition, abundance and mean heights of species at those sites; and iv, remedial actions that will be undertaken if the goal/measure of any stage of the restoration or revegetation plan is not met; and v. reference to published literature; or vi. @ written opinion of a recognised expert in the field of revegetation and restoration; or vii. comparison to revegetation/restoration projects in similar regional ecosystems and similar conditions. C. An offset proposed to meet a different Performance Requirement or Acceptable Solution of a Regional Vegetation Management Code for Ongoing Clearing Purposes or the Concurrence Agency Policy for a Material Change of Use to those mentioned in Part A or B of this Policy, nwust be referred to the Vegetation Management Policy Unit. D. Any development approval involving an offset must contain conditions relating to the revegetation / restoration plan. E. Financial contributions do not constitute an acceptable offset. F. The land on which an offset is proposed must be included in the development application, DEFINITIONS: Note: Where any term is already defined in a Regional Vegetation Management Code for Ongoing Purposes, the Concurrence Agency Policy for a Material Change of Use, the Concurrence Agency Policy for Reconfiguring a Lot or the Vegetation Management Act 1999, this policy does not redefine the term. Bioregions: are based on broad landscape patterns that reflect the major structural geoiogies and climate as well as major changes in floristic and faunal assemblages. Bioregions contain a number of subregions, Bioregions are described by Sattler and Williams (1999) in The Conservation Status of Queensland's Bioregional Ecosystems, Environmental Protection Agency, Brisbane, or can be found at: http://www.nrm.qld.gov.au/vegetation/pdf/bioregion_v0001.pdf Policy Number: Prefix/Number/Year Version No: Last Updated: 23/09/05 Page 29 of 72 Document Set ID: 24377726 Version: 13, Version Date: 23/12/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
LATEST - RECEIVED 23.10.26 - Attachment 1A - Other Change Decision Notice.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.