Council archive · source document
DNRM (DERM) Advice Agency Response - 132007.738.01
\.
DNRM Permit number: CA0612NAM0016
CONDITIONS
The Department recommends that the following conditions be attached to any development approval:
1. All material excavated on-sites should be treated with 30kg/m3 of agricultural lime in line with
the recommendations of the 2003 Golder Associates ASS investigation.
2. Placement of fill must not result in displacement and oxidation of underlying ASS. Hydraulic
displacement (e.g. mud wave) and slippage failures are caused by excessive or inappropriate
loading on top of soft sediments. The applicant is to provide adequate detail to the
assessment manager confirming that loading forces on underlying sediments have been
considered and are unlikely to result in failure and oxidation of ASS.
3. Acid sulfate soil materials must not be used as fill unless properly treated. The applicant is to
provide adequate detail to the assessment manager confirming that all materials to be used
for filling are non-ASS, or ASS materials that have been fully treated and verified.
The Department further recommends that the above conditions be addressed prior to development
commencing and suggests that the compliance stage of IDAS provides a suitable process for
ensuring the technical reports are in accordance with SPP 2/02.
END OF CONDITIONS
Page 3 of 3 Department of Natural Resources and Mines
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
DNRM (DERM) Advice Agency Response - 132007.738.01Related documentApplication case desk ↗
About this file
- File size
- 241 KB (small file)
- File type
No other editions are linked here.