Attachment B - Proposal Plans (002) · MCU15/0111.03
Plans and drawings: the text below has words only, no drawings.
208 207 199 198 197 196 195 194 193 192 191 190 189 188 187
214 213 211 210 209
186 DETENTION
GATE / SECONDARY
ENTRY
185
206 201 181 182 183 184
212 200 174 175 176 177 178 179 180 160
161
205 202
171 170 169 168 167 166 165 164 163 162
173
203
1-2m TENNIS
LANDSCAPE WORKSHOP COURT
TREATMENT 172 157 158 159
204
RECREATIONAL CARAVAN CARAVAN
146 147 148 149 150 151 152 153 154 155 156 BUILDING PARKING WASHDOWN
145
1-2m 131 130 129 128 127 126 125 124 123 122
LANDSCAPE 144 SEE ENGINEERING PLANS
TREATMENT DETENTION FOR EASEMENT WIDTHS
143
132 120 121
142 141
133
140 119 BOWLING GREEN
134 105
139 118
135 106
138 117
107
116 104
137 108
115 103
109 90
220
136 102
110 91 CLUBHOUSE 219
114 101
92 218
113 89 215
100
93
112 99 88 216
1-2m 74
LANDSCAPE 94
111 87 217
TREATMENT 75 GATE / MAIN
95
98 86 ENTRY
76
73 DETENTION
85
97 77
84 72
96 58 BIN STORAGE AREA
78
71 1
83 79 59
70 2
82 60
57
69 3
81 61
68 56 42
62 4
80 55
43 5
67 63
54
44 6
66 53 41
52 45 7
65 40
27
46 8
64 39
47 28
9
51 38
29
26 10
50 37
36 30
25
49 11
31
24
48 12
32
1-2m 23 2m
LANDSCAPE 35 13 LANDSCAPE
TREATMENT 22 TREATMENT
34 14
21
33 15
16
20
GATEHOUSE
1-2m 19
LANDSCAPE
TREATMENT 18
17
PEDESTRIAN
LINK TO BUS
STOP
2m
LANDSCAPE
TREATMENT
©
[OCR of page images]
avou SLNONY
21a | 213 | 211 | 210 | 209 | 208 | 207 | 199 | 198 | 197 | 196 | 195 | 194 | 193 | 192 | 191 | 190 | 189 | 188
EO _
212 as | 201 | 200 | 474 175 | 476 | 177 | 478 | 4179 | 180 | 181 | 182 | 183 | 184
205 |) i] 202 i
473 amt |470 | 169 | 168 | 167 \ 166 | 165 | 164 | 163 | 162
203
12m
LANDSCAPE Pt dtd i)
TREATMENT 204 172 aoe -
155 | 156
42m
LANDSCAPE:
TREATMENT
131 | 130 | 129 | 128 | 127 | 126 | 125 | 124
146 | 147 | 148
18,000mm_MINIMUM
1.2m
LANDSCAPI
TREATMENT
ROOF OVERHANG
WITHIN SETBACK
123 | 122
DETENTION
RECREATIONAL CARAVAN CARAVAN
BUILDING
PARKING WASHDOWN
‘SEE ENGINEERING PLANS
FOR EASEMENT WIDTHS
ff LANDSCAPE
: _ J [wes
ce s € & a GATEHOUSE
5 § RESIDENCE 5 oc = ion SA
S| —E Max. Cover 65.0% Total Ss 2 ‘TREATMENT
2 3 Bo em
ENTRY o NTO BUS —
GARAGE
FIRE RATED WALL 60/60/60.
+—Gorage to Boundary —y
(02 SITING CONSTRAINTS =e
(OL GENERIC SITE AREA ~ 234.0 Sq.m 7
PROPOSED RESORT DEVELOPMENT—AREA 121,578sqm |
TOTAL DWELLINGS = 220 —
MIN VISITOR SPACES = 55
MIN LOT SIZE = 230sqm
PRIVATE OPEN SPACE MIN/LOT = 20sqm
PRIVATE OPEN SPACE MIN WIDTH = 3m
MAX SITE COVER = 65%
MIN 450mm EAVES, EXEPT TO GARAGES BUILT TO ZERO LOT LINE
MAX SINGLE STOREY NOT GREATER THAN 6m IN HEIGHT
MIN 12° ROOF PITCH
MIN SETBACK TO PUBLIC ROAD 6m
(EXCLUDING COVERED OUTDOOR AREA)
MIN PROPERTY BOUNDARY SETBACK = 3m
CAR PARKING LOCATIONS MAY ALTER IN FINAL LAYOUT.
NOTE: GARAGE MAY BE BUILT TO ZERO LOT LINE
PROPOSED AGED CARE DEVELOPMENT—AREA 20,245sqm
TOTAL BEDS = 120
CAR PARKING LOCATIONS MAY ALTER IN FINAL LAYOUT.
0 59m 100m 150m 200m
SCALE 1:2500 (AT A3)
© copyricut DRAWING REFERENCE No, HOUSE TYPE / VARIATION DEVELOPMENT NAME DRAWN
put uate seour ows commons on ESE | Ogg — 201 4| OVERALL SITE PLAN we cooroy | Ey Palm ake
PURPOSES OTHER THAN FOR THE ERECTION OF THE
SUBJECT PROPERTY, BY OR ON BEHALF OF PALM
LAKE GROUP. RE COMMENTS DATE |DRWN ADDRESS
Feet fesvosis) EJ Lot |102 SP287641 01
G [REVISED CLUBHOUSE /igio/is| EJ | STREET |19 TRADING POST RD
H] REVISE STE Jigaiis} EJ JSUBURB |COOROY Y
| SSRN porns es [Prcope [4563 | staTe|QLD
PROJECT NORTH] SHEET No, Sear
Ne
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 5 pages
Page 2
208 207 199 198 197 196 195 194 193 192 191 190 189 188 187
214 213 211 210 209
GATE / SECONDARY
STAGE 186 DETENTION
ENTRY 6
185
206 201 181 182 183 184
212 200 174 175 176 177 178 179 180 160
161
205 202
171 170 169 168 167 166 165 164 163 162
173
203
1-2m
LANDSCAPE
STAGE TENNIS
WORKSHOP COURT
TREATMENT 204
172
5 157 158 159
RECREATIONAL CARAVAN CARAVAN
146 147 148 149 150 151 152 153 154 155 156 BUILDING PARKING WASHDOWN
145
1-2m 131 130 129 128 127 126 125 124 123 122
LANDSCAPE 144 SEE ENGINEERING PLANS
TREATMENT DETENTION FOR EASEMENT WIDTHS
143
STAGE
132 120 121
142 141 3
133
140 119 BOWLING GREEN
134 105
139 118
135 106
138 117
107
116 104
137 108
115 103
109 90
220
136 102
110 91 CLUBHOUSE 219
114 101
92 STAGE 218
113 100
93
89 215 7
112 99 88 216
1-2m 74
LANDSCAPE 94
111 87 217
TREATMENT 75 GATE / MAIN
95
98 86 ENTRY
76
73 DETENTION
85
97 STAGE 77
72
96 1a 84 78
58 BIN STORAGE AREA
71 1
83 79 59
70 2
82 60
57
69 3
81 61
68 56 42
62 4
80 55
43 5
67 63
54
44 41
STAGE 6
66 53
45
4 7
52 40
65
27
46 8
64 39
47 28
9
51 38
29
26 10
50 37
STAGE 36 30
25
49 2 31
11
24
48 12
32
1-2m 23 2m
LANDSCAPE 35 13 LANDSCAPE
TREATMENT 22 TREATMENT
34 14
21
33 15
16
20
GATEHOUSE
1-2m 19
LANDSCAPE
TREATMENT 18 STAGE 1B
17
PEDESTRIAN
LINK TO BUS
STOP
2m
LANDSCAPE
TREATMENT
©
[OCR of page images]
192 | 191 188
42m
LANDSCAPE
TREATMENT
158 | 159
LANDSCAPE:
TREATMENT
TREATMENT
DETENTION
GATEHOUSE
SAN
LANDSCAPE™
‘TREATMENT
em
LINK TO BUS- =
STOP
2m
LANDSCAPE’
TREATMENT
DEVELOPMENT
40 DWELLINGS, CLUBHOUSE. OUTDOOR POOL
& DETENTION BASIN
120 BED AGED CARE FACILITY.
65 DWELLINGS.
6 DWELLINGS, BOWLS GREEN, CARAVAN STORAGE,
CARTAKERS & DETENTION BASIN.
52 DWELLINGS, TENNIS COURT, WORKSHOP,
GOLF ROOM & DETENTION BASIN.
57 DWELLINGS.
RECREATIONAL CARAVAN
BUILDING PARKIN
\
CARAVAN
STAGE 1B
‘SEE ENGINEERING PLANS
FOR EASEMENT WIDTHS
ff LANDSCAPE
JP / veatwent
j
f
0 5Qm 100m 150m 200m
SCALE 1:2500 (AT A3)
© copyricut DRAWING REFERENCE No. HOUSE TYPE / VARIATION DEVELOPMENT NAME DRAWN
PALM LAKE GROUP OWNS COPYRIGHT OF THESE
PLANS. THEY SHALL NOT BE USED FOR ANY OTHER |C QO — QOOO- 2014 STAGING PLAN MHE COOROY EJ Palm Lake
PURPOSES OTHER THAN FOR THE ERECTION OF THE ®
SUBJECT PROPERTY, BY OR ON BEHALF OF PALM lest
LAKE GROUP. RE COMMENTS DATE |DRWN ADDRESS PROJECT NORTH} SHEET No, ~~»
REVISED SITE
F LAYOUT osvos/is} EJ LoT 102 SP287641 02
G [REVISED CLUBHOUSE /igio/is| EJ | STREET |19 TRADING POST RD
H] REVISE STE Jigaiis} EJ JSUBURB |COOROY
| SSRN porns es [Prcope [4563 | staTe|QLD
Ne
Page 3
0 1 2 4 6 10
©
[OCR of page images]
DETENSION
NOTES.
— GROUND LEVELS, FINISHED FLOOR LEVELS,
SITE WORKS AND RETAINING ARE INDICATIVE
ONLY AND ARE TO BE CONFIRMED ON SITE
PRIOR TO CONSTRUCTION. SITE PLANS ARE TO
BE READ IN CONJUNCTION WITH ANY
SURVEY /ENGINEERING PLANS AVAILABLE.
—ALL DIMENSIONS ARE TO BE CHECKED WITH
EXISTING AND PROPOSED SITE CONDITIONS.
— WRITTEN DIMENSIONS TO BE TAKEN IN
PREFERENCE TO SCALED
— NO VARIATION MAY BE MADE TO THESE
DRAWINGS WITHOUT THE PRIOR APPROVAL OF
THE BUILDING DESIGNER
— REFER TO ENGINEERS DESIGN,
DOCUMENTATION AND CALCULATION FOR
DETAILS ON SLAB, FOOTINGS, STRUCTURE,
RETAINING WALLS, FINISHED FLOOR LEVELS,
SITEWORKS AND STORMWATER DETAILS.
— THIS DRAWING IS TO BE READ IN
CONJUNCTION WITH ALL OTHER DRAWINGS
SHEETS, CONSULTANTS DRAWINGS, DOCUMENTS,
SCHEDULES AND SPECIFICATIONS (AS
APPLICABLE).
— THE BUILDER AND SUBCONTRACTOR SHALL
ENSURE THAT ALL STORMWATER DRAINS,
SEWER PIPES AND THE LIKE ARE LOCATED AT
A SUFFICIENT DISTANCE FROM ANY BUILDINGS
FOOTING AND/OR SLAB EDGE BEAMS SO AS
TO PREVENT GENERAL MOISTURE PENETRATION,
DAMPNESS, WEAKENING & UNDERMINING OF
ANY BUILDING AND ITS FOOTING SYSTEM.
— LOCATION OF ALL EXISTING ONSITE
SERVICES TO BE CONFIRMED ONSITE PRIOR TO
CONSTRUCTION
—LICENCED PLUMBER TO CONFIRM FINAL
ALIGNMENT OF HOUSE SEWER AND
STORMWATER. CONFIRM ALL FALLS PRIOR TO
CONSTRUCTION.
BOWLS GREEN
IMPORTANT!
SITE INFORMATION IS INDICATIVE
ONLY. PLANS SHOULD BE READ
IN CONJUNCTION WITH A
SURVEYORS PLAN PROVIDED BY
A REGISTERED SURVEYOR PRIOR
TO COMMENCING CONSTRUCTION.
SITE PLAN
1:150
DRAINAGE EASEMENT
CARA
N PARKING
© COPYRIGHT
PALM LAKE GROUP OWNS COPYRIGHT OF THESE PLANS.
THEY SHALL NOT BE USED FOR ANY OTHER PURPOSES
OTHER THAN FOR THE ERECTION OF THE SUBJECT
PROPERTY, BY OR ON BEHALF OF PALM LAKE GROUP.
ABN 77 915 457 991 ACN 005 277 038
SOUTHPORT CENTRAL TOWER 3
LAWSON ST SOUTHPORT QLD 4215
PO BOX 10479 SOUTHPORT BC QLD 4215
PH: 07 5552 1300 FAX: 07 5552 1399
Email: [email protected]
Website: www.PalmLakeResort.com.au
DRAWING REFERENCE No.
HOUSE TYPE / VARIATION
DEVELOPMENT NAME
DRAWN
CO-RR- O19
RECREATIONAL
BUILDING
MHE COOROY
EJ
COMMENTS
DATE
DRWN
ADDRESS
PROJECT NORTH
SHEET No.
DA DRAWINGS
30/07/19}
EJ
LOT:
102 SP287641
STREET
19 TRADING POST RD
SUBURB
COOROY
P'CODE
4563 STATE|QLD
01
O04
Ma PaimLake
Works
sS
PH: 07 5552 1300 FAX: 07 5552 1399
Email: [email protected]
Website: www.PalmLakeResort.com.au
Page 4
© [OCR of page images] | 22965 | 7 7 bp 2000 | 20965 | 7 I 7 fe f 2 8 8 g of S| 3 © ACCESS W.c 3 2 s _ _ _ _ & COMMON ROOM ° 2 5 3 Sa | 3 tT 3 af of | 2000 | 20965, | 7 7 7 7 7 NOTE: PROVIDE SOmm FLOOR SETDOWN TO BATHROOMS, ENSUITES, POWDER + WC’S INTERNAL LIGHT FITTINGS— AT LEAST 80% OF FITTINGS TO HAVE FLURO OR OTHER APPROVED ENERGY SAVING GLOBES. —TERMITE PROTECTION IN ACCORDANCE WITH AS3660.1 —PROVIDE VENTILATION TQ ROOF BY VENTING EAVES AS PER BCA Clause 3.12.1.2(b)(I)(A) OR VENTILATORS AS PER BCA Clause 3.12.1.2(b)(ii)(B) © copyricht DRAWING REFERENCE No. HOUSE TYPE / VARIATION DEVELOPMENT NAME DRAWN PALM LAKE GROUP OWNS COPYRIGHT OF THESE PLANS. RECR EATI ON AL THEY SHALL NOT BE USED FOR ANY OTHER PURPOSES. — — OTHER THAN FOR THE ERECTION OF THE SUBJECT C O R R 0 1 9 BUILDING MHE COOROY EJ Palm Lake PROPERTY, BY OR ON BEHALF OF PALM LAKE GROUP. Works AON 77 918 457 991 ACN 008 277 028 REML__COMMENTS | DATE [ORWN ADDRESS PROJECT NORTH | SHEET No. —> F | OC C) RR [> | A \ SOUTHPORT CENTRAL TOWER 3 Al] pa vrawnes |s0/07/o| Ey Lor:]102 SP287641 LAWSON ST SOUTHPORT QLD 4215 O? PO BOX 10479 SOUTHPORT BC QLD 4215 STREET|19 TRADING POST RD PH: 07 8652 1300 FAX: 07 5852 1399 . OF AX: O07 mail: [email protected] 1:100 PH Ocal. infeGpalnlake com ca 13599 SUBURB|COOROY 0 4 Website: www.PalmLakeResort.com.au UY Le Website: www.PalmLakeResort.com.au P’CODE!456 3 STATE|QLD
Page 5
© [OCR of page images] \ ELEVATION 1 POST. SELECTED COLORBOND ROOF ON TIMBER TRUSSES AT 22.5° PITCH METAL FASCIA, GUTTER AND DOWNPIPES HEBEL "POWER-PANEL”. RENDER + APPLIED FINISH. HARDIES STRIA 255 SPLAYED CLADDING SCALE 1:100 SELECTED COLORBOND ROOF ON TIMBER TRUSSES AT 22.5' PITCH ;—METAL FASCIA, GUTTER AND DOWNPIPES cL ~ ~ ~ ~ ~ + = 7 ~ ~ ~ ~ ~ ~ ~ | [WINS - - - - lo - - - - - - - - - ° g ~| oOo N| oO N FFL _ _ _ _ _ a ~ ~ 7 7 — “J _ _ _ _ _ _ _ _ _ ELEVATION 2 SCALE 1:100 ELEVATIONS 1: 100 | — HARDIES STRIA 255 SPLAYED CLADDING Lscoe. “POWER-PANEL”. RENDER + APPLIED FINISH. —ALUMINUM FRAMED GLAZING ‘_s0sq sa POST. © COPYRIGHT PALM LAKE GROUP OWNS COPYRIGHT OF THESE PLANS. THEY SHALL NOT BE USED FOR ANY OTHER PURPOSES OTHER THAN FOR THE ERECTION OF THE SUBJECT PROPERTY, BY OR ON BEHALF OF PALM LAKE GROUP. ABN 77 915 457 991 ACN 005 277 038 SOUTHPORT CENTRAL TOWER 3 LAWSON ST SOUTHPORT QLD 4215 PO BOX 10479 SOUTHPORT BC QLD 4215 PH: 07 5552 1300 FAX: 07 5552 1399 Email: [email protected] Website: www.PalmLakeResort.com.au DRAWING REFERENCE No. HOUSE TYPE / VARIATION DEVELOPMENT NAME DRAWN RECREATIONAL — — MHE COOROY CO RR 019 BUILDING EJ REV} COMMENTS DATE | DRWN ADDRESS PROJECT NORTH | SHEET No. A DA DRAWINGS —_|30/07/19]_ EJ LOT:|102 SP287641 STREET|19 TRADING POST RD SUBURB] COOROY P’CODE|4563 STATE [QLD OS O4 PH: O07 5552 1300 FAX: 07 5552 1399 Email: [email protected] Website: www.PalmLakeResort.com.au UY
Page 6
©
[OCR of page images]
\
ELEVATIONS
1: 100
SELECTED COLORBOND ROOF ON
TIMBER TRUSSES AT 22.5° PITCH
METAL FASCIA, GUTTER
AND DOWNPIPES
HEBEL "POWER-PANEL”.
RENDER + APPLIED FINISH.
ELEVATION 3
SCALE 1:100
HARDIES STRIA 255
SPLAYED CLADDING
90sq SQ
POST.
ALUMINUM
FRAMED GLAZING
ELEVATION 4
SCALE 1:100
HEBEL "POWER-PANEL”.
RENDER + APPLIED FINISH.
SELECTED COLORBOND ROOF ON
TIMBER TRUSSES AT 22.5" PITCH
METAL FASCIA, GUTTER
AND DOWNPIPES
HEBEL “POWER-PANEL”.
RENDER + APPLIED FINISH.
© COPYRIGHT
PALM LAKE GROUP OWNS COPYRIGHT OF THESE PLANS.
THEY SHALL NOT BE USED FOR ANY OTHER PURPOSES
OTHER THAN FOR THE ERECTION OF THE SUBJECT
PROPERTY, BY OR ON BEHALF OF PALM LAKE GROUP.
ABN 77 915 457 991 ACN 005 277 038
SOUTHPORT CENTRAL TOWER 3 A
LAWSON ST SOUTHPORT QLD 4215
PO BOX 10479 SOUTHPORT BC QLD 4215 STREET|19 TRADING POST RD
PH: 07 5552 1300 FAX: 07 5552 1399
Email: [email protected] SUBURB|COOROY
Website: www.PalmLakeResort.com.au P’CODE|4563 STATE|QLD
DRAWING REFERENCE No. HOUSE TYPE / VARIATION DEVELOPMENT NAME DRAWN
RECREATIONAL
— — MHE COOROY
CO RR 019 BUILDING EJ
REV} COMMENTS DATE | DRWN ADDRESS PROJECT NORTH | SHEET No.
DA DRAWINGS —_|30/07/19]_ EJ LoT:/102 SP287641
O6
O4
PH: O07 5552 1300 FAX: 07 5552 1399
Email: [email protected]
Website: www.PalmLakeResort.com.au
UY
Used in these records
Attachment B - Proposal Plans (002).pdfRelated documentApplication case desk ↗
About this file
- File size