Original source · versioned page text
2017-01-19 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 19 JANUARY 2017
Stormwater Quality Improvement Device (SQUID)
64. All stormwater from UFAs must be captured and drained to the approved SQUID.
65. The SQUID (treatment tank/ Stormwater 360 pods filter cartridges & detention
tank) intended to be installed as part of the stormwater drainage system for the
UFA, must incorporate the following design measures as a minimum:
a. steel bars or trash gates with at least 20mm spacing;
b. filtration devices such as sand filters or gross pollutant traps capable of
removing litter (diameter greater than 5mm) and at least 70% of fine
sediments (>125µm).
c. a wastewater treatment device, such as an oil and hydrocarbon separator,
triple interceptor or equivalent, capable of removing droplets larger than
60µm (i.e. corresponding to outlet discharge of approximately 15mg/L) and
to a point where there is no visible sheen or odour on stormwater. This
device is to be able to meet these requirements during a storm up to the 2
year ARI-6 minute design rainfall event without surcharging or backing up
the drainage system.
d. flow cut-off valves are to be installed at the outlet from the separator to use
in case of an emergency or cleaning operations.
e. be maintained in accordance with the manufacturers recommendations.
f. be engineered to ventilate any likely hazchem vapour and make a safe
working environment in accordance with the Model Development Code for
Hazardous Industries and Chemicals - Workplace Health and Safety
Queensland.
Equipment Integrity Test (EIT) of UPSS
66. An EIT of the UPSS is to be conducted by a duly qualified person in accordance
with the manufacturer’s written instructions specific to the UPSS.
67. The EIT must be capable of detecting a leak of 0.38 litres per hour, with a
probability of detection of at least 95% and of false detection of 5% or less in
accordance with AS 4897–2008 – The design, installation and operation of
underground petroleum storage systems.
68. The EIT must be a nationally approved and certified method of testing that meets,
at a minimum, the requirements or certification standards of the United States
Environmental Protection Agency (USEPA 1990).
69. The EIT of the UPSS must be undertaken at the following times :
a. immediately before commissioning the new UPSS
b. immediately following any modification to the UPSS
c. immediately following installation of re-used equipment
d. immediately following any equipment retrofit
e. immediately following any repair to UPSS equipment
f. where the leak detection systems indicate failure
g. where there is only one method of leak detection system in use
h. where there is evidence of a leak
i. when requested by Council
Page 14 of 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.