ORDINARY MEETING AGENDA 19 JANUARY 2017
h. All primary stormwater quality treatment devices must be routinely
checked, serviced and cleaned in accordance with the manufacturer’s
recommendations. Records of all maintenance activities undertaken must
be kept for 5 years and made available to Council upon request.
i. The ongoing maintenance plan for the development must include the
operations and maintenance manual for the water quality device/s and
must include the full cost of maintaining the system. This maintenance plan
must be provided as part of the subsequent operational works
j. The development must not cause an increase in peak flow runoff in 1, 5,
50 or 100 ARI events. The subsequent application for operational works
must include calculations and designs to demonstrate how this condition is
achieved.
k. That water quality objectives are met in keeping with the Environmental
Protection (Water) Policy 2009 for Mary River Environmental Values and
Water Quality Objectives.
Stormwater Harvesting
28. Operating rainwater collection tanks must be provided as identified in section 4.2
of the Stormwater Management Plan For Highway Service Centre Cooroy,
project number 161968 by Covey Associates, dated October 2016. The tanks
must be provided in accordance with a Building Works approval for above ground
tanks, or operational works approval for below ground tanks and provide for re-
use of harvested rainwater for internal non-potable uses and outdoor uses.
29. Prior to commencement of use, certification must be submitted to Council from a
qualified person* which certifies that the rainwater collection tank/s and
associated reticulation has/have been installed in accordance with the
requirements of this Decision Notice.
*(Refer to Advisory Note)
ENVIRONMENTAL HEALTH
Development Code – Hazardous Industry
30. The design, specifications and construction of the Manifest Quantity Workplace
(MQW) storage and dispensing of petroleum products (Service Station) is to
comply in all respects with the Model Development Code for Hazardous
Industries and Chemicals - Workplace Health and Safety Queensland(WHSQ)
31. Certification must be provided to Council from a suitably qualified person* which
certifies that the design, construction, operation and safety of the MQW
(specifically including the design and operation of the stormwater quality
improvement device: treatment tank/Stormwater 360 pods filter cartridges &
detention tank) complies in all respects with the WHSQ Code prior to
commissioning the site.
A suitably qualified person* is a Registered Professional Engineer of Queensland
with experience and knowledge in the design and operation of the storage and
dispensing of petroleum products.
Environmental Protection – General Environmental Duty S319
32. A copy of this decision notice must be kept on site in a location readily accessible
to personnel carrying out this activity.
33. Notwithstanding any other condition of this decision notice, this notice does not
authorize any release of contaminants that cause or is likely to cause an
environmental nuisance beyond the boundary of the property.
Page 10 of 25