PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                  10 NOVEMBER 2020


The intent of this specific outcome is unclear but it is understood that this requirement is a historical
one, when boat lifting devices were visually quite substantial. The types of floating boat lifting
devices have changed over time and there are a number of devices now that are more discrete in
their design. The current Floating Pontoon or Mattress type boatlifting device sit approximately
300mm-400mm above water level when not containing a boat and as such is reasonably
unobtrusive. In this instance the boat lifting device is attached to the jetty walkway and is located
in behind the jetty head and will not impact on views from the waterway or be visually prominent
on the waterway.
This issue has been raised with Council’s Strategic Planning team for consideration in future
amendments to the Noosa Plan 2020.
Relocation of kayak access steps to the jetty
The proposed relocation of the kayak access steps raises no planning or engineering issues.
It is recommended that Council agree to change the approved plans table to reference the new
design plans and to read as follows:
  Plan No.     Rev.   Plan/Document Name                                                  Date
  S01          C2     Drawing Schedule & Transmittal prepared by Long View Consulting     12 June 2020
                      Engineers
  S02          C2     Structural Notes Sheet prepared by Long View Consulting             12 June 2020
                      Engineers
  S03          C2     Site Plan, Framing Plan, Elevations prepared by Long View           12 June 2020
                      Consulting Engineers
  S04          C2     Jetty Framing Details prepared by Long View Consulting Engineers    12 June 2020


Condition 6
No boatlifting devices are to be attached or moored at the jetty structure for the purpose of elevating
a vessel above the water without Council approval.
Applicant’s Request
It is proposed that Condition 6 be deleted. Condition 1 specifies that the jetty must be built in
accordance with the approved (revised) plans, including the proposed jet ski dry storage pontoon.
As such, any additional structures fitted to the jetty would not comply with the approval. Therefore,
the requirement of Condition 6 is not necessary.
Assessment of Request
As the boat lifting device in this instance is recommended for approval it is recommended that the
condition be amended to reflect that only 1 boatlifting device is approved as per the approved plans
of development.


Consultation
External Consultation - Community & Stakeholder
Queensland Treasury (SARA) response, reference 2007-17601 SRA dated 12 August 2020. The
response supports the proposed structures
Internal Consultation
Nil




                                                                                        Page 14 of 113
Log in to download the original file

2020-11-10 Planning & Environment Committee Agenda(PDF, 8MB).pdf · 8.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗