Original source · versioned page text
11347 Traffic Engineering Report - Poultry Farm- Cooroy (RFI August 2013)
Very large file: it may take a few minutes
The original of this document is very large (16.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Traffic Engineering Report 11347
MCU: Agricultural Use Poultry Farm
Milligan Farms
August 2013
Photograph 7b – Existing Driveway Access in wet conditions
7.1 Delineation
The delineation along various sections of Top Forestry Road is inadequate. Therefore
it is recommended that guideposts be installed as per Clause 3.2.4 of Part 2 of the
MUTCD along Top Forestry Road. Guide Posts should be provided at, or near, the
edge of the road formation with a recommended clearance between opposite guide
posts of 6.2m minimum. It is recommended that guide posts be provided at a spacing
of 300m on straight sections of road with 60m minimum spacing on curves.
Guideposts are to be provided at all creek crossings (floodways) at a spacing of 25m
maximum with posts provided in pairs, one each side of the formation.
Photograph 8 - No Delineation Provided on Curves
Page 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.