Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Revised Proposal Plans · MCU13/0261

Attached to the e-mail MCU13/0261 - Response to Information Request - 5 Stevens Street Sunshine Beach.

of 13

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 3, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                                                                                                                                                                         designers
                                                                                                                                                                                                                                                                                                                     PO Box 262
                                                                                                                                                                                                                                                                                                                     Noosa Heads QLD 4567
                                                                                                                                                                                                                                                                                                                     Telephone            07 5447 5633

                                                                                                                                                                                                                                                                                                                     [email protected]

                                                                                                                                                                                                                                                                                                                     www.kiddco.com.au

1. FALLS, SLIPS, TRIPS                                                         2. FALLING OBJECTS                                                           5. MANUAL TASKS                                                               7. CONFINED SPACES                                                         This drawing is to be read in
                                                                                                                                                                                                                                                                                                                     conjunction with Engineers Drawings &
                                                                                 LOOSE MATERIALS OR SMALL OBJECTS                                             Components within this design with a mass in excess of 25kg                   EXCAVATION                                                               Reports
a) WORKING AT HEIGHTS                                                                                                                                         should be lifted by two or more workers or by mechanical lifting
                                                                                 Construction, maintenance or demolition work on or around this                                                                                             Construction of this building and some maintenance on the
  DURING CONSTRUCTION                                                            building is likely to involve persons working above ground level or          device. Where this is not practical, suppliers or fabricators should          building will require excavation and installation of items within        Construction to comply
  Wherever possible, components for this building should be                      above floor levels. Where this occurs one or more of the following           be required to limit the component mass.                                      excavations. Where practical, installation should be carried out         with all relevant SAA &
  prefabricated off-site or at ground level to minimise the risk of              measures should be taken to avoid objects falling from the area              All material packaging, building and maintenance components                   using methods which do not require workers to enter the                  BCA Codes & standard
  workers falling more than two metres. However, construction of this            where the work is being carried out onto persons below.                      should clearly show the total mass of packages and where                      excavation. Where this is not practical, adequate support for the        Bldg By-law 1975 & as
  building will require workers to be working at heights where a fall in         1. Prevent or restrict access to areas below where the work is               practical all items should be stored on site in a way which                   excavated area should be provided to prevent collapse. Warning           amended
  excess of two metres is possible and injury is likely to result from such          being carried out.                                                       minimises bending before lifting. Advice should be provided on                signs and barriers to prevent accidental or unauthorised access to       Verify all dimensions on
  a fall. The builder should provide a suitable barrier wherever a               2. Provide toeboards to scaffolding or work platforms.                       safe lifting methods in all areas where lifting may occur.                    all excavations should be provided.                                      site prior to commencement
  person is required to work in a situation where falling more than              3. Provide protective structure below the work area.                         Construction, maintenance and demolition of this building will                                                                                         of any works. These
  two metres is a possibility.                                                   4. Ensure that all persons below the work area have Personal                 require the use of portable tools and equipment. These should be              ENCLOSED SPACES
                                                                                                                                                                                                                                            For buildings with enclosed spaces where maintenance or other            drawings are not to be
                                                                                     Protective Equipment (PPE).                                              fully maintained in accordance with manufacturer’s                                                                                                     used for scaling
  DURING OPERATION OR MAINTENANCE                                                                                                                                                                                                           access may be required:
  For houses or other low-rise buildings where scaffolding is                                                                                                 specifications and not used where faulty or (in the case of                                                                                            Copyright for design &
                                                                                 BUILDING COMPONENTS                                                                                                                                        Enclosed spaces within this building may present a risk to persons
  appropriate:                                                                                                                                                electrical equipment) not carrying a current electrical safety tag.                                                                                    drawings remain the
                                                                                 During construction, renovation or demolition of this building, parts of                                                                                   entering for construction, maintenance or any other purpose. The
  Cleaning and maintenance of windows, walls, roof or other                                                                                                   All safety guards or devices should be regularly checked and                                                                                           property of the authors.
                                                                                 the structure including fabricated steelwork, heavy panels and many                                                                                        design documentation calls for warning signs and barriers to
  components of this building will require persons to be situated                                                                                             Personal Protective Equipment should be used in accordance                                                                                             CONSULTANTS
                                                                                 other components will remain standing prior to or after supporting                                                                                         unauthorised access. These should be maintained throughout the
  where a fall from a height in excess of two metres is possible. Where                                                                                       with manufacturer’s specification.
                                                                                                                                                                                                                                            life of the building. Where workers are required to enter enclosed
                                                                                 parts are in place. Contractors should ensure that temporary bracing                                                                                                                                                                Structural Engineers
  this type of activity is required, scaffolding, ladders or trestles should                                                                                                                                                                spaces, air testing equipment and Personal Protective Equipment
                                                                                 or other required support is in place at all times when collapse which                                                                                                                                                              SCG Consulting Engineers
  be used in accordance with relevant codes of practice,
  regulations or legislation.
                                                                                 may injure persons in the area is a possibility.                           6. HAZARDOUS SUBSTANCES                                                         should be provided.                                                      Contact: Sean Richardson
                                                                                                                                                              ASBESTOS                                                                      SMALL SPACES                                                             Phone: (07) 5455 5604
  For buildings where scaffold, ladders, trestles are not appropriate:                                                                                                                                                                      For buildings with small spaces where maintenance or other access
                                                                                 Mechanical lifting of materials and components during construction,          For alterations to a building constructed prior to 1990:                                                                                               Surveyor
  Cleaning and maintenance of windows, walls, roof or other                                                                                                                                                                                 may be required:
                                                                                 maintenance or demolition presents a risk of falling objects.                If this existing building was constructed prior to:                                                                                                    Max Watterson & Associates
  components of this building will require persons to be situated                                                                                                                                                                           Some small spaces within this building will require access by
                                                                                 Contractors should ensure that appropriate lifting devices are used,         1990 - it therefore may contain asbestos                                                                                                               Contact: Max Watterson
  where a fall from a height in excess of two metres is possible. Where                                                                                                                                                                     construction or maintenance workers. The design documentation            Phone: (07) 5442 6121
                                                                                 that loads are properly secured and that access to areas below the           1986 - it therefore is likely to contain asbestos
  this type of activity is required, scaffolding, fall barriers or Personal                                                                                                                                                                 calls for warning signs and barriers to unauthorised access. These
                                                                                 load is prevented or restricted.                                             either in cladding material or in fire retardant insulation material. In                                                                               Private Certifier
  Protective Equipment (PPE) should be used in accordance with                                                                                                                                                                              should be maintained throughout the life of the building. Where
                                                                                                                                                              either case, the builder should check and, if necessary, take                                                                                          Suncoast Building Approvals
  relevant codes of practice, regulations or legislation.                      3. TRAFFIC MANAGEMENT                                                          appropriate action before demolishing, cutting, sanding, drilling or
                                                                                                                                                                                                                                            workers are required to enter small spaces they should be                Phone: (07) 5443 7288
                                                                                 For building on a major road, narrow road or steeply sloping road:                                                                                         scheduled so that access is for short periods. Manual lifting and
b) SLIPPERY OR UNEVEN SURFACES                                                                                                                                otherwise disturbing the existing structure.                                                                                                           Hydraulic Engineer
                                                                                 Parking of vehicles or loading/unloading of vehicles on this roadway                                                                                       other manual activity should be restricted in small spaces.
                                                                                                                                                              POWDERED MATERIALS                                                                                                                                     SCG Consulting Engineers
  FLOOR FINISHES Specified                                                       may cause a traffic hazard. During construction, maintenance or
  If finishes have been specified by designer, these have been                   demolition of this building designated parking for workers and loading
                                                                                                                                                              Many materials used in the construction of this building can cause          8. PUBLIC ACCESS                                                           Contact: Sean Richardson
                                                                                                                                                              harm if inhaled in powdered form. Persons working on or in the                                                                                         Phone: (07) 5455 5604
                                                                                                                                                                                                                                            Public access to construction and demolition sites and to areas
  selected to minimise the risk of floors and paved areas becoming               areas should be provided. Trained traffic management personnel               building during construction, operational maintenance or demolition           under maintenance causes risk to workers and public. Warning             Landscape Architect
  slippery when wet or when walked on with wet shoes/feet. Any                   should be responsible for the supervision of these areas.                    should ensure good ventilation and wear Personal Protective                                                                                            Seed Landscape Architects
                                                                                                                                                                                                                                            signs and secure barriers to unauthorised access should be
  changes to the specified finish should be made in consultation with            For building where on-site loading/unloading is restricted:                  Equipment including protection against inhalation while using                                                                                          Phone: (07) 3217 6491
                                                                                                                                                                                                                                            provided. Where electrical installations, excavations, plant or loose
  the designer or, if this is not practical, surfaces with an equivalent or      Construction of this building will require loading and unloading of          powdered material or when sanding, drilling, cutting or otherwise             materials are present they should be secured when not fully
  better slip resistance should be chosen.                                       materials on the roadway. Deliveries should be well planned to avoid         disturbing or creating powdered material.                                     supervised.
  FLOOR FINISHES By Owner                                                        congestion of loading areas and trained traffic management
                                                                                 personnel should be used to supervise loading/unloading areas.               TREATED TIMBER
  If designer has not not been involved in the selection of surface
                                                                                 For all buildings:                                                           The design of this building may include provision for the inclusion of      9. OPERATIONAL USE OF BUILDING
  finishes, the owner is responsible for the selection of surface finishes
  in the pedestrian trafficable areas of this building. Surfaces should          Busy construction and demolition sites present a risk of collision where     treated timber within the structure. Dust or fumes from this material         RESIDENTIAL BUILDINGS
  be selected in accordance with AS HB 197:1999 and AS/NZ                        deliveries and other traffic are moving within the site. A traffic           can be harmful. Persons working on or in the building during                  This building has been designed as a residential building. If it, at a
  4586:2004.                                                                     management plan supervised by trained traffic management                     construction, operational maintenance or demolition should ensure             later date, it is used or intended to be used as a workplace, the
  STEPS, LOOSE OBJECTS AND UNEVEN SURFACES                                       personnel should be adopted for the work site.                               good ventilation and wear Personal Protective Equipment including             provisions of the Work Health and Safety Act 2011 or subsequent
  Due to design restrictions for this building, steps and/or ramps are                                                                                        protection against inhalation of harmful material when sanding,               replacement Act should be applied to the new use.
  included in the building which may be a hazard to workers carrying           4. SERVICES                                                                    drilling, cutting or using treated timber in any way that may cause
                                                                                                                                                              harmful material to be released. Do not burn treated timber.
  objects or otherwise occupied. Steps should be clearly marked with             GENERAL                                                                                                                                                  10.OTHER HIGH RISK ACTIVITY
  both visual and tactile warning during construction, maintenance,              Rupture of services during excavation or other activity creates a            VOLATILE ORGANIC COMPOUNDS                                                    All electrical work should be carried out in accordance with Code
  demolition and at all times when the building operates as a                    variety of risks including release of hazardous material. Existing           Many types of glue, solvents, spray packs, paints, varnishes and              of Practice: Managing Electrical Risks at the Workplace, AS/NZ
  workplace.                                                                     services are located on or around this site. Where known, these are          some cleaning materials and disinfectants have dangerous                      3012 and all licensing requirements.
  Building owners and occupiers should monitor the pedestrian                    identified on the plans but the exact location and extent of                 emissions. Areas where these are used should be kept well                     All work using Plant should be carried out in accordance with
  access ways and in particular access to areas where maintenance                services may vary from that indicated. Services should be located            ventilated while the material is being used and for a period after            Code of Practice: Managing Risks of Plant at the Workplace.
  is routinely carried out to ensure that surfaces have not moved or             using an appropriate service (such as Dial Before You Dig),                  installation. Personal Protective Equipment may also be required.             All work should be carried out in accordance with Code of
  cracked so that they become uneven and present a trip hazard.                  appropriate excavation practice should be used and, where                    The manufacturer’s recommendations for use must be carefully                  Practice: Managing Noise and Preventing Hearing Loss at Work.
  Spills, loose material, stray objects or any other matter that may             necessary, specialist contractors should be used.                            considered at all times.                                                      Due to the history of serious incidents it is recommended that
  cause a slip or trip hazard should be cleaned or removed from                  Locations with underground power:                                                                                                                          particular care be exercised when undertaking work involving steel
  access ways.                                                                   Underground power lines MAY be located in or around this site. All           SYNTHETIC MINERAL FIBRE
                                                                                                                                                              Fibreglass, rockwool, ceramic and other material used for thermal or          construction and concrete placement. All the above applies.
  Contractors should be required to maintain a tidy work site during             underground power lines must be disconnected or carefully
  construction, maintenance or demolition to reduce the risk of trips            located and adequate warning signs used prior to any                         sound insulation may contain synthetic mineral fibre which may be
  and falls in the workplace. Materials for construction or                      construction, maintenance or demolition commencing.                          harmful if inhaled or if it comes in contact with the skin, eyes or other     THESE NOTES MUST BE READ AND UNDERSTOOD
  maintenance should be stored in designated areas away from                                                                                                  sensitive parts or the body. Personal Protective Equipment including
  access ways and work areas.
                                                                                 Locations with overhead power lines:
                                                                                                                                                              protection against inhalation of harmful material should be used when         BY ALL INVOLVED IN THE PROJECT.
                                                                                 Overhead power lines MAY be near or on this site. These pose a risk
                                                                                 of electrocution if struck or approached by lifting devices or other         installing, removing or working near bulk insulation material.
                                                                                 plant and persons working above ground level. Where there is a               TIMBER FLOORS                                                                 THIS INCLUDES (but is not excluded to):
                                                                                 danger of this occurring, power lines should be, where practical,            This building may contain timber floors which have an applied finish.         OWNER, BUILDER, SUB-CONTRACTORS,
                                                                                 disconnected or relocated. Where this is not practical adequate              Areas where finishes are applied should be kept well ventilated during
                                                                                 warning in the form of bright coloured tape or signage should be             sanding and application and for a period after installation. Personal
                                                                                                                                                                                                                                            CONSULTANTS, RENOVATORS, OPERATORS,
                                                                                                                                                                                                                                                                                                                     Issue for Information          22/01/14
                                                                                 used or a protective barrier provided.                                       Protective Equipment may also be required. The manufacturer’s                 MAINTAINERS, DEMOLISHERS.
                                                                                                                                                              recommendations for use must be carefully considered at all times.
                                                                                                                                                                                                                                                                                                                     Project
                                                                                                                                                                                                                                                                                                                     PROPOSED DUPLEX

                                                                                                                                                                                                                                                                                                                     Location
                                                                                                                                                                                                                                                                                                                     5 STEVENS STREET
                                                                                                                                                                                                                                                                                                                     SUNSHINE BEACH
                                                                                                                                                                                                                                                                                                                     Client
                                                                                                                                                                                                                                                                                                                     PILCHER + STAY
                                                                                                                                                                                                                                                                                                                     Drawing Title
                                                                                                                                                                                                                                                                                                                     WHS NOTES

                                                                                                                                                                                                                                                                                                                     Scale                       Date
                                                                                                                                                                                                                                                                                                                     as shown @A2 NOV 13
                                                                                                                                                                                                                                                                                                                     Drawn By                    Job No:
                                                                                                                                                                                                                                                                                                                     DDT                         1306
                                                                                                                                                                                                                                                                                                                     Drawing No.                 Issue No.

                                                                                                                                                                                                                                                                                                                     WD.103                        A

Used in these records

About this file

File size
3.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Revised Proposal Plans.PDF · 3.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.