Original source · versioned page text
6.5.22 - 60 Glenridge Drive Cooroibah Effluent Disposal Report-B
EFFLUENT LOADING RATE
4.1 Introduction
For this report we will use a of a four-bedroom house, each dwelling will
discharge to a 4000 litre all purpose septic tank and discharge to 90m² of and
Advanced Enviro-septic disposal area.
ON-SITE DISPOSAL SYSTEM
5.1 Introduction
The on-site sewerage treatment for this site will need to be an Secondary
Treatment Quality.
5.2 Effluent Treatment & Disposal
Using the 4-bedroom model for 6 persons at 150 litre per day will deliver 900
litres per day. This amount of effluent is to discharge to 90m² of effluent disposal
area if the land application area. The new effluent disposal area will be a AES Bed.
This bed will be within the building envelop. with the compliant set back distances
from AS 1547-2012 and stated in section 3 of this report.
Attached in this report is a demonstration of the purpose method and location of
the disposal area.
The AES effluent disposal system can produce Advance Secondary Quality Effluent
with a 10m set back distance from any water course.
tel 4125 3510 mob 0414 953 963 email [email protected] Water Wise Design | Chris Searle | 6 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.