Original source · versioned page text
Site Management Plan 2015
Attached to the e-mail MCU14/0096 Applicants Response to SARA's Information Request.
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn10 Site Environmental Impact Having extensive experience with RAS in the past we have created detailed management practices for both onsite and offsite to prevent any impact on the surrounding environment. Being a closed system we are able to closely monitor the environment the fish live in so when a problem is foreseen by our monitoring system and testing practices we can put our management practices into action to prevent any water quality issues before they affect the environment the fish live in. Our surrounding environment is protected by close monitoring of out discharge water which allows us to control the quantity and quality of the waste being discharged. Our waste management practices allows us to keep any possible contaminates contained within our concrete lined facility where it can be dealt with quickly and safely.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.