Appendix D – Legal Review

Other Change to Development Permit
132008.299.01 (Additional 42 Beds)
14 & 16 Duke Street, Sunshine Beach Qld 4567
Lot 3 on SP228958 & Lot 5 on SP194338




Staley Family Trust
Full text of the other 13 pages

Page 2

Our Ref:        CE:LM:27263

5 August 2025

Philip and Linda Staley
16 Duke Street
SUNSHINE BEACH QLD 4567

By Email: [email protected] and [email protected]
Copy to: [email protected]

Dear Philip and Linda,

14 & 16 DUKE STREET, SUNSHINE BEACH – ADVICE RE: PROPOSED CHANGE
TO TOURIST ACCOMMODATION DEVELOPMENT

Thank you for instructing us to provide advice in relation to this matter.

Your town planner, Russell Green, has provided us with information and copies of documents,
relevant to the proposed changes to the ‘Dolphin Backpackers’ at 14 & 16 Duke Street, Sunshine
Beach.

For reference, the documents provided are listed below:

     1. Pre-Lodgement Meeting Notes (Council reference PLM25/0018) (PLM);

     2. Decision Notice for ‘Change to an Existing Approval’ dated 28 February 2012 (Council
        reference 132008.299.01), notifying of an approved change to the existing approval granted
        on 9 June 2009 (the Approval);

     3. approved plans of development for the Approval (the Approved Plans);

     4. plans for the proposed changes, prepared by Andrew Bock Architecture (the Proposal
        Plans).

We are instructed that:

    1. you are interested in replacing the existing residence on 16 Duke St (Lot 3 SP228958), with
       the building shown on the Proposal Plans to provide for 48 beds for ‘Hostel’
       accommodation;

Page 3

                                                                                       5 August 2025




   2. in response to issues raised during the PLM with Council, you are seeking our advice in
      relation to:

            a. whether the proposed changes can be lawfully sought through a change application
               to the Approval, or whether a new development application for a material change of
               use of premises would be required (or otherwise preferable);

            b. what legal arguments there are in support of seeking to make the proposed changes
               through an application to change the Approval, other than for minor changes
               (known as an ‘Other Change’ application), in preference to a new development
               application for a material change of use of premises;

            c. any other matters we consider would be relevant in assisting to gain approval for
               the proposed changes;

    3. as an alternative to seeking approval for a new building on Lot 3 (which is your preference),
       you understand it may be an option to renovate/extend the existing residence on Lot 3 to
       accommodate additional guest numbers, subject to a change to the Approval, should we
       consider this preferable/advantageous – in this case you also enquire how much of the
       existing residence could be kept for those purposes.

We have considered these matters and advise as follows.

RELEVANT FACTS: Approval and Proposed Changes

The Approval is a ‘Development Permit for Material Change of Use - Visitor Accommodation Type 4 –
Visitor Hostel’.

The Approval does not contain a development condition further describing the approved use.

The definitions below are extracted from the relevant planning scheme for the Approval (the Noosa
Plan 2006, version 1).

    •   Visitor accommodation means accommodation-that is designed and predominantly used for
        visitors to the Shire and where social, recreational and dining services may be provided for
        visitors by owners or staff. The term includes the following types:
                …
                Type 4 Conventional: Two or more dwelling units or accommodation units, for the
                purpose of providing short-term visitor accommodation. The use may include
                common recreation or dining facilities and includes an ancillary dwelling unit for
                onsite manager. The use includes a guesthouse, visitor hostel, motel, resort and
                serviced rooms, but does not include Visitor accommodation Type 1 Home hosted or
                Type 3 Rural as separately defined.
    •   Visitor hostel means a budget visitor accommodation building(s) which accommodate 6 or
        more unrelated persons with shared facilities including kitchen and laundry facilities.
        Sanitary and bathroom facilities as well as bedrooms may also be shared.
We note ‘Visitor hostel’ is not a defined use, but an administrative term under the Noosa Plan 2006.



                                                                                              Page 2

Page 4

                                                                                             5 August 2025




‘Visitor accommodation’ is the relevant use class, falling under ‘Residential uses’ (the ‘Primary Use’
for the purposes of the Noosa Plan 2006). For the approved use, the definitions of ‘Visitor
accommodation’ and ‘Type 4 Conventional’ are to be read together.

In 2012, the Approval was changed following an application to change the approval, which involved
changes to the building on Lot 3. In approving the change application, Council imposed Condition 38,
which provides:

        38. The total number of visitor accommodation guests is restricted to a maximum of 60 persons.

Reviewing the Approval Plans (for the Approval as changed in 2012) together with the previous plans
of development, the current approved development on Lot 3 includes three dorms, as we have
noted on the below extract of the ground floor plan:




You have instructed us that the three dorms are each ‘double rooms’, meaning the building on Lot 3
has capacity to accommodate a total of six visitor accommodation guests under the Approval (i.e.
excluding occupants of the manager’s residence).

In comparison, the Proposal Plans show a new building on Lot 3 that includes 12 dorms (6 over two
storeys) and is capable of accommodating a total of 48 visitor accommodation guests.

Subtracting the number of guests currently permitted to be accommodated in the building on Lot 3,
from the total number of guests proposed for the new building (i.e. 48-6), we understand the
proposal would cater for an additional 42 guests to be accommodated on Lot 3.

On that basis, we understand the proposed changes from the development shown on the Approved
Plans, involve (Proposed Changes):

    1. establishing a new visitor accommodation building on Lot 3;

                                                                                                     Page 3

Page 5

                                                                                            5 August 2025




    2. changes to carparking provision on Lot 3 (from 2 guest spaces to 4, and from double garage
       to 1 staff scape);
    3. reduction in area dedicated to a manager’s residence and decreased occupant capacity
       (from 3 bedrooms, shared bathroom, living/kitchen/dining room, manager’s office, staff
       room and balcony, home theatre and balcony, to 1 staff bedroom);
    4. increase in dorms, from 3 to 12;
    5. providing capacity to accommodate an additional 42 guests (for short-term accommodation
       catering to backpackers/tourists, consistent with existing operations on site), increasing the
       maximum capacity of the development (including as approved on Lot 5, 14 Duke Street) to
       102 visitor accommodation guests (from 60);
    6. associated changes to outdoor areas, including replacement of the pool in the north-eastern
       corner with a terrace;
    7. associated changes in built form and development footprint on Lot 3, including:
            a. reduced site coverage;
            b. reduced gross floor area;
            c. changes to setbacks (increased to the rear and to Duke St and Douglas St, reduced to
               the unconstructed road to the west/between Lot 3 and Lot 5);
            d. in parts, increased building height (noting the existing building on the Approved
               Plans does not have a complete second-storey).

LEGAL FRAMEWORK: seeking approval of Proposed Changes

The following application types under the Planning Act 2016 (the Act) are relevant to this advice:

    1. a development application made under s 50, for a development approval to carry out a
       ‘material change of use’ that is assessable development (MCU Application);
    2. an application to change a development approval under s 78, either for:
            a. a ‘minor change’ to the Approval (Minor Change application); or
            b. changes ‘other than’ a minor change, to the Approval (Other Change application).

The following definitions from schedule 2 of the Act are relevant:

    •   material change of use, of premises, means any of the following that a regulation made
        under section 284(2)(a) does not prescribe to be minor change of use—
            (a) the start of a new use of the premises;
            (b) the re-establishment on the premises of a use that has been abandoned;
            (c) a material increase in the intensity or scale of the use of the premises.

    •   minor change means a change that—
        …
           (b) for a development approval—
                     i. would not result in substantially different development; and


                                                                                                  Page 4

Page 6

                                                                                       5 August 2025




                    ii. if a development application for the development, including the change,
                        were made when the change application is made would not cause—
                           A. the inclusion of prohibited development in the application; or
                           B. referral to a referral agency, other than to the chief executive, if
                              there were no referral agencies for the development application; or
                           C. referral to extra referral agencies, other than to the chief executive;
                              or
                           D. a referral agency, in assessing the application under section 55(2), to
                              assess the application against, or have regard to, a matter, other
                              than a matter the referral agency must have assessed the
                              application against, or had regard to, when the application was
                              made; or
                           E. public notification if public notification was not required for the
                              development application.

The Act does not define ‘other change’, or ‘substantially different development’ for the purposes of
paragraph (b)(i) of the minor change definition.

Whether a proposed change would result in substantially different development, and therefore not
be a ‘minor change’, will turn on the facts and circumstances of each case. Below is an extract from
schedule 1 of the Development Assessment Rules (v.3), which provides guidance on what may be
considered to result in substantially different development.




                                                                                               Page 5

Page 7

                                                                                       5 August 2025




Assessment Frameworks – Minor Change Application v. Other Change Application

While a Minor Change Application and Other Change Application are both made under s 78 of the
Act, they differ in terms of application process, assessment framework and decision-making power.

For brevity, we provide the following simplistic overview/comparison between the change
application types:

   •   a Minor Change Application is not treated under the development assessment framework as
       if it were a development application made under s 51 of the Act (for the development
       including the proposed changes) – the application is administered, assessed and decided
       under ss 77-81B of the Act, and the planning instruments that were in effect at the time of
       the original development application are applied (though weight may be given to new or
       amended instruments, if appropriate in the context of the proposed changes);

   •   an Other Change Application is effectively treated under the development assessment
       framework as if it were a development application made under s 51 of the Act for the
       development including the proposed changes (notably, meaning public notification of the
       application is required in certain circumstances), though in the context of the Approval
       (discussed further below) – relevant planning instruments that are in effect at the time of
       the change application are applied, instead of the instruments that were in effect when the
       development application was made (e.g. a new planning scheme, superseding the planning
       scheme relevant to the approval).

APPLICATION OF LEGAL FRAMEWORK TO THE FACTS: appropriate application type for the
Proposed Changes

Minor Change application

Proposed Changes (as per Proposal Plans)

On a brief consideration of the matters listed in (b)(ii) of the minor change definition extracted
above, we do not consider these matters would apply as a result of the Proposed Changes. The issue
requiring further consideration would be whether the Proposed Changes would result in
substantially different development. To mount an argument that the Proposed Changes would not
result in substantially different development compared to the Approval, the matters in the above list
extracted from the Development Assessment Rules should be considered; we would suggest by
evidence substantiating that the Proposed Changes do not result in an adverse outcome in terms of
changes to built form and scale, impacts on visual and acoustic amenity, and traffic flow.

We expect it would be difficult to successfully argue that the Proposed Changes do not result in
substantially different development from that under the Approval, due to the increase in visitor
accommodation guests in proportion to the approved maximum, and (likely) associated material
differences in impacts of the visitor accommodation use. For example, we anticipate Council would
raise that the additional guest numbers would increase severity of acoustic amenity impacts,
resulting in substantially different development. Consistent with this suggestion, we note from the
PLM Notes that Council suggests that the proposal (as shown on the Proposal Plans) would need to
be ‘scaled back’ to be considered a minor change. While that is a matter of Council’s
position/opinion (and not a matter of fact or law), which we could consider further subject to



                                                                                              Page 6

Page 8

                                                                                        5 August 2025




receiving technical assessments1 of the effect of the Proposed Changes on the development as
approved, we consider on balance it is more likely than not that the Proposed Changes would not be
considered a minor change.

In these circumstances, and as we understand from our instructions that an Other Change
application would be palatable for you, we do not deliberate further on the prospect of seeking the
Proposed Changes through a Minor Change application.

Alternative change proposal (works to existing building)

As previously noted, you have suggested that it may be an option to seek alternative changes to the
development that involve renovating/extending the existing building to accommodate additional
guests (likely not as many as under the Proposed Changes), instead of a new building as shown on
the Proposal Plans. We understand Council referred to this as an option during the PLM, suggesting a
Minor Change application would be preferable to avoid the need for assessment against the Noosa
Plan 2020 (which would apply to an Other Change Application or MCU application). We understand
there may be some advantages in applying the Noosa Plan 2006 (v.1) to the change application,
however while we have not prepared a comparative assessment of the minimum carparking
requirements under each Planning Scheme, due to the existing site coverage we understand that
providing any further parking for additional guests (however many) would be at least difficult, if
practically possible. We understand Russell Green has advised you about this and additionally, that is
highly unlikely the existing building would be able to be updated to achieve compliance with the
National Construction Code requirements applying to Hostels (under Class 3), relating to fire safety.
Therefore, we have not considered this option further.

MCU Application

We refer to the definition of ‘material change of use’, extracted above.

In consideration of the Approval and the relevant use definitions from the Noosa Plan 2006 (above),
and your instructions about the proposal, we have formed the view that the Proposed Changes meet
the relevant definitions for the approved use of Visitor Accommodation (Type 4).

While not involving the start of a new use of the premises, the Proposed Changes would constitute a
material change of use if they result in a material increase in the intensity or scale of the Visitor
Accommodation (Type 4) use. This is arguable, and for similar reasons as noted above with respect
to the ‘substantially different development’ issue, the advice that follows is provided on the basis
that you are interested in an Other Change application, avoiding the need to argue this point either
way.

A MCU application seeking the Proposed Changes to the development would involve a fresh
assessment of the development as a whole (including that not proposed to be changed, on Lot 5)
against the Council’s Planning Scheme in effect at the time the application is properly made under s
51 of the Act.




1
    Including evidence of the effect of the Proposed Changes as mentioned above.

                                                                                               Page 7

Page 9

                                                                                        5 August 2025




It is important to note that, just because there is a material change of use of premises, does not
mean a MCU application is required. A MCU application could be made for the Proposed Changes,
however, for the reasons set out further below, it is generally advantageous in circumstances such as
these to make an Other Change application, due to the different context and rules that apply to
assessment of these applications.

Other Change application

As noted previously, an Other Change application is a change application other than for a minor
change to an approval.

An Other Change application is the appropriate mechanism for seeking to change an approval where
the proposed changes do not meet the definition of ‘minor change’, such as where the changes
would result in substantially different development from that under the approval. As such, where it
would be unsuitable to make a Minor Change application because the Proposed Changes would
result in substantially different development due to a dramatic change to built form, or increase in
impacts associated with the development under the Approval, an Other Change application may be
made.

The Act does not prohibit the making an Other Change application where the change would be
considered a material change of use, for example because it involves an increase in intensity of the
approved use. Conversely, where an Other Change application is made instead of a Minor Change
application because the proposed change would result in substantially different development, it
stands to reason that in most circumstances, the proposed change involves a material change of use.
We would anticipate that this principle is uncontroversial, consistent with our experience, and the
Other Change applications considered by the Court.

For an Other Change application, as a matter of statutory interpretation, we note the proposed
new/changed development must at least be related to the existing approval to an extent, to satisfy
that the proposal involves a change to the approval and the proposed development is not so
distinct/unrelated that the approval could not be changed to facilitate it, thus necessitating a new
MCU application.

For example, an Other Change application would not be suitable where there is an approval for a
material change of use of premises for a dwelling house and the proposal is to replace the dwelling
house with a commercial development – that proposal involves replacing (rather than adding to) the
development under the approval (being use of premises for a dwelling house), therefore a requiring
a MCU application for the commercial development instead of an Other Change application.

As noted above, we consider that following the Proposed Changes, the development would continue
to operate as Visitor Accommodation (Type 4), therefore no new use of premises is proposed. We
consider it unambiguous that the Proposed Changes to the development on Lot 3, could be
facilitated by a change to the Approval; that is, the proposed development is not so distinct that the
Approval could not be changed to incorporate the Proposed Changes, via an Other Change
application.

Therefore, it is appropriate to seek the Proposed Changes as a change to the Approval – this could
be facilitated through an Other Change application, avoiding the need for a MCU application for a
new approval.


                                                                                               Page 8

Page 10

                                                                                          5 August 2025




We do not agree, nor consider there to be any support at law, for the position of Council as stated in
paragraph 6 of the PLM Notes, as follows:

           ‘The proposal in its current form triggers an Impact consistent development application.
           Should the extent of works relate to a renovation to the existing building, the more
           appropriate application pathway would be an Other Change. Should the works consist of a
           full demolition and redevelopment, a material change of use application is the appropriate
           pathway.’

As mentioned above, we have not formed a view on whether works to a renovate/extend of the
existing building on Lot 3 would require an Other Change application. There is no requirement for an
MCU application to be made, instead of an Other Change application, simply due to the scale of the
Proposed Changes. The Proposed Changes can be sought via an Other Change application to the
Approval, notwithstanding any resultant dramatic changes to built form or impacts of the
development as under the Approval. Although it may be Council’s preference for a MCU application
to be made to facilitate the Proposed Changes (for example, due to the differences in the
assessment framework when compared to an Other Change application), that does not mean a MCU
application is required.

OTHER RELEVANT CONSIDERATIONS: assessment of Other Change application v. MCU application

By way of background, the Other Change application mechanism was introduced to the planning
regime with the commencement of the Act in 2017. Under previous regimes, the only mechanisms
available to change an approval were similar to that of a Minor Change application (e.g. a
‘permissible change’ under the Sustainable Planning Act 2009). The Act introduced a separate
process for change applications other than for a minor change which, relevantly, requires that Other
Change applications be assessed and decided ‘in the context of the development approval’. In
relation to this, the Explanatory Notes for the Planning Bill 2015 provide:

           ‘The intent of the reference to assessing and deciding the change application “in the context
           of the development approval” is that the proposed change should not be considered in
           isolation. Neither however is the entirety of the development including the change re-
           assessed. Instead, it is intended the change be assessed with reference to the context of the
           development approval already existing for the development.’

Before the introduction of the Other Change application mechanism under the Act, if a proponent
wished to make changes to an approved development, but a minor/permissible change application
(or similar) could not be made, for example because the changes would result in substantially
different development, there was no alternative mechanism to change the approval and a new
development application (such as a MCU application) would be required. In that case, while
assessment of any development application must be carried out having regard to any development
approval for the subject premises,2 such MCU applications were not assessed (and subjected to the
assessment provisions in effect at the time) only to the extent relevant to the proposed changes
from the development as previously approved (as is the case for Other Change applications).




2
    For the Act, see the Planning Regulation 2017, ss 27 and 31.

                                                                                                 Page 9

Page 11

                                                                                                  5 August 2025




The Court has considered this distinction between the assessment framework for an impact
assessable development application and an Other Change application, finding that (emphasis
added):3

      [41] It was uncontroversial as between the appellants and corespondent that s 82 of the PA conferred a
      broad discretion on the responsible entity (or this court on appeal) to decide the change application as if
      it were impact assessable…

      [42] I agree the discretion to decide the change application is broad and, subject to contextual changes,
      is guided by, inter alia, relevant principles discussed in Ashvan Investments and Murphy. An important
      contextual change is identified in ss 82(2) and (4) of the PA. Both of these provisions include the phrase
      ‘in the context of the development approval’. The purpose of this phrase is to make clear that the
      assessment and decision making process occurs in the context that the application is one to change an
      existing development approval, as distinct from a fresh development application. In practical terms, this
      means the assessment and decision making process for a change application under s 82 of the PA is
      founded upon, but not limited to:

           a.   an identification of the change/s proposed to the development approval;
           b.   an identification of the planning issues, be they positive or negative, arising for consideration
                as a consequence of the change/s proposed to the development approval; and
           c.   an assessment of the planning issues arising as a consequence of the change/s to the
                development approval, having regard to the requirements of the ‘relevant provisions’, and
                assessment benchmarks, to the extent they are relevant.
       …

      [46] Whilst it can be accepted that the assessment process for a change application under s 82 of the PA
      involves more than a comparison of approved and amended plans, it is of little assistance to describe
      the assessment, in general terms, as broad or narrow. This is because the breadth of an assessment will
      be a product of the precise changes proposed to an approval, and the planning issues arising for
      consideration as a consequence of those changes. In some cases, the extent of change may require a
      broad assessment. In other cases, the extent of the change may require a more limited assessment. No
      hard and fast rule can be prescribed as a consequence. It will inevitably turn on the facts and
      circumstances of each case. Two points can however be made with certainty about the breadth of an
      assessment under s 82 of the PA.

      [47] Having regard to s 82 of the PA, it is clear the assessment process does not require the
      development, including the change, to be assessed as if it were a fresh development application. Nor
      does the exercise involve an assessment of the changes proposed in isolation, or out of context…”
      (footnotes omitted).

Therefore, while both an Other Change application and MCU application would require impact
assessment (including public notification) against the current version of the Noosa Plan 2020,
making an Other Change application is often advantageous due to the differences in the assessment
and decision-making framework.

Applying the above framework for Other Change applications, in relation to making such an
application for the Proposed Changes, we note:



3
 Catterall & Ors v Moreton Bay Regional Council & Anor [2020] QPEC 52; see also, Upan Company Pty Ltd v
Gold Coast City Council [2022] QCA 75.

                                                                                                         Page 10

Page 12

                                                                                       5 August 2025




   1. planning instruments/assessment provisions that are in effect at the time of the application,
      and that would apply if it were a MCU application (such as the Noosa Plan 2020), will be
      relevant for assessing the application, though weight may be given to those that were in
      effect at the time of the original development application (such as the Noosa Plan 2006);

   2. assessment matters, including matters that Council must assess against (e.g. assessment
      benchmarks under the Noosa Plan 2020) and have regard to (e.g. public submissions), will
      only apply to the extent they relate to a consequence of the Proposed Changes (against the
      background of the Approval), and any non-compliance of the existing development under
      the Approval will not be relevant to assessment of the change application;

           a. this is particularly relevant noting from the PLM Notes, that Council refers to
              amendments made to the Medium Density Residential Zone Code to reinforce the
              purpose of the Zone ‘to ensure it is designated for housing permanent residents’,
              which is not relevant to assessment of the Proposed Changes in the context of the
              Approval, which already permits the ‘incompatible’ land use, therefore not being an
              issue brought about by the Proposed Changes;

   3. where the Proposed Changes do not relate to a particular component of the development
      (e.g. the existing development on Lot 5), any planning provision/assessment matter relating
      to those aspects of the development (in isolation) ought not apply when assessing the
      application;

   4. considering provisions dealing with physical aspects of development in the context of the
      Approval, may mean that non-compliance with say, a setback requirement, is irrelevant or
      given less weight should the proposed setback be equal to or greater than that under the
      Approval (or if, considering the Proposed Changes as a whole, the proposal achieves an
      improved outcome in terms of visual amenity, for example);

   5. it is important to consider the Proposed Changes as a whole, when determining the
      relevance of a provision to the assessment of the application (e.g. in the case of a provision
      dealing with separation distance to manage noise impacts associated with the development,
      the provision may still be applicable even if the Proposed Changes do not affect the
      separation distance from that under the Approval, due to the proposed increase in guest
      numbers/use intensity and related effects on noise generation);

   6. following on from above, the scope of assessment matters relevant to the application will
      vary depending on the changes proposed to the Approval and associated impacts –
      generally, the less the proposal deviates from the Approval/Approved Plans, the more
      narrow the assessment (and less the Noosa Plan will apply or be relevant).

We recommend that in preparing application material for an Other Change application:

   7. the supporting material (including the proposed plans and impact assessment reports) bear
      in mind the above matters relevant to the assessment framework, particularly by making
      clear what aspects of the development are approved, what aspects are proposed to be
      introduced/changed and what aspects are proposed to remain unchanged, and when
      assessing impacts of the development, to the greatest extent possible highlighting (or
      separating, if appropriate) the impacts caused by the Proposed Changes in comparison to
      those under the Approval;

                                                                                            Page 11

Page 13

                                                                                       5 August 2025




    8. while perhaps of limited relevance in the context of assessment of the Proposed Changes,
       the application material and proposal plans should show/detail the whole of the
       development (on Lots 3 and 5) incorporating the Proposed Changes (identifying what
       existing aspects are not proposed to be changed, as noted above) – we expect this would be
       especially beneficial for the purposes of public notification of the application;

    9. where the Proposed Changes result in an improved outcome as compared to the Approval
       (e.g. in terms of building design or if additional mitigation measures/treatments are
       proposed, say for noise attenuation), it would be beneficial to emphasise these matters as
       reasons in support of approval.

CONCLUSION

We consider that making an Other Change application in these circumstances aligns with the
legislative intent behind the introduction of this application mechanism under the Act. We have
reached the conclusion that there is no reason at law, why a MCU application would be a more
appropriate mechanism for seeking to make the Proposed Changes to the Approval.

Conversely, there are likely considerable advantages in making an Other Change application, due to
the distinction in assessment and decision-making framework as compared to that of a MCU
Application.

Unlike a MCU application, an Other Change application does not present an opportunity for a fresh
assessment of the development against the current planning instruments. The degree and extent of
assessment required for an Other Change application will vary depending on the nature of the
proposed changes against the backdrop of the original approval, as only planning issues that arise as
a consequence of the proposed changes are to be considered.

We have not been able to identify any reason in support of Council’s position as stated in paragraph
6 of the PLM Notes, however we note it may only be that Council would prefer for a MCU
application to be made to facilitate the Proposed Changes, due to the abovementioned distinction to
the assessment and decision-making framework for Other Change applications and associated
impact on the relevance of, and weight to be given to, its current Planning Scheme.

We trust this advice will assist you to progress with this project and we invite you to contact us
should you wish to discuss, or if you have any further queries.

Yours faithfully




Cara Erskine LLB (Hons)
Associate - Maroochydore Office
e [email protected]




                                                                                             Page 12

Page 14

a

G

STRATEGIC

STRATEGIC SOLUTIONS,
CREATIVE THINKING

rgstrategic.com.au

 

Used in these records

About this file

File size
677 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

App D - Legal Review.pdf · 677 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.