Revised Proposal Plans · MCU13/0261
Attached to the e-mail MCU13/0261 - Response to Information Request - 5 Stevens Street Sunshine Beach.
Plans and drawings: the text below has words only, no drawings.
Original PDF page 3, section 1. The text section number identifies this passage in the reader.
designers
PO Box 262
Noosa Heads QLD 4567
Telephone 07 5447 5633
[email protected]
www.kiddco.com.au
1. FALLS, SLIPS, TRIPS 2. FALLING OBJECTS 5. MANUAL TASKS 7. CONFINED SPACES This drawing is to be read in
conjunction with Engineers Drawings &
LOOSE MATERIALS OR SMALL OBJECTS Components within this design with a mass in excess of 25kg EXCAVATION Reports
a) WORKING AT HEIGHTS should be lifted by two or more workers or by mechanical lifting
Construction, maintenance or demolition work on or around this Construction of this building and some maintenance on the
DURING CONSTRUCTION building is likely to involve persons working above ground level or device. Where this is not practical, suppliers or fabricators should building will require excavation and installation of items within Construction to comply
Wherever possible, components for this building should be above floor levels. Where this occurs one or more of the following be required to limit the component mass. excavations. Where practical, installation should be carried out with all relevant SAA &
prefabricated off-site or at ground level to minimise the risk of measures should be taken to avoid objects falling from the area All material packaging, building and maintenance components using methods which do not require workers to enter the BCA Codes & standard
workers falling more than two metres. However, construction of this where the work is being carried out onto persons below. should clearly show the total mass of packages and where excavation. Where this is not practical, adequate support for the Bldg By-law 1975 & as
building will require workers to be working at heights where a fall in 1. Prevent or restrict access to areas below where the work is practical all items should be stored on site in a way which excavated area should be provided to prevent collapse. Warning amended
excess of two metres is possible and injury is likely to result from such being carried out. minimises bending before lifting. Advice should be provided on signs and barriers to prevent accidental or unauthorised access to Verify all dimensions on
a fall. The builder should provide a suitable barrier wherever a 2. Provide toeboards to scaffolding or work platforms. safe lifting methods in all areas where lifting may occur. all excavations should be provided. site prior to commencement
person is required to work in a situation where falling more than 3. Provide protective structure below the work area. Construction, maintenance and demolition of this building will of any works. These
two metres is a possibility. 4. Ensure that all persons below the work area have Personal require the use of portable tools and equipment. These should be ENCLOSED SPACES
For buildings with enclosed spaces where maintenance or other drawings are not to be
Protective Equipment (PPE). fully maintained in accordance with manufacturer’s used for scaling
DURING OPERATION OR MAINTENANCE access may be required:
For houses or other low-rise buildings where scaffolding is specifications and not used where faulty or (in the case of Copyright for design &
BUILDING COMPONENTS Enclosed spaces within this building may present a risk to persons
appropriate: electrical equipment) not carrying a current electrical safety tag. drawings remain the
During construction, renovation or demolition of this building, parts of entering for construction, maintenance or any other purpose. The
Cleaning and maintenance of windows, walls, roof or other All safety guards or devices should be regularly checked and property of the authors.
the structure including fabricated steelwork, heavy panels and many design documentation calls for warning signs and barriers to
components of this building will require persons to be situated Personal Protective Equipment should be used in accordance CONSULTANTS
other components will remain standing prior to or after supporting unauthorised access. These should be maintained throughout the
where a fall from a height in excess of two metres is possible. Where with manufacturer’s specification.
life of the building. Where workers are required to enter enclosed
parts are in place. Contractors should ensure that temporary bracing Structural Engineers
this type of activity is required, scaffolding, ladders or trestles should spaces, air testing equipment and Personal Protective Equipment
or other required support is in place at all times when collapse which SCG Consulting Engineers
be used in accordance with relevant codes of practice,
regulations or legislation.
may injure persons in the area is a possibility. 6. HAZARDOUS SUBSTANCES should be provided. Contact: Sean Richardson
ASBESTOS SMALL SPACES Phone: (07) 5455 5604
For buildings where scaffold, ladders, trestles are not appropriate: For buildings with small spaces where maintenance or other access
Mechanical lifting of materials and components during construction, For alterations to a building constructed prior to 1990: Surveyor
Cleaning and maintenance of windows, walls, roof or other may be required:
maintenance or demolition presents a risk of falling objects. If this existing building was constructed prior to: Max Watterson & Associates
components of this building will require persons to be situated Some small spaces within this building will require access by
Contractors should ensure that appropriate lifting devices are used, 1990 - it therefore may contain asbestos Contact: Max Watterson
where a fall from a height in excess of two metres is possible. Where construction or maintenance workers. The design documentation Phone: (07) 5442 6121
that loads are properly secured and that access to areas below the 1986 - it therefore is likely to contain asbestos
this type of activity is required, scaffolding, fall barriers or Personal calls for warning signs and barriers to unauthorised access. These
load is prevented or restricted. either in cladding material or in fire retardant insulation material. In Private Certifier
Protective Equipment (PPE) should be used in accordance with should be maintained throughout the life of the building. Where
either case, the builder should check and, if necessary, take Suncoast Building Approvals
relevant codes of practice, regulations or legislation. 3. TRAFFIC MANAGEMENT appropriate action before demolishing, cutting, sanding, drilling or
workers are required to enter small spaces they should be Phone: (07) 5443 7288
For building on a major road, narrow road or steeply sloping road: scheduled so that access is for short periods. Manual lifting and
b) SLIPPERY OR UNEVEN SURFACES otherwise disturbing the existing structure. Hydraulic Engineer
Parking of vehicles or loading/unloading of vehicles on this roadway other manual activity should be restricted in small spaces.
POWDERED MATERIALS SCG Consulting Engineers
FLOOR FINISHES Specified may cause a traffic hazard. During construction, maintenance or
If finishes have been specified by designer, these have been demolition of this building designated parking for workers and loading
Many materials used in the construction of this building can cause 8. PUBLIC ACCESS Contact: Sean Richardson
harm if inhaled in powdered form. Persons working on or in the Phone: (07) 5455 5604
Public access to construction and demolition sites and to areas
selected to minimise the risk of floors and paved areas becoming areas should be provided. Trained traffic management personnel building during construction, operational maintenance or demolition under maintenance causes risk to workers and public. Warning Landscape Architect
slippery when wet or when walked on with wet shoes/feet. Any should be responsible for the supervision of these areas. should ensure good ventilation and wear Personal Protective Seed Landscape Architects
signs and secure barriers to unauthorised access should be
changes to the specified finish should be made in consultation with For building where on-site loading/unloading is restricted: Equipment including protection against inhalation while using Phone: (07) 3217 6491
provided. Where electrical installations, excavations, plant or loose
the designer or, if this is not practical, surfaces with an equivalent or Construction of this building will require loading and unloading of powdered material or when sanding, drilling, cutting or otherwise materials are present they should be secured when not fully
better slip resistance should be chosen. materials on the roadway. Deliveries should be well planned to avoid disturbing or creating powdered material. supervised.
FLOOR FINISHES By Owner congestion of loading areas and trained traffic management
personnel should be used to supervise loading/unloading areas. TREATED TIMBER
If designer has not not been involved in the selection of surface
For all buildings: The design of this building may include provision for the inclusion of 9. OPERATIONAL USE OF BUILDING
finishes, the owner is responsible for the selection of surface finishes
in the pedestrian trafficable areas of this building. Surfaces should Busy construction and demolition sites present a risk of collision where treated timber within the structure. Dust or fumes from this material RESIDENTIAL BUILDINGS
be selected in accordance with AS HB 197:1999 and AS/NZ deliveries and other traffic are moving within the site. A traffic can be harmful. Persons working on or in the building during This building has been designed as a residential building. If it, at a
4586:2004. management plan supervised by trained traffic management construction, operational maintenance or demolition should ensure later date, it is used or intended to be used as a workplace, the
STEPS, LOOSE OBJECTS AND UNEVEN SURFACES personnel should be adopted for the work site. good ventilation and wear Personal Protective Equipment including provisions of the Work Health and Safety Act 2011 or subsequent
Due to design restrictions for this building, steps and/or ramps are protection against inhalation of harmful material when sanding, replacement Act should be applied to the new use.
included in the building which may be a hazard to workers carrying 4. SERVICES drilling, cutting or using treated timber in any way that may cause
harmful material to be released. Do not burn treated timber.
objects or otherwise occupied. Steps should be clearly marked with GENERAL 10.OTHER HIGH RISK ACTIVITY
both visual and tactile warning during construction, maintenance, Rupture of services during excavation or other activity creates a VOLATILE ORGANIC COMPOUNDS All electrical work should be carried out in accordance with Code
demolition and at all times when the building operates as a variety of risks including release of hazardous material. Existing Many types of glue, solvents, spray packs, paints, varnishes and of Practice: Managing Electrical Risks at the Workplace, AS/NZ
workplace. services are located on or around this site. Where known, these are some cleaning materials and disinfectants have dangerous 3012 and all licensing requirements.
Building owners and occupiers should monitor the pedestrian identified on the plans but the exact location and extent of emissions. Areas where these are used should be kept well All work using Plant should be carried out in accordance with
access ways and in particular access to areas where maintenance services may vary from that indicated. Services should be located ventilated while the material is being used and for a period after Code of Practice: Managing Risks of Plant at the Workplace.
is routinely carried out to ensure that surfaces have not moved or using an appropriate service (such as Dial Before You Dig), installation. Personal Protective Equipment may also be required. All work should be carried out in accordance with Code of
cracked so that they become uneven and present a trip hazard. appropriate excavation practice should be used and, where The manufacturer’s recommendations for use must be carefully Practice: Managing Noise and Preventing Hearing Loss at Work.
Spills, loose material, stray objects or any other matter that may necessary, specialist contractors should be used. considered at all times. Due to the history of serious incidents it is recommended that
cause a slip or trip hazard should be cleaned or removed from Locations with underground power: particular care be exercised when undertaking work involving steel
access ways. Underground power lines MAY be located in or around this site. All SYNTHETIC MINERAL FIBRE
Fibreglass, rockwool, ceramic and other material used for thermal or construction and concrete placement. All the above applies.
Contractors should be required to maintain a tidy work site during underground power lines must be disconnected or carefully
construction, maintenance or demolition to reduce the risk of trips located and adequate warning signs used prior to any sound insulation may contain synthetic mineral fibre which may be
and falls in the workplace. Materials for construction or construction, maintenance or demolition commencing. harmful if inhaled or if it comes in contact with the skin, eyes or other THESE NOTES MUST BE READ AND UNDERSTOOD
maintenance should be stored in designated areas away from sensitive parts or the body. Personal Protective Equipment including
access ways and work areas.
Locations with overhead power lines:
protection against inhalation of harmful material should be used when BY ALL INVOLVED IN THE PROJECT.
Overhead power lines MAY be near or on this site. These pose a risk
of electrocution if struck or approached by lifting devices or other installing, removing or working near bulk insulation material.
plant and persons working above ground level. Where there is a TIMBER FLOORS THIS INCLUDES (but is not excluded to):
danger of this occurring, power lines should be, where practical, This building may contain timber floors which have an applied finish. OWNER, BUILDER, SUB-CONTRACTORS,
disconnected or relocated. Where this is not practical adequate Areas where finishes are applied should be kept well ventilated during
warning in the form of bright coloured tape or signage should be sanding and application and for a period after installation. Personal
CONSULTANTS, RENOVATORS, OPERATORS,
Issue for Information 22/01/14
used or a protective barrier provided. Protective Equipment may also be required. The manufacturer’s MAINTAINERS, DEMOLISHERS.
recommendations for use must be carefully considered at all times.
Project
PROPOSED DUPLEX
Location
5 STEVENS STREET
SUNSHINE BEACH
Client
PILCHER + STAY
Drawing Title
WHS NOTES
Scale Date
as shown @A2 NOV 13
Drawn By Job No:
DDT 1306
Drawing No. Issue No.
WD.103 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Revised Proposal Plans.PDFRelated documentApplication case desk ↗
About this file
- File size
- 3.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.