MCU16/0079 Appendix E - Traffic Impact Assessment

of 68

Page text read automatically using OCR, there may be inaccuracies

Tewantin Noosa RSL – Stage 4, 5 & 6
Traffic Impact Assessment


3.3         CURTESY BUS PATRONAGE DATA
            The RSL owns and operates three (3) curtesy buses. The RSL has provided detailed patronage data for a
            23-month period ending May 2016. Key findings from a review of this data are summarised below:
                on average, 8.2% of patrons arrived at the RSL via the curtesy bus;
                Friday and Saturday are typically the busiest days of the week for the curtesy buses;
                on the corresponding Friday last year (19th June 2016), 13.9% arrived via the curtesy bus; and
                on the corresponding Saturday last year (20th June 2016), 11.8% arrived via the curtesy bus.

3.4         ESTIMATION OF FUTURE PARKING DEMANDS
            We have considered two (2) methodologies to estimate parking requirements for the expansion, including:
                interpolation based on the existing off-street parking supply rate; and
                interpolation based on the surveyed off-street parking demand rate.

3.4.1       Based on Existing Off-Street Parking Supply Rate
            Based on the existing total use area (1,957.84m²) and existing off-street parking supply (86 spaces) we
            estimate an existing parking supply rate of 4.39 spaces/100m² of TUA. As highlighted in Table 3.1, applying
            this rate to the proposed TUA for Stage 6 would warrant a total of 128 off-street car parking spaces, which
            equates to a shortfall of five (5) spaces compared to what is currently proposed.
            Table 3.1:            Parking Supply Estimation based on Existing Off-Street Parking Supply Rate
                                                                               Existing
                                                                               Supply
                                                 Proposed     Existing                      Required
                                  Total Use                                  Parking Rate                  Difference
            Development                           Parking      Supply                        Parking
                                  Area (m²)                                 (spaces/100m²                   (Spaces)
                                                 (spaces)     (spaces)                      (spaces)
                                                                              Total Use
                                                                                Area)
                Existing          1,957.84            86         86              4.39           86                0
                Stage 4           2,549.61           124                         4.39          112                12
                Stage 5           2,620.21           123                         4.39          116                7
                Stage 6           2,898.11           123                         4.39          128                -5
             Net Increase       940.27 (48%)      37 (43%)                                  42 (49%)              -5

3.4.2       Based on Surveyed Off-Street Parking Demand Rate
            Based on the existing total use area (1,957.84m²) and the surveyed peak off-street parking demand (80
            cars) we estimate an existing parking demand rate of 4.09 spaces/100m² of TUA. As highlighted in Table
            3.2, applying this rate to the proposed TUA for Stage 6 would warrant a total of 119 off-street car parking
            spaces, which equates to a surplus of four (4) spaces compared to what is currently proposed.
            Table 3.2:            Parking Supply Estimation based on Existing Off-Street Parking Demand Rate
                                                                               Existing
                                                                               Supply
                                                 Proposed     Existing                      Required
                                  Total Use                                  Parking Rate                  Difference
            Development                           Parking      Supply                        Parking
                                  Area (m²)                                 (spaces/100m²                   (Spaces)
                                                 (spaces)     (spaces)                      (spaces)
                                                                              Total Use
                                                                                Area)
                Existing          1,957.84            86         80              4.09           80                6
                Stage 4           2,549.61           124                         4.09          105                19
                Stage 5           2,620.21           123                         4.09          108                15
                Stage 6           2,898.11           123                         4.09          119                4
             Net Increase       940.27 (48%)      37 (43%)                                  39 (49%)


 Project No: P2623                             Version: 002                                                               Page 6

Log in to download the original (MCU16_0079 Appendix E - Traffic Impact Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.