Skip to the record
The only place to find full transcripts.

Original source · versioned page text

MCU16/0079 Appendix E - Traffic Impact Assessment

of 68

Page text read automatically using OCR, there may be inaccuracies

                                                                                                                                                                                                                                           D




                                                                                                                                                                                                                                                  STREET
                4.91
                                                                                                                                                                                                                                    B




       0.92     2.80

B85                             meters




                                                                                                                                                                                                                                                  DOONELLA
Width                          : 1.87
Track                          : 1.77
Lock to Lock Time              : 6.0
Steering Angle                 : 38.5
                    5.20




       0.95     3.05

B99                             meters
Width                           : 1.94
Track                           : 1.84
Lock to Lock Time               : 6.0
Steering Angle                  : 38.0

DESIGN VEHICLE



BITZIOS
                                                                                                                                                                                   Project                         Title                              Design           Drawn          Checked

                                         Gold Coast                                  Brisbane                                        Sydney                                                                                                             S.T              S.T           D.S
                                         Suite 26, 58 Riverwalk Avenue, Robina QLD   Level 2, 428 Upper Edward Street, Spring Hill   Studio 203, 3 Gladstone Street, Newtown NSW         Tewantin, Noosa RSL                                                                          Date
                                         4226.                                       4000.                                           2042.
                                                                                                                                                                                                                           B85 Entry & B99 Exit
                                                                                                                                                                                                 Stage 4                                                       CONCEPT ONLY            20.06.2016
                                         P: (07) 5562-5377                           P: (07) 3831-4442                               P: (02) 9557 6202                                                                        Swept Paths
                           consulting    W: www.bitziosconsulting.com.au             E: [email protected]
                                                                                                                                                                                       Traffic Impact Assessment                                      Project Number   Sheet Number   Issue


traffic                    transport                                                                                                                                                                                                                    P2623           003             B
engineering                planning

Log in to download the original (MCU16_0079 Appendix E - Traffic Impact Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.