MCU16/0079 Appendix E - Traffic Impact Assessment
Tewantin Noosa RSL – Stage 4, 5 & 6
Traffic Impact Assessment
3.3 CURTESY BUS PATRONAGE DATA
The RSL owns and operates three (3) curtesy buses. The RSL has provided detailed patronage data for a
23-month period ending May 2016. Key findings from a review of this data are summarised below:
on average, 8.2% of patrons arrived at the RSL via the curtesy bus;
Friday and Saturday are typically the busiest days of the week for the curtesy buses;
on the corresponding Friday last year (19th June 2016), 13.9% arrived via the curtesy bus; and
on the corresponding Saturday last year (20th June 2016), 11.8% arrived via the curtesy bus.
3.4 ESTIMATION OF FUTURE PARKING DEMANDS
We have considered two (2) methodologies to estimate parking requirements for the expansion, including:
interpolation based on the existing off-street parking supply rate; and
interpolation based on the surveyed off-street parking demand rate.
3.4.1 Based on Existing Off-Street Parking Supply Rate
Based on the existing total use area (1,957.84m²) and existing off-street parking supply (86 spaces) we
estimate an existing parking supply rate of 4.39 spaces/100m² of TUA. As highlighted in Table 3.1, applying
this rate to the proposed TUA for Stage 6 would warrant a total of 128 off-street car parking spaces, which
equates to a shortfall of five (5) spaces compared to what is currently proposed.
Table 3.1: Parking Supply Estimation based on Existing Off-Street Parking Supply Rate
Existing
Supply
Proposed Existing Required
Total Use Parking Rate Difference
Development Parking Supply Parking
Area (m²) (spaces/100m² (Spaces)
(spaces) (spaces) (spaces)
Total Use
Area)
Existing 1,957.84 86 86 4.39 86 0
Stage 4 2,549.61 124 4.39 112 12
Stage 5 2,620.21 123 4.39 116 7
Stage 6 2,898.11 123 4.39 128 -5
Net Increase 940.27 (48%) 37 (43%) 42 (49%) -5
3.4.2 Based on Surveyed Off-Street Parking Demand Rate
Based on the existing total use area (1,957.84m²) and the surveyed peak off-street parking demand (80
cars) we estimate an existing parking demand rate of 4.09 spaces/100m² of TUA. As highlighted in Table
3.2, applying this rate to the proposed TUA for Stage 6 would warrant a total of 119 off-street car parking
spaces, which equates to a surplus of four (4) spaces compared to what is currently proposed.
Table 3.2: Parking Supply Estimation based on Existing Off-Street Parking Demand Rate
Existing
Supply
Proposed Existing Required
Total Use Parking Rate Difference
Development Parking Supply Parking
Area (m²) (spaces/100m² (Spaces)
(spaces) (spaces) (spaces)
Total Use
Area)
Existing 1,957.84 86 80 4.09 80 6
Stage 4 2,549.61 124 4.09 105 19
Stage 5 2,620.21 123 4.09 108 15
Stage 6 2,898.11 123 4.09 119 4
Net Increase 940.27 (48%) 37 (43%) 39 (49%)
Project No: P2623 Version: 002 Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (MCU16_0079 Appendix E - Traffic Impact Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.