Skip to the record
The only place to find full transcripts.

Council archive · source document

App D - Legal Review · 132008.299.02

of 14

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                            5 August 2025




    2. changes to carparking provision on Lot 3 (from 2 guest spaces to 4, and from double garage
       to 1 staff scape);
    3. reduction in area dedicated to a manager’s residence and decreased occupant capacity
       (from 3 bedrooms, shared bathroom, living/kitchen/dining room, manager’s office, staff
       room and balcony, home theatre and balcony, to 1 staff bedroom);
    4. increase in dorms, from 3 to 12;
    5. providing capacity to accommodate an additional 42 guests (for short-term accommodation
       catering to backpackers/tourists, consistent with existing operations on site), increasing the
       maximum capacity of the development (including as approved on Lot 5, 14 Duke Street) to
       102 visitor accommodation guests (from 60);
    6. associated changes to outdoor areas, including replacement of the pool in the north-eastern
       corner with a terrace;
    7. associated changes in built form and development footprint on Lot 3, including:
            a. reduced site coverage;
            b. reduced gross floor area;
            c. changes to setbacks (increased to the rear and to Duke St and Douglas St, reduced to
               the unconstructed road to the west/between Lot 3 and Lot 5);
            d. in parts, increased building height (noting the existing building on the Approved
               Plans does not have a complete second-storey).

LEGAL FRAMEWORK: seeking approval of Proposed Changes

The following application types under the Planning Act 2016 (the Act) are relevant to this advice:

    1. a development application made under s 50, for a development approval to carry out a
       ‘material change of use’ that is assessable development (MCU Application);
    2. an application to change a development approval under s 78, either for:
            a. a ‘minor change’ to the Approval (Minor Change application); or
            b. changes ‘other than’ a minor change, to the Approval (Other Change application).

The following definitions from schedule 2 of the Act are relevant:

    •   material change of use, of premises, means any of the following that a regulation made
        under section 284(2)(a) does not prescribe to be minor change of use—
            (a) the start of a new use of the premises;
            (b) the re-establishment on the premises of a use that has been abandoned;
            (c) a material increase in the intensity or scale of the use of the premises.

    •   minor change means a change that—
        …
           (b) for a development approval—
                     i. would not result in substantially different development; and


                                                                                                  Page 4

Used in these records

About this file

File size
677 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

App D - Legal Review.pdf · 677 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.